Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone Illumina |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 40 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| SRIVARI DWELLINGS |
| Apartment |
| 793–1,071 sqft carpet (as filed) |
| Dec 2028 |
| Amidst NatureExtended to 20-07-2027 | CLIMATE CONNECTIONS | Plot | ~1,500–2,800 sqft (estimate: filed carpet plus 25%) | Jul 2025 |
8 of 151 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Posch in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner, Bangalore · Survey 12, 21/1
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Sy 12, Uttrahalli hobli, Bangalore South taluk; Sy 21/1; 21, Uttrahalli hobli, Bangalore South taluk · 18 Guntas
Title deed filed with K-RERA, pp. 1, 23 · See it in Documents
Approval or registration
Khata issued
A Khatha · BBMP · Survey 12, 21/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDSOUTH/0030/25-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/270426/008603
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 3 Dec 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: 14 ADLR Survey Sketch, 1 page, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 12, Survey No. 21/1 | |
|---|---|---|
| Land extent, Sy 12 | 1 Acre 2.08 Guntas | |
| Land extent, Sy Survey No. 21/1 | 18 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 5,824 sq m | |
| Khata | A Khatha · BBMP · 23 Jun 2025 | |
| Building plan (BBMP) | Sanctioned 4 Apr 2026 · No. BBMP/Addl.Dir/JDSOUTH/0030/25-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/443/2024 · issued 5 Dec 2024 · building height 49.98 m | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 7 Feb 2026 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Dec 2031 |
| Land conversion | Converted 30 May 2016 · Deputy Commissioner, Bangalore | |
|---|---|---|
| Survey numbers | 12 · Survey No. 21/1 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 118 m² 59%4BHK · avg 151 m² 41%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK | 46 | 1,265 |
| 4BHK | 32 | 1,628 |
| Sold, Q2 2026-27 | 22 / 78 | |
|---|---|---|
| Unsold, Q2 2026-27 | 56 | |
| Months to sell, derived from filed bookings | 12 months |
| Srivara Vasudha | about 1 km | Locked | |
|---|---|---|---|
| Garden Square | about 1.5 km | Locked | |
| Mahindra Eden Phase-2 | about 2 km | Locked | |
| Song Of Wind | about 2.5 km | Locked | |
| Sattva Forest Ridge | about 3 km | Locked |
| Posch This project | This project is the point the others are measured from | 30 Dec 2031 | 28% (22 of 78) | Not verified yet |
|---|---|---|---|---|
| Srivara Vasudha | about 1 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
| Garden Square | about 1.5 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
| Mahindra Eden Phase-2 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Raghuvanahalli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.95 (74 covered spaces for 78 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement
| Main structure | Not started · planned by 15 Apr 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Dec 2030 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 11% | |
| Completion, accountant | 12.1% of the estimated cost spent | |
| Possession, agreement | 30 Dec 2031 | |
|---|---|---|
| Schedule end | 28 Feb 2031 | |
| RERA completion date | 30 Dec 2031 | |
| Work began, as filed | 15 Jan 2026 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 49.98 m on the fire NOC · 49.98 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 50 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/443/2024 · issued 5 Dec 2024 · building height 49.98 m | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Architect's certificate, registration | Site inspected 2 Mar 2026 | |
Land · ₹6.63 Cr 7.1%Development · ₹86.52 Cr 92.9%
| Estimated cost | ₹93.15 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹76.70 Cr | |
| Cost incurred | ₹11.24 Cr (12.1% of the estimate) | |
| Cost left | ₹81.91 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹15.62 Cr | |
| Land cost revision | Not verified yet | |
Sold (22) 28.2%Unsold (56) 71.8%
| Sold, Q1 2026-27 | 8 / 78 · 70 available | |
|---|---|---|
| Sold, Q2 2026-27 | 22 / 78 · 56 available | |
| Unsold, Q2 2026-27 | 56 | |
| Sold in Q2 2026-27 | 14 |
| Escrow bank | HDFC · Malleshwaram, Bengaluru | |
|---|---|---|
| Designated account, collected | ₹11.65 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹8.15 Cr in Q2 2026-27 (70% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 3 Dec 2025 | |
| Building plan (BBMP) | Sanctioned 4 Apr 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Malleshwaram, Bengaluru | |
| Jhanavi Trishul Alaska | about 3 km | Locked |
|---|
| Platinum Landmark | about 4 km | Locked |
|---|
| Adarsh Premia | about 4.5 km | Locked |
|---|
| Sobha Royal Crest | about 4.5 km | Locked |
|---|
| Iris Courtyard | about 5 km | Locked |
|---|
| Aqua Vista | about 5.5 km | Locked |
|---|
| Samaya Sunshine | about 5.5 km | Locked |
|---|
| about 2 km |
| 30 Jul 2027 |
| 100% (250 of 250) |
| Locked |
| Song Of Wind | about 2.5 km | 28 Feb 2026 | 63% (10 of 16) | Locked |
|---|
| Sattva Forest Ridge | about 3 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
|---|
| Jhanavi Trishul Alaska | about 3 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
|---|
| Projects within 4 km, counted | 31 (31 with an approximate location) | |
|---|---|---|
| Flats in them | 7,062 | |
| Booked | 4,516 of 7,062 (64%) | |
| Unsold | 2,546 | |
| Booked a month, pooled | 97 flats | |
| Months to sell, pooled | 26 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 1 km, Doddakallasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 39 |
| MG Road (CBD) | 11.5 |
| Manyata Tech Park | 19.5 |
| ITPL, Whitefield | 23.5 |
| Ecospace, Bellandur ORR | 15.5 |
| Electronic City Ph 1 | 15 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the north | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Subramanyapura Substation on OpenStreetMap |