Godrej Park Retreat
Part ofGodrej Park Retreat2 phases, 2,102 flats
Overview
Part ofGodrej Park Retreat2 phases, 2,102 flats
Overview
Part ofGodrej Park Retreat2 phases, 2,102 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | 1 | – | 2 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 86 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Godrej Park Retreat in the interactive atlas
Approval or registration
Land use converted
District Commissioner · Survey 77, 175/1, 175/2A, 175/2B, 176/2A
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Sy 77, Kodathi village, Varthur hobli; Sy 175/1, Kodathi village, Varthur hobli; and 4 more items
Title deed filed with K-RERA, pp. 1, 35, 36, 37 · See it in Documents
Transfer of the land
Title deed executed
Sy 77, Kodathi village, Varthur hobli; Sy 175/1, Kodathi village, Varthur hobli; and 4 more items
Title deed filed with K-RERA, pp. 1, 35, 36, 37 · See it in Documents
Transfer of the land
Sale deed
in favour of Godrej Properties Limited · Survey 77, 175/1, 175/2A, 175/2B, 176/2A
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Panchayat · Survey 77, 175/1, 175/2A, 175/2B, 176/2A
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/TPM/DLP-09/2020-21/1499/2021-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/280222/004736
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Positive title opinion given | |
|---|---|---|
| Records searched to | Not verified yet | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 77,175/1,175/2A,175/2B,176/2A, | |
|---|---|---|
| Land extent, Sy 77,175/1,175/2A,175/2B,176/2A, | 12 Acres 34 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 29,424 sq m | |
| Khata | E Khatha · Panchayat · 26 Oct 2021 | |
| Sale deed | Dated 14 Oct 2020 | |
| Sale deed in favour of | Godrej Properties Limited | |
| Building plan (BDA) | Sanctioned 27 Dec 2021 · No. BDA/TPM/DLP-09/2020-21/1499/2021-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/058/2021 · issued 15 Apr 2021 | Clear |
| Environmental clearance | issued 28 Jun 2021 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 2 | |
| RERA completion date | 27 Feb 2027 |
| Land conversion | Converted 22 Oct 2008 · District Commissioner | |
|---|---|---|
| Survey numbers | 77,175/1,175/2A,175/2B,176/2A, |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK type 1 · avg 70 m² 26.8%2BHK type 1 · avg 55 m² 26.2%2BHK type 2 · avg 56 m² 25%1BHK type 1 · avg 35 m² 8.6%19 other types 13.3%
| 1BHK type 1 | 84 | 31,248 |
| 1BHK type 1a | 2 | 743 |
| 1BHK type 2 | 79 | 29,138 |
| 1BHK type 2a | 4 | 1,475 |
| 2BHK type 1 | 256 | 1,51,610 |
| 2BHK type 1 d | 1 | 592 |
| 2BHK type 1a1 | 2 | 1,292 |
| 2BHK type 1a2 | 3 | 1,948 |
| 2BHK type 1a3 | 1 | 646 |
| 2BHK type 1b | 3 | 1,970 |
| 2BHK type 1b1 | 1 | 657 |
| 2BHK type 1c | 5 | 2,960 |
| 2BHK type 2 | 244 | 1,46,389 |
| 2BHK type 2 a | 4 | 2,626 |
| 2BHK type 2 a 1 | 4 | 2,659 |
| 2BHK type 2 a 2 | 1 | 667 |
| Sold, Q2 2026-27 | 976 / 976 | |
|---|---|---|
| Unsold, Q2 2026-27 | 0 |
| Godrej Park Retreat This project | This project is the point the others are measured from | 27 Feb 2027 | 100% (976 of 976) | Not verified yet |
|---|---|---|---|---|
| Mana Jardin Neo | 340 m | 30 Dec 2032 | 27% (22 of 82) | Locked |
| Sobha Royal Pavilion Phase 8 - Wing 15 | 420 m | 30 Jun 2026 | 100% (113 of 113) | Locked |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 1.4 km, Doddakannelli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 1.4 km to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 190 m to the west, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 48% | |
| Electricity, built | 100% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 25% | |
| Parks, built | 100% | |
| Water and Sanitation, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.04 (1,017 covered spaces for 976 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 100% · planned by 1 Apr 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 28 Aug 2026 | |
| Internal roads | Not verified yet | |
| Club house | 48% | |
| Completion | 99% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 12 Oct 2026 | |
| RERA completion date | 27 Feb 2027 | |
| Work began, as filed | 28 Feb 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: Tower A 83.4 m, TOWER B 83.4 m, TOWER C 83.4 m, TOWER D 83.4 m, TOWER E 83.4 m, TOWER F 74.2 m, TOWER G 74.2 m, TOWER H 65.35 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 177.55 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/058/2021 · issued 15 Apr 2021 | |
| Environmental clearance | issued 28 Jun 2021 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 3 Jan 2022 | |
| Engineer's certificate, registration | Dated 3 Jan 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹85.89 Cr 19%Development · ₹366.98 Cr 81%
| Estimated cost | ₹452.87 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹366.98 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (976) 100%
| Sold, Q3 2025-26 | 976 / 976 · 0 available | |
|---|---|---|
| Sold, Q4 2025-26 | 976 / 976 · 0 available | |
| Sold, Q1 2026-27 | 976 / 976 · 0 available | |
| Sold, Q2 2026-27 | 976 / 976 · 0 available | |
| Unsold, Q2 2026-27 | 0 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | Axis Bank · Bangalore Main branch | |
|---|---|---|
| Designated account, collected | ₹21.1 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹6.02 Cr in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 2 | |
| K-RERA registrations under this promoter | 25 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 2 | |
| Complaints filed against the promoter | 65 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 27 Dec 2021 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Bangalore Main branch | |

| 2BHK type 2 a 3 |
| 1 |
| 657 |
| 2BHK type 2 a 4 | 5 | 2,992 |
| 2BHK type 2 a 5 | 2 | 1,195 |
| 2BHK type 3 | 4 | 2,713 |
| 3BHK type 1 | 262 | 1,98,734 |
| 3BHK type 1 a | 4 | 3,025 |
| 3BHK type 1 b | 4 | 3,025 |
Map of 9 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Mana Jardin Neo, price locked; Sobha Royal Pavilion Phase 8 - Wing 15, price locked; Sobha Royal Pavilion Phase 6 - Wing 10 And 11, price locked; Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14, price locked; 63 Degree East - Tower E, price locked; Birla Evara, price locked; Satori Residence By Genurise, price locked; Adarsh Rosewood, price locked; Assetz Ren & Rei, price locked.
| 420 m |
| Locked |
| 63 Degree East - Tower E | 730 m | Locked |
|---|
| Orion Heights | about 1.5 km | Locked |
|---|
| Birla Evara | 1.6 km | Locked |
|---|
| Satori Residence By Genurise | 1.8 km | Locked |
|---|
| Haven Phase 2 | about 2 km | Locked |
|---|
| Adarsh Rosewood | 2.7 km | Locked |
|---|
| Assetz Muse & Maison | about 3 km | Locked |
|---|
| Assetz Ren & Rei | 3.2 km | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | 420 m | 30 Jun 2026 | 100% (151 of 151) | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | 420 m | 30 Jun 2026 | 100% (227 of 227) | Locked |
|---|
| 63 Degree East - Tower E | 730 m | 31 Dec 2026 | 100% (399 of 399) | Locked |
|---|
| Orion Heights | about 1.5 km | 31 Dec 2025 | 65% (106 of 163) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹95,500 /mo · 8 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹62,000 /mo · 76 listings | |
| Rent, 2BHK, 3 km | ₹40,000 /mo · 122 listings | |
| Rent, 1BHK, 3 km | ₹18,000 /mo · 35 listings | |
| Rent per sq ft, 3 km | ₹38.3 /mo, as listed · 128 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 79 (35 with an approximate location) | |
|---|---|---|
| Flats in them | 22,686 | |
| Booked | 12,141 of 22,686 (54%) | |
| Unsold | 10,545 | |
| Booked a month, pooled | 324 flats | |
| Months to sell, pooled | 31 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Panchayat), Other | |
| Nearest city water main | 930 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 1.4 km to the north, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 4.6 km, Bellandur | |
| Kempegowda Airport | 49.6 | 51 | 33.9 |
| MG Road (CBD) | 17.7 | 26 | 14.5 |
| Manyata Tech Park | 25.1 | 34 | 19.2 |
| ITPL, Whitefield | 16.3 | 19 | 10.8 |
| Ecospace, Bellandur ORR | 8.0 | 13 | 4.5 |
| Electronic City Ph 1 | 12.8 | 20 | 6.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.9 km to the north-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 860 m to the east |