Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) | Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Alur Phase 2Lapsed · completion date passed | Bangalore Development Authority | Apartment | 1,781 sqft carpet (as filed) | Mar 2018 |
| Arine Golden BellsLapsed · completion date passed | M/s.Arine Structures | Mixed development | – | Apr 2022 |
| Artemis Address (In Association With Mythreyi) |
Title & ownership
Approvals
Disputes & cases
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 9 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Valuation |
|---|
| – |
| – |
| – |
| Not verified |
| Location & risks | – | 1 | 1 | Review |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| INDIABUILD REAL ESTATES PVT LTD |
| Plot |
| ~1,200–1,530 sqft (estimate: filed carpet plus 25%) |
| Dec 2025 |
| Artemis Address Phase 2Active · 95% built | Address Maker | Plot | 1,200–1,500 sqft | Dec 2027 |
| Artemis ArenaActive · 100% built | MYTHREYI ADDRESS LLP | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2026 |
8 of 72 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Akkshara County in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (Local Planning Authority) | Sanctioned 14 Feb 2018 · No. NPA L A O 44/2017-18 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 29 Jul 2021 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 63/1, 63/1 | Converted 22 Jun 2012 · DEPUTY COMMISSIONER OFFICE, BANGALORE RURAL DISTRICT | |
| Sy 63/3, 64/2, 64/3 | Converted 2 Dec 2010 · DEPUTY COMMISSIONER OFFICE, BANGALORE RURAL DISTRICT | |
| Survey numbers | 63/1 · 63/1 · 63/3 · 64/2 · 64/3 |
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Vruksha Greens | 10.5 km | Locked |
|---|
| Akkshara County This project | This project is the point the others are measured from | 29 Jul 2021 | Not filed | Not verified yet |
|---|---|---|---|---|
| Vruksha Greens | 10.5 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Projects within 4 km, counted | 1 | |
|---|---|---|
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 76% Residential (main), 18% Transport & communication | |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 220 kV, 140 m from the filed location | Clear |
| Nearest government-flagged flood location | 7.7 km, Shambhavinagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 600 m to the north-west, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Kitchen handover | Not verified yet | |
|---|---|---|
| Sewage plant | Sewage treatment plant | |
| Power backup | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 29 Jul 2021 | |
| Completion date, agreement | 29 Jul 2021 | |
| Work began, as filed | 12 Jun 2019 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not verified yet | |
| Sewage plant | Sewage treatment plant | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 23 Mar 2022 · site inspected 21 Mar 2022 | |
| Engineer's certificate, registration | Dated 22 Mar 2022 | |
| Chartered accountant's certificate, registration | Dated 7 Apr 2022 | |
Land · ₹30.98 Cr 85.4%Development · ₹5.30 Cr 14.6%
| Estimated cost | ₹36.29 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹5.30 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · Banashankari 3rd Stage Branch | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 14 Feb 2018 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · Banashankari 3rd Stage Branch | |
| Flats in them |
|---|
| 217 |
| Booked | 115 of 217 (53%) |
|---|
| Unsold | 102 |
|---|
| Booked a month, pooled | 0 flats |
|---|
| Months to sell, pooled | 230 months |
|---|
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.1 m
Across Nelamangala, the water table sat 27.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.1 m, and it recovered 7.7 m over the year.
| Groundwater | Nelamangala taluk average, July 2023: 27.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 9.4 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | 6.5 km, Madavara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 34.3 |
| MG Road (CBD) | 22.9 |
| Manyata Tech Park | 22.4 |
| ITPL, Whitefield | 36.2 |
| Ecospace, Bellandur ORR | 33.1 |
| Electronic City Ph 1 | 38.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.9 km to the north-west, named Nelamangala Substation on OpenStreetMap |