Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) | Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Akkshara CountyApplied for completion 24/06/2022 | G KRISHNA KUMAR | Plot | – | Jul 2021 |
| Arine Golden BellsLapsed · completion date passed | M/s.Arine Structures | Mixed development | – | Apr 2022 |
| Artemis Address (In Association With Mythreyi)Applied for completion 31/12/2025 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 3 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Location & risks | – | 2 | 1 | Review |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| INDIABUILD REAL ESTATES PVT LTD |
| Plot |
| ~1,200–1,530 sqft (estimate: filed carpet plus 25%) |
| Dec 2025 |
| Artemis Address Phase 2Active · 95% built | Address Maker | Plot | 1,200–1,500 sqft | Dec 2027 |
| Artemis ArenaActive · 100% built | MYTHREYI ADDRESS LLP | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2026 |
8 of 72 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Alur Phase 2 in the interactive atlas
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | Survey 30, 31 (Vaderahalli) |
| East | EC schedule not read yet | Survey 116 (Alur) |
| South | EC schedule not read yet | Survey 112 (Alur) |
| West | EC schedule not read yet | Survey 113 (Alur) |
Page 1
Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 2 pages.
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Matched plots on the KGIS map | 2,28,872 sq m | |
| Land area filed with K-RERA | 1,11,692 sq m | |
| Filed area as a share of the KGIS plots' area | 49% | |
| Village, hobli and taluk on the KGIS map | Alur, Dasanapura-1 hobli, Bangalore-North taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Area on the KGIS map | 2,28,872 sq m, 2 of 2 filed survey numbers | |
|---|---|---|
| Land area of this registration | 1,11,692 sq m |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 114 | 4 | 27 acres 27 guntas | 0 | |||
| Sy. No. 115 | 9 | 20 acres 18 guntas | 1 |
| Building plan (BDA) | Not verified yet | |
|---|---|---|
| Power NOC (BESCOM) | Not verified yet | |
| Fire NOC | Not verified yet | |
| Environmental clearance | issued 31 Mar 2016 | Clear |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2018 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Vruksha Greens | 7.6 km | Locked | |
|---|---|---|---|
| Rubby Castle 1 | about 11 km | Locked | |
| Royal Enclave | about 11 km | Locked | |
| Shriram Solitaire | about 11.5 km | Locked |
| Alur Phase 2 This project | This project is the point the others are measured from | 31 Mar 2018 | Not filed | Not verified yet |
|---|---|---|---|---|
| Vruksha Greens | 7.6 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Rubby Castle 1 | about 11 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
| Royal Enclave | about 11 km |
| Projects within 4 km, counted | 1 | |
|---|---|---|
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture, at the filed pin | Review |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 290 m from the filed location | Clear |
| Nearest government-flagged flood location | 6.3 km, Siddeswara Layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 2.1 km to the south-east, Arkavati, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 380 m to the north-east, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Mar 2018 | Red flag |
| Work began, as filed | 20 Jul 2014 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | issued 31 Mar 2016 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹10.63 Cr 6%Development · ₹166.68 Cr 94%
| Estimated cost | ₹177.31 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Canara Bank · BDA Complex | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 15 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 9 | Review |
| Revoked or withdrawn | 2 | |
| Complaints filed against the promoter | 45 |
| Developer's project loan |
|---|
| Not verified yet |
| Records searched to | Not verified yet | |
|---|---|---|
| Building plan | Not verified yet | |
|---|---|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| Sale deed in favour of | Not verified yet | |
|---|---|---|
| Escrow bank | Canara Bank · BDA Complex |
|---|
| 31 Mar 2027 |
| 73% (44 of 60) |
| Locked |
| Shriram Solitaire | about 11.5 km | 15 May 2026 | 100% (269 of 269) | Locked |
|---|
| Flats in them |
|---|
| 217 |
| Booked | 115 of 217 (53%) |
|---|
| Unsold | 102 |
|---|
| Booked a month, pooled | 0 flats |
|---|
| Months to sell, pooled | 230 months |
|---|
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 6.4 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 2.1 km to the south-east, Arkavati, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 4.7 km, Madavara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 30.2 |
| MG Road (CBD) | 21.0 |
| Manyata Tech Park | 19.3 |
| ITPL, Whitefield | 33.4 |
| Ecospace, Bellandur ORR | 31.2 |
| Electronic City Ph 1 | 37.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 120 m to the south-west |