Are there court cases or buyer complaints on this project?
Locked
Cases on the landNot checked
Cases on the builder1 case
RERA complaintsNo cases
Builder's other projectsNo cases
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Recent price, super built-upNot verified yet
Recent price, carpetNot verified yet
Phase 1 → Phase 2Not verified yet
Gross yield, per sq ftNot verified yet
This project
Price
Price per sq ft, super built-up
Location & risks
What is the location like?
Height above nearest drainNot verified yet
Groundwater, taluk average19.3 m below groundDevanahalli taluk, July 2023
Water supply, as filedSelf developmentDeclared by the promoter
Metro, under constructionabout 3.5 kmKIA Terminal, under construction
The site
Zoning & hazards
Construction & progress
How is it being built, and when will it be ready?
CompletionRegistered
Possession, agreementAug 2022Agreement for sale, p. 10
StructureNot verified yet
Structural safety certificateNot verified yet
Progress
Completion, architect
Registered
Work left
By component
Registered
Quarterly return
Developer
Can the developer deliver?
Receivable, sold flatsNot verified yet
Cost leftNot verified yet
SoldRegistered
Sold in the latest quarterRegistered
Funding
Estimated cost
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNot verified yet
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed173On K-RERA
Available14383% of filed
K-RERA only30
Approvals with a validity dateNone read
Approvals & NOCs
6 pagesAvailable
8 pagesAvailable
2 pagesAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
5 pagesAvailable
2 pagesAvailable
K-RERA only
K-RERA only
K-RERA only
1 pageAvailable
1 pageAvailable
K-RERA only
K-RERA only
K-RERA only
K-RERA only
1 pageAvailable
K-RERA only
K-RERA only
K-RERA only
Source: K-RERA project page and the documents filed there, as read by us. 3 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Contract & costs and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 5 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 5 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Total Green Homes in the interactive atlas
Charges
Not verified yet
Boundaries
Schedule in the EC vs KGIS neighbours
The matched land is part of a survey number. KGIS holds only the whole number, so its neighbours are not this land's.
Encumbrance certificate filed with K-RERA
Page 1
Page 1 of 5 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 5 pages, not in English.
No survey sketch is listed on this phase's K-RERA filing
Sketch, sanction and mutation vs KGIS map
Filed survey numbers matched to the KGIS map
5 of 5
Whole survey numbers on the KGIS map
33,415 sq m
Land area filed with K-RERA
25,950 sq m
Village, hobli and taluk on the KGIS map
Bychapura, Kasaba hobli, Devanahalli taluk
Sketch dimensions
Not verified yet
Sanctioned plan area
Not verified yet
Mutation entry
Not verified yet
Land record
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 5 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 5 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765 and 400 kV
Its corridor, to scale
Buried cable
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
Water at a glance
Groundwater
Devanahalli taluk average, July 2023: 19.3 m below ground
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot