Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
| Aeropolis, A Project Of Sattva GroupLapsed · completion date passed | TRINAYANI REALTOR PRIVATE LIMITED |
Title & ownership
Approvals
Disputes & cases
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 17 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Valuation |
|---|
| – |
| – |
| – |
| Not verified |
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | 1 | – | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Apartment |
| 280–635 sqft carpet (as filed) |
| Jul 2026 |
| Aira HillsApplied for completion 17/02/2026 | Vaarahi Developers Pvt Ltd | Plot | – | Dec 2024 |
| Ajmal Flora Valley Phase -IIApplied for completion 01/10/2024 | M/s. Ajmal Flora Valley | Plot | ~2,140 sqft (estimate: filed carpet plus 25%) | May 2017 |
8 of 252 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Gateway Residency in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (BIAPPA) | Sanctioned 6 Aug 2019 · No. 91/2013-14 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 10 Jun 2025 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 114/1 | Converted 4 Dec 2012 · Deputy Commissioner, Bangalore Rural | |
| Sy 114/2, 114/3, 114/4 | Converted 31 Jan 2013 · DEPUTY COMMISSIONER, BANGALORE RURAL | |
| Sy 114/5 | Converted 16 Feb 2013 · DEPUTY COMMISSIONER, BANGALORE RURAL | |
| Survey numbers | 114/1 · 114/2 · 114/3 · 114/4 · 114/5 |
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Sattva City | 5.3 km | Locked | |
|---|---|---|---|
| Sattva Vasanta Skye | 5.5 km | Locked | |
| Godrej MSR City | 5.6 km | Locked | |
| Sattva Vasanta Cove | 5.8 km | Locked | |
| Barca II At Godrej Msr City | about 6 km | Locked |
| Gateway Residency This project | This project is the point the others are measured from | 10 Jun 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sattva City | 5.3 km | 28 Feb 2032 | 17% (425 of 2,491) | Locked |
| Sattva Vasanta Skye | 5.5 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
| Godrej MSR City |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture, at the filed pin | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 12.3 km, Kondappa layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 2.3 km to the south-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 100 m to the north-west, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Kitchen handover | Not verified yet | |
|---|---|---|
| Sewage plant | Sewage treatment plant | |
| Power backup | Not verified yet | |
| Possession, agreement | Jun 2025 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 10 Jun 2025 | Review |
| Work began, as filed | 6 Sep 2022 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not verified yet | |
| Sewage plant | Sewage treatment plant | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Engineer's certificate, registration | Dated 3 Jun 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹6.00 Cr 70.6%Development · ₹2.50 Cr 29.4%
| Estimated cost | ₹8.50 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹2.00 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Union Bank of India · Wilson Garden Branch | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BIAPPA) | Sanctioned 6 Aug 2019 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Union Bank of India · Wilson Garden Branch | |
| Ekta Elements | 6.9 km | Locked |
|---|
| Riviera Glade | about 7 km | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 7 km | Locked |
|---|
| Birla Trimaya Phase-3 | 7.1 km | Locked |
|---|
| Varnam Phase 1c | about 7 km | Locked |
|---|
| Birla Trimaya Phase-2 | about 7.5 km | Locked |
|---|
| Birla Trimaya | about 7.5 km | Locked |
|---|
| 5.6 km |
| 31 Mar 2030 |
| 100% (1,957 of 1,961) |
| Locked |
| Sattva Vasanta Cove | 5.8 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
|---|
| Barca II At Godrej Msr City | about 6 km | 31 Dec 2030 | 99% (593 of 602) | Locked |
|---|
| Ekta Elements | 6.9 km | 31 Dec 2027 | Not filed | Locked |
|---|
| Projects within 4 km, counted | 8 (4 with an approximate location) | |
|---|---|---|
| Flats in them | 4,833 | |
| Booked | 4,003 of 4,833 (83%) | |
| Unsold | 830 | |
| Booked a month, pooled | 157 flats | |
| Months to sell, pooled | 5 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 19.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Jallige Gram Panchyat) | |
| Nearest city water main | 8.7 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 2.3 km to the south-west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 5.2 km, Doddajala | |
| Kempegowda Airport | 10.9 |
| MG Road (CBD) | 27.2 |
| Manyata Tech Park | 19.5 |
| ITPL, Whitefield | 29.5 |
| Ecospace, Bellandur ORR | 33.6 |
| Electronic City Ph 1 | 43.0 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 2.9 km to the south-west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |