Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone Illumina |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 59 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | 1 | 1 | Review |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| SRIVARI DWELLINGS |
| Apartment |
| 793–1,071 sqft carpet (as filed) |
| Dec 2028 |
| Amidst NatureExtended to 20-07-2027 | CLIMATE CONNECTIONS | Plot | ~1,500–2,800 sqft (estimate: filed carpet plus 25%) | Jul 2025 |
8 of 151 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open B V Maple in the interactive atlas
Approval or registration
Land use converted
Deputy Commisioner · Survey 87/3
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. JAY-1-03027-2014-15 · Book 1 · Sy 87/3
Title deed filed with K-RERA, pp. 7, 11 · See it in Documents
Transfer of the land
Sale deed
Survey 87/3
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan 228/15-16
K-RERA filing, approvals
Approval or registration
Khata issued
A Khatha · BBMP · Survey 87/3
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/040524/006853
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 16 Jan 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 6 of the survey sketch. Filed with K-RERA: sketch, conversion sketch, atlas, 6 pages, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 87/3 | |
|---|---|---|
| Land extent, Sy 87/3 | 37 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 3,743 sq m | |
| Khata | A Khatha · BBMP · 9 Sep 2022 | |
| Sale deed | Dated 28 Jul 2014 | |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 29 Nov 2016 · No. 228/15-16 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | GBC(1)271/2015 · building height 18.45 m | Clear |
| Environmental clearance | Not verified yet | |
| Airport height NOC | NOC ID BANG/SOUTH/B/081015/154948 | |
| Pollution board (CFE) | consent order CTE-121747 · issued 17 Dec 2022 · valid until 6 Dec 2027 | Clear |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | Converted 3 Jan 2014 · Deputy Commisioner | |
|---|---|---|
| Survey numbers | 87/3 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 88 m² 60.3%2BHK · avg 73 m² 39.7%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 27 | 791 |
| 3BHK | 41 | 947 |
| Sold, Q2 2026-27 | 28 / 68 | |
|---|---|---|
| Unsold, Q2 2026-27 | 40 | |
| Months to sell, derived from filed bookings | 20 months |
| Srivara Vasudha | about 0.5 km | Locked | |
|---|---|---|---|
| Jhanavi Trishul Alaska | about 1.5 km | Locked | |
| Sattva Forest Ridge | about 2 km | Locked | |
| Platinum Landmark | about 3 km | Locked | |
| Garden Square | about 3.5 km |
| B V Maple This project | This project is the point the others are measured from | 31 Dec 2026 | 41% (28 of 68) | Not verified yet |
|---|---|---|---|---|
| Srivara Vasudha | about 0.5 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
| Jhanavi Trishul Alaska | about 1.5 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Raghuvanahalli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 10% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.10 (75 covered spaces for 68 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | 95% · planned by 6 Apr 2023 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 1 Feb 2024 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 94% | |
| Completion, accountant | Not verified yet | |
Builder's schedule runs about 20 months past the promised possession date.
| Possession, agreement | 28 Apr 2025 | |
|---|---|---|
| Schedule end | 31 Dec 2026 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 1 Aug 2022 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 18.45 m on the fire NOC · 18.45 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 48 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Mar 2026, May 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | GBC(1)271/2015 · building height 18.45 m | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Mar 2026, May 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 1 Feb 2024 | |
| Chartered accountant, Form 4 | Dated 8 Oct 2026 | |
Land · ₹17.22 Cr 34.9%Development · ₹32.19 Cr 65.1%
| Estimated cost | ₹49.41 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹28.40 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹6.44 Cr | |
| Land cost revision | Not verified yet | |
Sold (28) 41.2%Unsold (40) 58.8%
| Sold, Q3 2025-26 | 10 / 68 · 58 available | |
|---|---|---|
| Sold, Q4 2025-26 | 18 / 68 · 50 available | |
| Sold, Q1 2026-27 | 25 / 68 · 43 available | |
| Sold, Q2 2026-27 | 28 / 68 · 40 available | |
| Unsold, Q2 2026-27 | 40 | |
| Sold in Q4 2025-26 | 8 | |
| Sold in Q1 2026-27 | 7 | |
| Sold in Q2 2026-27 | 3 |
| Escrow bank | Karnataka Bank Ltd. · Banashankari 2nd stage | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹6.01 Cr in Q2 2026-27 | |
| Escrow account to date, Q1 2026-27 | ₹19.15 Cr deposited from sales, ₹16.85 Cr withdrawn | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 16 Jan 2024 | Review |
| Building plan (BBMP) | Sanctioned 29 Nov 2016 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Karnataka Bank Ltd. · Banashankari 2nd stage | |

| Song Of Wind | about 4 km | Locked |
|---|
| Iris Courtyard | about 5 km | Locked |
|---|
| Aqua Vista | about 5 km | Locked |
|---|
| Axis Amarissa | about 5.5 km | Locked |
|---|
| Adarsh Premia | about 6 km | Locked |
|---|
| Sobha Royal Crest | about 6 km | Locked |
|---|
| Samaya Sunshine | about 6 km | Locked |
|---|
| about 2 km |
| 31 Dec 2029 |
| 75% (304 of 407) |
| Locked |
| Platinum Landmark | about 3 km | 30 Dec 2027 | 17% (18 of 103) | Locked |
|---|
| Garden Square | about 3.5 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
|---|
| Song Of Wind | about 4 km | 28 Feb 2026 | 63% (10 of 16) | Locked |
|---|
| Projects within 4 km, counted | 28 (28 with an approximate location) | |
|---|---|---|
| Flats in them | 6,113 | |
| Booked | 3,800 of 6,113 (62%) | |
| Unsold | 2,313 | |
| Booked a month, pooled | 97 flats | |
| Months to sell, pooled | 24 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 0.5 km, Talaghattapura | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 40.5 |
| MG Road (CBD) | 13.5 |
| Manyata Tech Park | 21 |
| ITPL, Whitefield | 24.5 |
| Ecospace, Bellandur ORR | 16 |
| Electronic City Ph 1 | 15 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 2.5 km to the south-east, named Anjanapura Quarries on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |