Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 59 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 2 | 1 | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) | Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Akkshara CountyApplied for completion 24/06/2022 | G KRISHNA KUMAR | Plot | – | Jul 2021 |
| Alur Phase 2Lapsed · completion date passed | Bangalore Development Authority | Apartment | 1,781 sqft carpet (as filed) | Mar 2018 |
| Arine Golden BellsLapsed · completion date passed | M/s.Arine Structures | Mixed development | – | Apr 2022 |
| Artemis Address (In Association With Mythreyi)Applied for completion 31/12/2025 | INDIABUILD REAL ESTATES PVT LTD | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
| Artemis Address Phase 2Active · 95% built | Address Maker | Plot | 1,200–1,500 sqft | Dec 2027 |
8 of 72 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
All 75 projects in Tumkur Road → · DS-Max Properties's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open DS Max Sky Sanjeevini in the interactive atlas
Transfer of the land
Sale deed
Survey 26/2
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bengaluru · Survey 26/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan NPA/CC/80/2022-23
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · 0 · Survey 26/2
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/060923/006244
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 26/2 | |
|---|---|---|
| Land extent, Sy 26/2 | 1 Acre 20 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 6,070 sq m | |
| Khata | E Khatha · 0 · 26 Jun 2023 | |
| Sale deed | registered 27 Sep 2021 | |
Valid as of this reportValidity ended
| Building plan (Local Planning Authority) | Sanctioned 3 Jun 2023 · No. NPA/CC/80/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/438/2022 · issued 5 Jan 2023 · building height 29.45 m | Clear |
| Environmental clearance | SEIAA 21 CON 2023 · EC identification no. EC23B038KA112500 · issued 28 Mar 2023 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-335401 · issued 7 Jan 2023 · valid until 6 Jan 2028 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Aug 2027 |
| Land conversion | Converted 8 Sep 2022 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 26/2 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
2BHK · avg 63 m² 61.3%3BHK · avg 78 m² 38.2%1BHK · 46 m² 0.5%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 1BHK | 1 | 495 |
| 2BHK | 133 | 673 |
| 3BHK | 83 | 838 |
| Sold, Q2 2026-27 | 115 / 217 | |
|---|---|---|
| Unsold, Q2 2026-27 | 102 | |
| Months to sell, derived from filed bookings | Too few bookings to project (4 flats booked in 9 months) |
| Vruksha Greens | 8.3 km | Locked | |
|---|---|---|---|
| Royal Enclave | about 11.5 km | Locked | |
| Rubby Castle 1 | about 11.5 km | Locked |
| DS Max Sky Sanjeevini This project | This project is the point the others are measured from | 31 Aug 2027 | 53% (115 of 217) | Not verified yet |
|---|---|---|---|---|
| Vruksha Greens | 8.3 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Royal Enclave | about 11.5 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
| Rubby Castle 1 | about 11.5 km |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 6.9 km, Shambhavinagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 2.7 km to the south-east, Arkavati, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 190 m to the north-east, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (217 covered spaces for 217 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 100% · planned by 14 Nov 2024 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 13 Apr 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 99% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Aug 2027 | |
| RERA completion date | 31 Aug 2027 | |
| Work began, as filed | 1 Sep 2023 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 29.45 m on the fire NOC · 29.45 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 56 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/438/2022 · issued 5 Jan 2023 · building height 29.45 m | |
| Environmental clearance | SEIAA 21 CON 2023 · EC identification no. EC23B038KA112500 · issued 28 Mar 2023 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 25 May 2023 · site inspected 6 Mar 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹50.0 L 1%Development · ₹47.91 Cr 99%
| Estimated cost | ₹48.41 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹36.97 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (115) 53%Unsold (102) 47%
| Sold, Q3 2025-26 | 111 / 217 · 106 available | |
|---|---|---|
| Sold, Q4 2025-26 | 116 / 217 · 101 available | |
| Sold, Q1 2026-27 | 114 / 217 · 103 available | |
| Sold, Q2 2026-27 | 115 / 217 · 102 available | |
| Unsold, Q2 2026-27 | 102 | |
| Sold in Q4 2025-26 | 5 | |
| Sold in Q1 2026-27 | 2 bookings cancelled or corrected (116 → 114 sold) | |
| Sold in Q2 2026-27 | 1 | |
| Flats booked, Form 4 Q4 2025-26 | 116 |
| Escrow bank | STATE BANK OF INDIA · SME Mahadevapura, Bengaluru | |
|---|---|---|
| Designated account, collected | ₹1.67 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹1.67 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Share of collections deposited in escrow | 100% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 47 | |
|---|---|---|
| Marked completed | 26 | |
| Past promised date, not completed | 6 | |
| Complaints filed against the promoter | 19 | |
| Other phases under this promoter name | 39 | |
| With a filed extension or completion | 22 (19 completed, 3 extended) | |
| Average schedule slip | 22 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 3 Jun 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · SME Mahadevapura, Bengaluru | |

| 30 Apr 2029 |
| 25% (8 of 32) |
| Locked |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Gramapanchyath) | |
| Nearest city water main | 7.1 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 2.7 km to the south-east, Arkavati, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 5.1 km, Madavara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 47.1 | 51 | 31.1 |
| MG Road (CBD) | 25.9 | 30 | 21.6 |
| Manyata Tech Park | 24.6 | 30 | 20.0 |
| ITPL, Whitefield | 40.5 | 47 | 34.1 |
| Ecospace, Bellandur ORR | 39.5 | 48 | 31.8 |
| Electronic City Ph 1 | 51.4 | 42 | 38.0 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 770 m to the east |