Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| Advaitha AkshaCompleted · OC 10-03-2022 | Advaitha ventures Pvt Ltd | Apartment | 1,567 sqft carpet (as filed) | Completed |
| Arihant VilayaLapsed · completion date passed | ARIHANT FOUNDATIONS AND HOUSING LIMITED | Apartment | – | Dec 2023 |
| Aydin Infra Signature 3Active · 85% built | AYDIN INFRA | Apartment | 1,167–1,832 sqft carpet (as filed) | Aug 2027 |
| BelakuLapsed · completion date passed | Millennial Luxury Estates Private Limited | Apartment | 2,284–2,621 sqft carpet (as filed) | Mar 2026 |
| Gp AdityaCompleted · OC 16-01-2024 | VIJAYA LAKSHMI CONSTRUCTIONS | Apartment | 891 sqft carpet (as filed) | Completed |
| Green FontanaLapsed · completion date passed | GREEN CARS PVT LTD | Apartment | – | Dec 2019 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 17 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Hamiton TowersCompleted · OC 12-02-2024 | Pelagsus Infrastructures Pvt Ltd | Apartment | 2,160 sqft carpet (as filed) | Completed |
| Heavie HalcyonActive · 21% built | Sentient Devcon LLP | Apartment | 1,013–1,495 sqft carpet (as filed) | Aug 2027 |
8 of 21 other projects in Koramangala, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Telosa in the interactive atlas
Transfer of the land
Title deed registered
No. BMH-1-02791-2023-24 · Book 1 · executed 13 Jun 2023 · Consideration ₹5.00 Cr · Begur hobli, Bangalore South taluk
Title deed filed with K-RERA, pp. 1, 4, 8, 12 · See it in Documents
Transfer of the land
Sale deed
in favour of KINGLIFE INFRA PRIVATE LIMITED · Survey SITE NO. 152
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BDA · Survey SITE NO. 152
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com/SUT/0714/2023-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/060324/006688
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 12 Oct 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | SITE NO. 152 | |
|---|---|---|
| Land extent, Sy SITE NO. 152 | 628 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 628 sq m | |
| Khata | A Khatha · BDA · 12 Jul 2023 | |
| Sale deed | Dated 13 Jun 2023 | |
| Sale deed in favour of | KINGLIFE INFRA PRIVATE LIMITED | |
| Building plan (BBMP) | Sanctioned 29 Aug 2023 · No. BBMP/Ad.Com/SUT/0714/2023-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2030 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | SITE NO. 152 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 188 m² 75%4BHK 25%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 3BHK | 6 | 12,142 |
| 4BHK | 2 | 5,339 |
| Aydin Infra Signature 3 | about 0.5 km | Locked | |
|---|---|---|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 1 km | Locked | |
| Century Regalia (Project 2) | about 3.5 km | Locked | |
| Ranka Iris | about 4 km | Locked |
| Telosa This project | This project is the point the others are measured from | 31 Mar 2030 | Not filed | Not verified yet |
|---|---|---|---|---|
| Aydin Infra Signature 3 | about 0.5 km | 5 Aug 2027 | 50% (6 of 12) | Locked |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 1 km | 30 Dec 2030 | 25% (38 of 150) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, SRINIVAGILU TANK BED LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, K100 | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.63 (13 covered spaces for 8 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | 31 Mar 2030 | |
|---|---|---|
| Schedule end | 31 Mar 2030 | |
| RERA completion date | 31 Mar 2030 | |
| Work began, as filed | 1 Feb 2024 |
| Structure | RCC framed structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | External walls: 6" | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.4 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 20 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 22 Jan 2024 | |
| Engineer's certificate, registration | Dated 5 Feb 2024 | |
| Chartered accountant's certificate, registration | Dated 20 Jan 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹5.19 Cr 47.2%Development · ₹5.81 Cr 52.8%
| Estimated cost | ₹11.00 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹5.81 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · KINGLIFE INFRA PRIVATE LIMITED-RERA Designated Account for TELOSA | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 12 Oct 2023 | Review |
| Building plan (BBMP) | Sanctioned 29 Aug 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · KINGLIFE INFRA PRIVATE LIMITED-RERA Designated Account for TELOSA | |
| Pacific Legacy | about 4.5 km | Locked |
|---|
| Abhee Riviera Royale | about 4.5 km | Locked |
|---|
| Dhiraan Lotus | about 4.5 km | Locked |
|---|
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 5.5 km | Locked |
|---|
| Adarsh Rosewood | about 6 km | Locked |
|---|
| Mahindra Zen | about 6 km | Locked |
|---|
| Mahindra NewHaven | about 6 km | Locked |
|---|
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 6.5 km | Locked |
|---|
| Century Regalia (Project 2) | about 3.5 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
|---|
| Ranka Iris | about 4 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
|---|
| Pacific Legacy | about 4.5 km | 31 Dec 2025 | 20% (8 of 40) | Locked |
|---|
| Abhee Riviera Royale | about 4.5 km | 28 Feb 2027 | 59% (57 of 96) | Locked |
|---|
| Projects within 4 km, counted | 20 (20 with an approximate location) | |
|---|---|---|
| Flats in them | 2,144 | |
| Booked | 1,292 of 2,144 (60%) | |
| Unsold | 852 | |
| Booked a month, pooled | 29 flats | |
| Months to sell, pooled | 30 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 1 km, Agara | |
| Kempegowda Airport | 31 |
| MG Road (CBD) | 6.5 |
| Manyata Tech Park | 13 |
| ITPL, Whitefield | 12.5 |
| Ecospace, Bellandur ORR | 4.5 |
| Electronic City Ph 1 | 10.5 |
| Landfill or waste transfer station | about 2 km to the north-west | |
|---|---|---|
| Sewage treatment plant | about 0.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km |