| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone Illumina |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 55 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| SRIVARI DWELLINGS |
| Apartment |
| 793–1,071 sqft carpet (as filed) |
| Dec 2028 |
| Amidst NatureExtended to 20-07-2027 | CLIMATE CONNECTIONS | Plot | ~1,500–2,800 sqft (estimate: filed carpet plus 25%) | Jul 2025 |
8 of 151 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Avalon in the interactive atlas
Approval or registration
Land use converted
Bengaluru District · Survey 1/2, 1/3
K-RERA filing, land schedule
Approval or registration
Land use converted
Bengaluru District · Survey 1/2, 1/3
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. JPN-1-05398-2008-09 · Book 1 · executed 7 Jan 2009 · Consideration ₹43.6 L · Sy 1/2; 1, Uttarahalli hobli, Bangalore South taluk
Title deed filed with K-RERA, pp. 1, 8, 11, 22 · See it in Documents
Transfer of the land
Title deed registered
No. JPN-1-05398-2008-09 · Book 1 · executed 7 Jan 2009 · Consideration ₹43.6 L · Sy 1/2; 1, Uttarahalli hobli, Bangalore South taluk
Title deed filed with K-RERA, pp. 1, 8, 11, 22 · See it in Documents
Transfer of the land
Sale deed
Survey 1/2, 1/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 1/2, 1/3
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 1/3
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 1/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan PRJ/15563/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/150225/007510
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 2 Jan 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | Karnataka Bank Limited · ₹5.00 Cr disbursed | |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: ADLR Survey sketch, 1 page, not in English.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 1/2, 1/3 | |
|---|---|---|
| Land extent, Sy 1/2 | 05 Guntas | |
| Land extent, Sy 1/3 | 08 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,315 sq m | |
| Khata | E Khatha · BBMP · 12 Feb 2024; A Khatha · BBMP · 12 Feb 2024 | |
| Sale deed | Dated 7 Jan 2009 | |
| Building plan (Local Planning Authority) | Sanctioned 22 Jul 2024 · No. PRJ/15563/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Not verified yet | |
| Water and sewerage NOC (BWSSB) | issued 31 May 2024 | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Sep 2028 |
| Land conversion | Converted 19 Jun 2004 · Bengaluru District | |
|---|---|---|
| Survey numbers | 1/2 · 1/3 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 87 m² 65.5%2BHK 34.5%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 10 | 8,396 |
| 3BHK | 19 | 17,847 |
| Sold, Q2 2026-27 | 20 / 29 | |
|---|---|---|
| Unsold, Q2 2026-27 | 9 | |
| Months to sell, derived from filed bookings | 7 months |
| Sattva Forest Ridge | 1.3 km | Locked | |
|---|---|---|---|
| Srivara Vasudha | about 1.5 km | Locked | |
| Platinum Landmark | about 2.5 km | Locked | |
| Jhanavi Trishul Alaska | 3.1 km | Locked |
| Avalon This project | This project is the point the others are measured from | 30 Sep 2028 | 69% (20 of 29) | Not verified yet |
|---|---|---|---|---|
| Sattva Forest Ridge | 1.3 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
| Srivara Vasudha | about 1.5 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
| Platinum Landmark |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 1.6 km, Raghuvanahalli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 110 m to the south-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 370 m to the south, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance | |
|---|---|---|
| Electricity, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (29 covered spaces for 29 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 20 Jun 2026 | |
|---|---|---|
| Electrical and plumbing finishing | 20% · planned by 30 Jun 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 89% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Sep 2028 | |
|---|---|---|
| Schedule end | 30 Jun 2027 | |
| RERA completion date | 30 Sep 2028 | |
| Grace period for possession | 6 months | |
| Work began, as filed | 1 Feb 2025 |
| Structure | RCC framed structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 7 Feb 2025 · site inspected 3 Feb 2025 | |
| Engineer's certificate, registration | Dated 7 Feb 2025 | |
| Chartered accountant's certificate, registration | Dated 24 Jan 2025 | |
| Chartered accountant, Form 4 | Dated 15 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹3.74 Cr 20.5%Development · ₹14.51 Cr 79.5%
| Estimated cost | ₹18.25 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹10.40 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | ₹7.58 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹6.61 Cr | |
| Land cost revision | Not verified yet | |
Sold (20) 69%Unsold (9) 31%
| Sold, Q3 2025-26 | 9 / 29 · 20 available | |
|---|---|---|
| Sold, Q4 2025-26 | 11 / 29 · 18 available | |
| Sold, Q1 2026-27 | 17 / 29 · 12 available | |
| Sold, Q2 2026-27 | 20 / 29 · 9 available | |
| Unsold, Q2 2026-27 | 9 | |
| Sold in Q4 2025-26 | 2 | |
| Sold in Q1 2026-27 | 6 | |
| Sold in Q2 2026-27 | 3 | |
| Flats booked, Form 4 Q1 2026-27 | 17 |
| Escrow bank | Karnataka Bank Ltd. · Bengaluru – Minerva circle | |
|---|---|---|
| Designated account, collected | ₹2.92 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹2.15 Cr in Q2 2026-27 (74% of that quarter's deposits) | |
| Amount deposited in the quarter, Form 4 | ₹2,03,79,200 | |
| Net amount withdrawable, Form 4 | ₹5,45,49,020 | |
| Escrow account, Q1 2026-27 | Opened at ₹1.49 Cr, ₹1.97 Cr deposited from sales, ₹1.73 Cr withdrawn | |
| Escrow account to date, Q1 2026-27 | ₹6.50 Cr deposited from sales, ₹4.76 Cr withdrawn | |
| Withdrawn from the escrow account to date | ₹5,21,40,000 | |
| Share of collections deposited in escrow | 72.38% | |
| Sale proceeds realised, Q1 2026-27 | ₹2,81,55,374 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Karnataka Bank Limited · ₹5.00 Cr disbursed | |
|---|---|---|
| Records searched to | 2 Jan 2025 | |
| Building plan | Sanctioned 22 Jul 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Karnataka Bank Ltd. · Bengaluru – Minerva circle | |

Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sattva Forest Ridge, price locked; Jhanavi Trishul Alaska, price locked; Garden Square, price locked.
| Garden Square | 3.3 km | Locked |
|---|
| Iris Courtyard | about 3.5 km | Locked |
|---|
| Song Of Wind | about 3.5 km | Locked |
|---|
| Aqua Vista | about 4 km | Locked |
|---|
| Lodha Azur | 5.0 km | Locked |
|---|
| Adarsh Premia | 5.1 km | Locked |
|---|
| Azur Tower D | 5.6 km | Locked |
|---|
| Sobha Royal Crest | about 6 km | Locked |
|---|
| about 2.5 km |
| 30 Dec 2027 |
| 17% (18 of 103) |
| Locked |
| Jhanavi Trishul Alaska | 3.1 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
|---|
| Garden Square | 3.3 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
|---|
| Iris Courtyard | about 3.5 km | 30 Jun 2026 | 30% (12 of 40) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹43,000 /mo · 35 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹26,000 /mo · 51 listings | |
| Rent, 1BHK, 3 km | ₹10,250 /mo · 16 listings | |
| Rent per sq ft, 3 km | ₹28.0 /mo, as listed · 76 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 37 (21 with an approximate location) | |
|---|---|---|
| Flats in them | 7,412 | |
| Booked | 4,437 of 7,412 (60%) | |
| Unsold | 2,975 | |
| Booked a month, pooled | 136 flats | |
| Months to sell, pooled | 22 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 180 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 110 m to the south-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 1.2 km, Doddakallasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 39.5 |
| MG Road (CBD) | 12.2 |
| Manyata Tech Park | 20.2 |
| ITPL, Whitefield | 23.1 |
| Ecospace, Bellandur ORR | 14.5 |
| Electronic City Ph 1 | 13.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 3.0 km to the north-east, named Sarakki 5MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | 1.9 km to the south, named Anjanapura Quarries on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 880 m to the east, named Khodays Glass Factory Substation on OpenStreetMap |