Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone Illumina |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 83 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| SRIVARI DWELLINGS |
| Apartment |
| 793–1,071 sqft carpet (as filed) |
| Dec 2028 |
| Amidst NatureExtended to 20-07-2027 | CLIMATE CONNECTIONS | Plot | ~1,500–2,800 sqft (estimate: filed carpet plus 25%) | Jul 2025 |
8 of 151 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vanshika's Nature's Harmony in the interactive atlas
Approval or registration
Land use converted
DC Office, Bangalore · Survey 9/1
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. BTM-1-02631-2023-24 · Book 1 · executed 27 Jun 2023 · Consideration ₹20.07 Cr · Sy 9/1, Uttarahalli Manavathekaval village, Uttarahalli hobli, Bangalore South taluk
Title deed filed with K-RERA, pp. 2, 5, 8, 21 · See it in Documents
Transfer of the land
Sale deed
in favour of M/s. VANSHIKA LIFE SPACES PVT LTD · Survey 9/1
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of VANSHIKA LIFE SPACES PRIVATE LIMITED · Survey 9/1
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 9/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDSOUTH/0068/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/121124/007226
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 10 Sep 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 2 of the survey sketch. Filed with K-RERA: ADLR Survey Sketch, 2 pages, not in English.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 1,12,508 sq m | |
| Land area filed with K-RERA | 17,097 sq m | |
| Village, hobli and taluk on the KGIS map | Uttarahalli Manavarthekaval, Uttarahalli-2 hobli, Bangalore-South taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 9/1 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 17,097 sq m | |
| Khata | A Khatha · BBMP · 27 Oct 2023 | |
| Sale deed | Dated 28 Jun 2023 | |
| Sale deed in favour of | M/s. VANSHIKA LIFE SPACES PVT LTD, VANSHIKA LIFE SPACES PRIVATE LIMITED | |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 9/1 | 26 | 28 acres 38 guntas | Yes | Not read yet |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 12 Sep 2024 · No. BBMP/Addl.Dir/JDSOUTH/0068/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/054/2024 · issued 12 Jun 2024 · building height 31.65 m (Tower A), 34.65 m (Tower B, Tower C, Tower D, Tower E, Tower F) | Clear |
| Environmental clearance | SEIAA 153 CON 2023 · EC identification no. EC23B038KA147551 · issued 18 Dec 2023 | Clear |
| Airport height NOC | valid until 9 Aug 2031 | Clear |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 13 Nov 2023 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 8 Dec 2008 · DC Office, Bangalore | |
|---|---|---|
| Survey numbers | 9/1 · 9/1 · 9/1 · 9/1 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 101 m² 39.7%Lux-3BHK · avg 113 m² 18.2%3BHK+study · avg 116 m² 18.2%Com-3BHK · avg 89 m² 17.6%2 other types 6.3%
| 3BHK | 133 | 1,088 |
| 3BHK+study | 61 | 1,251 |
| 4BHK | 11 | 1,344 |
| Com-3BHK | 59 | 959 |
| Lux-3BHK | 61 | 1,221 |
| Pent house | 10 | 1,879 |
| Sold, Q2 2026-27 | 151 / 335 | |
|---|---|---|
| Unsold, Q2 2026-27 | 184 | |
| Months to sell, derived from filed bookings | 29 months |
| Jhanavi Trishul Alaska | about 1 km | Locked | |
|---|---|---|---|
| Mahindra Eden Phase-2 | about 2.5 km | Locked | |
| Srivara Vasudha | about 3 km | Locked | |
| Axis Amarissa | about 3.5 km | Locked | |
| Sattva Forest Ridge | about 4 km |
| Vanshika's Nature's Harmony This project | This project is the point the others are measured from | 31 Dec 2028 | 45% (151 of 335) | Not verified yet |
|---|---|---|---|---|
| Jhanavi Trishul Alaska | about 1 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
| Mahindra Eden Phase-2 | about 2.5 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1.5 km, Mantri Lake view Appartment Next to Talagattapura Lake | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km, Thalagattapura Lake | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Piped Gas, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.10 (370 covered spaces for 335 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
As the promoter reported itPossession date in the agreement

| Main structure | 19% · planned by 31 Dec 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Dec 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 36% | |
| Completion, accountant | 50.5% of the estimated cost spent | |
| Possession, agreement | 31 Dec 2028 | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 1 Nov 2024 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 31.65 m (Tower A), 34.65 m (Tower B, Tower C, Tower D, Tower E, Tower F) on the fire NOC · filed: Tower A 31.65 m, Tower B 34.65 m, Tower C 34.65 m, Tower D 34.65 m, Tower E 34.65 m, Tower F 34.65 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 145 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/054/2024 · issued 12 Jun 2024 · building height 31.65 m (Tower A), 34.65 m (Tower B, Tower C, Tower D, Tower E, Tower F) | |
| Environmental clearance | SEIAA 153 CON 2023 · EC identification no. EC23B038KA147551 · issued 18 Dec 2023 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Site inspected 1 Apr 2024 | |
| Engineer's certificate, registration | Dated 17 Sep 2024 | |
| Chartered accountant's certificate, registration | Dated 11 Sep 2024 | |
| Chartered accountant, Form 4 | Dated 13 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹34.28 Cr 18.1%Development · ₹155.35 Cr 81.9%
| Estimated cost | ₹189.64 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹149.62 Cr | |
| Cost incurred | ₹95.82 Cr (50.5% of the estimate) | |
| Cost left | ₹93.81 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹123.49 Cr | |
| Land cost revision | Not verified yet | |
Sold (151) 45.1%Unsold (184) 54.9%
| Sold, Q3 2025-26 | 94 / 335 · 241 available | |
|---|---|---|
| Sold, Q4 2025-26 | 114 / 335 · 221 available | |
| Sold, Q1 2026-27 | 142 / 335 · 193 available | |
| Sold, Q2 2026-27 | 151 / 335 · 184 available | |
| Unsold, Q2 2026-27 | 184 | |
| Sold in Q4 2025-26 | 20 | |
| Sold in Q1 2026-27 | 28 | |
| Sold in Q2 2026-27 | 9 |
| Escrow bank | Bank of Baroda · Konanakunte Branch | |
|---|---|---|
| Designated account, collected | ₹21.82 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹15.27 Cr in Q2 2026-27 (70% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹47,40,95,406 | |
| Net amount withdrawable, Form 4 | ₹1,21,31,553 | |
| Withdrawn from the escrow account to date | ₹46,19,63,852 | |
| Share of collections deposited in escrow | 70% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 10 Sep 2024 | |
| Building plan (BBMP) | Sanctioned 12 Sep 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Bank of Baroda · Konanakunte Branch | |

| Sattva Springs | about 5 km | Locked |
|---|
| Garden Square | about 5 km | Locked |
|---|
| Platinum Landmark | about 5 km | Locked |
|---|
| Harivishram | about 5.5 km | Locked |
|---|
| Samaya Sunshine | about 5.5 km | Locked |
|---|
| Song Of Wind | about 6 km | Locked |
|---|
| Good Earth Ochre | about 7 km | Locked |
|---|
| Srivara Vasudha |
|---|
| about 3 km |
| 30 Nov 2026 |
| 100% (95 of 95) |
| Locked |
| Axis Amarissa | about 3.5 km | 31 Dec 2029 | 28% (23 of 81) | Locked |
|---|
| Sattva Forest Ridge | about 4 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
|---|
| Sattva Springs | about 5 km | 18 Sep 2027 | 38% (25 of 66) | Locked |
|---|
| Projects within 4 km, counted | 17 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 4,259 | |
| Booked | 2,674 of 4,259 (63%) | |
| Unsold | 1,585 | |
| Booked a month, pooled | 51 flats | |
| Months to sell, pooled | 31 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 1 km, Silk Institute | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 51.5 | 42.5 |
| MG Road (CBD) | 18.5 | 15.5 |
| Manyata Tech Park | 27 | 23 |
| ITPL, Whitefield | 35.5 | 27 |
| Ecospace, Bellandur ORR | 23 | 18.5 |
| Electronic City Ph 1 | 21 | 17 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1.5 km, named Tataguni on OpenStreetMap |
|---|