Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone IlluminaActive · 54% built | SRIVARI DWELLINGS | Apartment | 793–1,071 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 17 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| CLIMATE CONNECTIONS |
| Plot |
| ~1,500–2,800 sqft (estimate: filed carpet plus 25%) |
| Jul 2025 |
| Amitha Wisdom HomesLapsed · completion date passed | CADABAMS SENIOR DWELLING LLP | Apartment | 464 sqft carpet (as filed) | Dec 2024 |
8 of 151 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aikyam Emerald Grove in the interactive atlas
Transfer of the land
Sale deed
Survey 52
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · REVENUE DEPARTMENT · Survey 52
K-RERA filing, land schedule
Approval or registration
Land use converted
OFFICE OF THE DISTRICT COMMISSIONER · Survey 52
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan KA YO PRA/LAO/29/2017-18/872
K-RERA filing, approvals
Transfer of the land
Title deed executed
Sy 52, Bangalore South taluk
Title deed filed with K-RERA, pp. 1, 19 · See it in Documents
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/051024/007132
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 20 Aug 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | The Karnataka State Cooperative Apex Bank Limited · ₹40.0 L disbursed | |
Page 1
Page 1 of 53 of the encumbrance certificate. Filed with K-RERA: Current Encumbrance Certificate, 53 pages.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 52 | |
|---|---|---|
| Land extent, Sy 52 | 2 acre 6 guntas | |
| Area on the KGIS map | Not verified yet | |
| Khata | A Khatha · REVENUE DEPARTMENT · 24 Jan 2009 | |
| Sale deed | Dated 5 Jun 2008 | |
| Building plan (BMRDA) | Sanctioned 16 Nov 2021 · No. KA YO PRA/LAO/29/2017-18/872 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 17 Apr 2024 |
| Land conversion | Converted 7 Mar 2017 · OFFICE OF THE DISTRICT COMMISSIONER | |
|---|---|---|
| Survey numbers | 52 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
| Harivishram | about 3 km | Locked | |
|---|---|---|---|
| Sattva Springs | about 3.5 km | Locked | |
| Axis Amarissa | about 5 km | Locked | |
| Jhanavi Trishul Alaska | about 9 km | Locked | |
| Mahindra Eden Phase-2 | about 10 km | Locked |
| Aikyam Emerald Grove This project | This project is the point the others are measured from | 17 Apr 2024 | Not filed | Not verified yet |
|---|---|---|---|---|
| Harivishram | about 3 km | 31 Mar 2027 | 100% (152 of 152) | Locked |
| Sattva Springs | about 3.5 km | 18 Sep 2027 | 38% (25 of 66) | Locked |
| Axis Amarissa |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 9.5 km, Mantri Lake view Appartment Next to Talagattapura Lake | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, Suvarnamukhi, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Nelaguli Grama Panchayat) | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km |
|---|
| Possession, agreement | 17 Apr 2024 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 17 Apr 2024 | |
| Work began, as filed | 16 Nov 2021 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Engineer's certificate, registration | Dated 7 Oct 2024 | |
| Chartered accountant's certificate, registration | Dated 7 Oct 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹3.01 Cr 59.2%Development · ₹2.07 Cr 40.8%
| Estimated cost | ₹5.08 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹1.85 Cr | |
| Estimated cost, chartered accountant's certificate | ₹5.08 Cr, same as the filing | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | IDFC FIRST BANK · basaveshwara nagar | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | The Karnataka State Cooperative Apex Bank Limited · ₹40.0 L disbursed | |
|---|---|---|
| Records searched to | 20 Aug 2024 | Review |
| Building plan (BMRDA) | Sanctioned 16 Nov 2021 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | IDFC FIRST BANK · basaveshwara nagar | |
| Sattva Forest Ridge | about 10.5 km | Locked |
|---|
| Good Earth Cadence | about 11 km | Locked |
|---|
| Srivara Vasudha | about 11 km | Locked |
|---|
| Platinum Landmark | about 11 km | Locked |
|---|
| Good Earth Ochre | about 11 km | Locked |
|---|
| about 5 km |
| 31 Dec 2029 |
| 28% (23 of 81) |
| Locked |
| Jhanavi Trishul Alaska | about 9 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
|---|
| Mahindra Eden Phase-2 | about 10 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
|---|
| Sattva Forest Ridge | about 10.5 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
|---|
| Projects within 4 km, counted | 7 (7 with an approximate location) | |
|---|---|---|
| Flats in them | 1,434 | |
| Booked | 586 of 1,434 (41%) | |
| Unsold | 848 | |
| Booked a month, pooled | 13 flats | |
| Months to sell, pooled | 64 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, Suvarnamukhi, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 8.5 km, Silk Institute | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 61 | 51 |
| MG Road (CBD) | 27.5 | 23.5 |
| Manyata Tech Park | 36 | 31.5 |
| ITPL, Whitefield | 45 | 34 |
| Ecospace, Bellandur ORR | 32.5 | 25 |
| Electronic City Ph 1 | 29.5 | 20.5 |
| Sewage treatment plant | None within 3 km |
|---|
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1 km, named Somanahalli Substation on OpenStreetMap |
|---|