Overview
The Valley by Essem18 Phase 1
Part ofThe Valley by Essem182 phases
Overview
Part ofThe Valley by Essem182 phases
Overview
Part ofThe Valley by Essem182 phases

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone Illumina |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: Essem18 Developers Private Limited
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 57 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| SRIVARI DWELLINGS |
| Apartment |
| 793–1,071 sqft carpet (as filed) |
| Dec 2028 |
| Amidst NatureExtended to 20-07-2027 | CLIMATE CONNECTIONS | Plot | ~1,500–2,800 sqft (estimate: filed carpet plus 25%) | Jul 2025 |
8 of 151 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open The Valley by Essem18 Phase 1 in the interactive atlas
Transfer of the land
Sale deed
in favour of Essem18 Developers Private Limited · Survey 103/12, 103/15
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Essem18 Developers Private Limited · Survey 103/12, 103/15
K-RERA filing, land schedule
Approval or registration
Khata issued
26 Gunta · Jayanagar Sub Registrar Office · Survey 103/12
K-RERA filing, land schedule
Approval or registration
Khata issued
27 Gunta · Jayanagar Sub Registrar Office · Survey 103/15
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office Bengaluru · Survey 103/12, 103/15
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office Bengaluru · Survey 103/12, 103/15
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMICAPA · plan BMICAPA/01/20/2025-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/281125/008284
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 6 Nov 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 103/12, 103/15 | |
|---|---|---|
| Land extent, Sy 103/12 | 26 Gunta | |
| Land extent, Sy 103/15 | 27 Gunta | |
| Area on the KGIS map | Not verified yet | |
| Khata | 26 Gunta · Jayanagar Sub Registrar Office · 5 Feb 2025; 27 Gunta · Jayanagar Sub Registrar Office · 5 Feb 2025 | |
| Sale deed | Dated 5 Feb 2025 | |
| Sale deed in favour of | Essem18 Developers Private Limited | |
| Building plan (BMICAPA) | Sanctioned 18 Oct 2025 · No. BMICAPA/01/20/2025-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Not verified yet | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | Converted 17 Jun 2025 · DC Office Bengaluru | |
|---|---|---|
| Survey numbers | 103/12 · 103/15 |
| Due on signing | Not verified yet | |
|---|---|---|
| Due within 15 days | Not verified yet | |
| Each construction stage | Not verified yet | |
| Floors in payment plan | Not verified yet | |
| Late-payment interest | Not verified yet | |
| Interest the builder pays on late possession | Rate prescribed in the Rules | |
| Transfer fee | Not verified yet | |
|---|---|---|
| Holding charge | Not verified yet | |
| Maintenance included | Not verified yet | |
| Defect liability | 5 years | |
| Jhanavi Trishul Alaska | about 2 km | Locked | |
|---|---|---|---|
| Axis Amarissa | about 3.5 km | Locked | |
| Mahindra Eden Phase-2 | about 3.5 km | Locked | |
| Srivara Vasudha | about 4 km | Locked | |
| Sattva Springs | about 4.5 km | Locked |
| The Valley by Essem18 Phase 1 This project | This project is the point the others are measured from | 31 Dec 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| Jhanavi Trishul Alaska | about 2 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
| Axis Amarissa | about 3.5 km | 31 Dec 2029 | 28% (23 of 81) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2 km, Kendriya nagara | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
As the promoter reported itPossession date in the agreement

| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Dec 2026 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 1 Oct 2025 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Chartered accountant's certificate, registration | Dated 6 Nov 2025 | |
Land · ₹8.68 Cr 75.4%Development · ₹2.83 Cr 24.6%
| Estimated cost | ₹11.56 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · GANDHI BAZAR, BASAVANAGUDI | |
|---|---|---|
| Designated account, collected | ₹10.85 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹7.09 Cr in Q2 2026-27 (65% of that quarter's deposits) | |
| Escrow account to date, Q4 2025-26 | ₹2.85 Cr deposited from sales | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 7 | |
|---|---|---|
| Marked completed | 3 | |
| Past promised date, not completed | 0 | Clear |
| Complaints filed against the promoter | 0 | |
| Other phases under this promoter name | 5 | |
| With a filed extension or completion | 3 (3 completed, 0 extended) | |
| Average schedule slip | 3 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 6 Nov 2025 | |
| Building plan (BMICAPA) | Sanctioned 18 Oct 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · GANDHI BAZAR, BASAVANAGUDI | |

| Sattva Forest Ridge | about 5 km | Locked |
|---|
| Harivishram | about 5 km | Locked |
|---|
| Samaya Sunshine | about 5.5 km | Locked |
|---|
| Garden Square | about 5.5 km | Locked |
|---|
| Good Earth Ochre | about 6 km | Locked |
|---|
| Good Earth Cadence | about 6 km | Locked |
|---|
| Platinum Landmark | about 6.5 km | Locked |
|---|
| Mahindra Eden Phase-2 |
|---|
| about 3.5 km |
| 30 Jul 2027 |
| 100% (250 of 250) |
| Locked |
| Srivara Vasudha | about 4 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
|---|
| Sattva Springs | about 4.5 km | 18 Sep 2027 | 38% (25 of 66) | Locked |
|---|
| Sattva Forest Ridge | about 5 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
|---|
| Projects within 4 km, counted | 14 (14 with an approximate location) | |
|---|---|---|
| Flats in them | 3,821 | |
| Booked | 2,284 of 3,821 (60%) | |
| Unsold | 1,537 | |
| Booked a month, pooled | 38 flats | |
| Months to sell, pooled | 41 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 2 km, Silk Institute | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 43 |
| MG Road (CBD) | 16 |
| Manyata Tech Park | 23.5 |
| ITPL, Whitefield | 28 |
| Ecospace, Bellandur ORR | 19.5 |
| Electronic City Ph 1 | 18 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1.5 km, named Tataguni on OpenStreetMap |
|---|