| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 2 sections
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 70 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Akruti ArkLapsed · completion date passed | Akruti Homes Bangalore Private Limited | Apartment | – | Jul 2024 |
| Arun ConstructionsCompleted (regulator flag) | ARUN CONSTRUCTIONS | Apartment | 854 sqft carpet (as filed) | Completed |
| Assetz Canvas & Cove - Phase 1 Wing A & BActive · 100% built | APG HABITAT PRIVATE LIMITED | Apartment | 266–820 sqft carpet (as filed) | Apr 2027 |
| Assetz Canvas & Cove 2.0 - Block AActive · 65% built | APG HABITAT PRIVATE LIMITED | Apartment | 298–1,143 sqft carpet (as filed) | Apr 2029 |
| Assetz Canvas & Cove 2.0 – Block B & CActive · 74% built | APG HABITAT PRIVATE LIMITED | Apartment | 277–1,141 sqft carpet (as filed) | Oct 2028 |
| Aswani SunshineLapsed · completion date passed | Aswani Properties India Pvt Ltd | Apartment | 377 sqft carpet (as filed) | Jul 2019 |
| Blossom ParkCompleted (regulator flag) | Elita Enterprises LLP | Plot | ~1,200 sqft (estimate: filed carpet plus 25%) | Completed |
| BrindavanLapsed · completion date passed | Sri Krishna Group | Apartment | 575 sqft carpet (as filed) | Dec 2024 |
8 of 64 other projects in Hosur Road, A to Z. Status is taken from each project's own filing.
All 70 projects in Hosur Road → · Mahindra Lifespaces's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mahindra NewHaven in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner, Bangalore · Survey 62
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Mahindra Lifespace Developers Limited · Survey 62
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 62
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDSOUTH/0043/24-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/160425/007668
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 62 | |
|---|---|---|
| Land extent, Sy 62 | 02 Acres 15 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 9,611 sq m | |
| Khata | A Khatha · BBMP · 17 Sep 2024 | |
| Sale deed | Dated 3 Jul 2024 | |
| Sale deed in favour of | Mahindra Lifespace Developers Limited | |
| Building plan (BBMP) | Sanctioned 9 Apr 2025 · No. BBMP/Addl.Dir/JDSOUTH/0043/24-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 28 Dec 2029 |
| Land conversion | Converted 29 May 2024 · Deputy Commissioner, Bangalore | |
|---|---|---|
| Survey numbers | 62 |
₹99 for this report opens Valuation and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation and Disputes & cases for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 370 m, SUBASH NAGARA | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 260 m to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 90 m to the south-west, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Piped Gas, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.16 (138 covered spaces for 119 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | Not started · planned by 31 Jan 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 4 Jul 2029 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 8% | |
| Completion, accountant | 31.5% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 28 Dec 2029 | |
| RERA completion date | 28 Dec 2029 | |
| Work began, as filed | 1 Mar 2025 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 78.5 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 68.53 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 5 Mar 2025 | |
| Engineer's certificate, registration | Dated 5 Mar 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹62.50 Cr 32.4%Development · ₹130.64 Cr 67.6%
| Estimated cost | ₹193.14 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹118.31 Cr | |
| Cost incurred | ₹60.83 Cr (31.5% of the estimate) | |
| Cost left | ₹132.31 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹190.30 Cr | |
| Land cost revision | Not verified yet | |
Sold (106) 89.1%Unsold (13) 10.9%
| Sold, Q3 2025-26 | 103 / 119 · 16 available | |
|---|---|---|
| Sold, Q4 2025-26 | 103 / 119 · 16 available | |
| Sold, Q1 2026-27 | 103 / 119 · 16 available | |
| Sold, Q2 2026-27 | 106 / 119 · 13 available | |
| Unsold, Q2 2026-27 | 13 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 3 |
| Escrow bank | Axis Bank · Nitesh Times Square Building No.08, 3rd Floor, M.G. Road, Bangalore | |
|---|---|---|
| Designated account, collected | ₹19.85 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹7.15 Cr in Q2 2026-27 (36% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 7 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 4 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 9 Apr 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Nitesh Times Square Building No.08, 3rd Floor, M.G. Road, Bangalore | |

Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 220 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 260 m to the west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 1.0 km, Singasnadra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 37.0 |
| MG Road (CBD) | 12.4 |
| Manyata Tech Park | 19.4 |
| ITPL, Whitefield | 16.3 |
| Ecospace, Bellandur ORR | 7.2 |
| Electronic City Ph 1 | 5.2 |
| Landfill or waste transfer station | 2.0 km to the south | |
|---|---|---|
| Sewage treatment plant | 1.4 km to the north, named Chikkabeguru Sewage Treatment Plant on OpenStreetMap | |
| Quarry | 2.0 km to the south-west | |
| Crematorium | 2.5 km to the north, named Kudlu Crematorium on OpenStreetMap | |
| Prison | 2.3 km to the east, named Bangalore Central Jail on OpenStreetMap | |
| Electrical substation | 1.6 km to the east, named Naganathapura Substation on OpenStreetMap |