Overview
Sobha Royal Pavilion Phase 8 - Wing 15
Part ofSobha Royal Pavilion8 phases, 1,284 flats
Overview
Part ofSobha Royal Pavilion8 phases, 1,284 flats
Overview
Part ofSobha Royal Pavilion8 phases, 1,284 flats
Overview
Part ofSobha Royal Pavilion8 phases, 1,284 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 3 sections
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 40 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sobha Royal Pavilion Phase 8 - Wing 15 in the interactive atlas
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BDA) | Not verified yet | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/1157/2018 · building height 57.6 m | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order W-343124 · issued 24 Apr 2024 · valid until 30 Jun 2028 | Clear |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2026 |
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
| Forfeiture, agreement | The booking amount | |
|---|---|---|
| Forfeiture, allotment letter | Not verified yet | |
| Transfer fee | Not verified yet | |
|---|---|---|
| Holding charge | Not verified yet | |
| Maintenance included | Not verified yet | |
| Defect liability | 5 years | |
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 1.1 km, Doddakannelli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 1.0 km to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 400 m to the south, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Electricity, built | 100% | |
|---|---|---|
| Outdoor Sports facility, built | 100% | |
| Swimming Pool, built | 100% | |
| Power Backup, built | 100% | |
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Not verified yet | |
As the promoter reported it

| Main structure | 100% · planned by 30 Nov 2023 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 30 Sep 2025 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | 107.3% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Sep 2025 | |
| RERA completion date | 30 Jun 2026 | |
| Work began, as filed | 24 Oct 2018 | |
| Structure | RCC structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 57.6 m on the fire NOC | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Aluminium windows | |
|---|---|---|
| Flooring | Ceramic tiles | |
| Toilet tiles | Ceramic tiles (walls, up to ceiling) | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | 100% power backup for common areas | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jun 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/1157/2018 · building height 57.6 m | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jun 2026 (3 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹68.21 Cr 36.3%Development · ₹119.60 Cr 63.7%
| Estimated cost | ₹187.81 Cr | |
|---|---|---|
| Cost incurred | ₹201.54 Cr (107.3% of the estimate) | |
| Cost left | ₹-13.73 Cr (spent more than the estimate) | |
| Collected from buyers | ₹203.99 Cr | |
| Receivable, sold flats | ₹1.33 Cr | |
| Land cost revision | Not verified yet | |
Sold (113) 100%
| Sold, Q3 2025-26 | 113 / 113 · 0 available | |
|---|---|---|
| Sold, Q4 2025-26 | 113 / 113 · 0 available | |
| Sold, Q1 2026-27 | 113 / 113 · 0 available | |
| Unsold, Q1 2026-27 | 0 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 |
| Escrow bank | RATNAKAR BANK | |
|---|---|---|
| Designated account, collected | ₹1.08 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹1.11 Cr in Q1 2026-27 | |
| Escrow account, Q1 2026-27 | ₹1.11 Cr withdrawn | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 118 | |
|---|---|---|
| Marked completed | 61 | |
| Past promised date, not completed | 7 | |
| Revoked or withdrawn | 7 | |
| Complaints filed against the promoter | 226 | |
| Other phases under this promoter name | 114 | |
| With a filed extension or completion | 64 (57 completed, 7 extended) | |
| Average schedule slip | 12 months |
| Developer's project loan |
|---|
| Not verified yet |
| Records searched to | Not verified yet | |
|---|---|---|
| Building plan | Not verified yet | |
|---|---|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| Sale deed in favour of | Not verified yet | |
|---|---|---|
| Escrow bank | RATNAKAR BANK |
|---|

Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 680 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 1.0 km to the north, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 4.2 km, Bellandur | |
| Kempegowda Airport | 33.6 |
| MG Road (CBD) | 14.1 |
| Manyata Tech Park | 18.8 |
| ITPL, Whitefield | 10.5 |
| Ecospace, Bellandur ORR | 4.1 |
| Electronic City Ph 1 | 7.0 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.5 km to the north-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the east |