| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | ||||
| Aashirvad Siddhi PriyaFiled as completed · no completion certificate on record | SEENAPPA P | Plot | ~600–1,240 sqft (estimate: filed carpet plus 25%) | Nov 2024 |
| Aditya OrchardLapsed · completion date passed | Mangala Raghavan | Plot | ~1,200–1,800 sqft (estimate: filed carpet plus 25%) | May 2024 |
| Aprameya Brindavanam EliteCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Ashwasurya Atharva RitewayCompleted (regulator flag) | RITEWAY & KUBERA PROMOTERS | Plot | ~1,200–2,400 sqft (estimate: filed carpet plus 25%) | Completed |
| Axis Banyan CountyCompleted (regulator flag) | R.Harish babu | Plot | – | Completed |
| Birla Apple SpireLapsed · completion date passed | Apple spire India LLP | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: GEN Y SOCIAL COMMUNITIES LLP
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Forfeiture, agreement |
|---|
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 62 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| – |
| 1 |
| 1 |
| Review |
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 1,667 sqft carpet (as filed) |
| Sep 2019 |
| BloomfieldsActive · 85% built | Shravan Gupta | Plot | ~600–2,400 sqft (estimate: filed carpet plus 25%) | Apr 2029 |
| BlossomCompleted · OC 11-07-2024 | BRUHASPATI BUILDERS LLP | Apartment | 309 sqft carpet (as filed) | Completed |
8 of 101 other projects in Mysore Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open The High Line Park in the interactive atlas
Transfer of the land
Sale deed
Survey 43/30
K-RERA filing, land schedule
Approval or registration
Land use converted
The Special Deputy Commissioner (Revenue), Bangalore · Survey 43/30
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/PS/EM/EO-3/TA-2/S/06/2023-24
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Kambipura Village, Kumbalgudu Gram Panch · Survey 43/30
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/071123/006379
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 18 Aug 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | Private lender (individual) · ₹10.00 Cr disbursed | |
Page 1
Page 1 of 4 of the survey sketch. Filed with K-RERA: Conversion Order & Sketch, 4 pages, not in English.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 43/30 | |
|---|---|---|
| Land extent, Sy 43/30 | 2,398 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 2,398 sq m | |
| Khata | E Khatha · Kambipura Village, Kumbalgudu Gram Panch · 17 Jun 2023 | |
| Sale deed | Dated 26 Aug 1971 | |
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 2 Jun 2023 · No. BDA/PS/EM/EO-3/TA-2/S/06/2023-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/500/2022 · issued 29 Dec 2022 · building height 34.95 m | Clear |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-122146 · issued 19 Jan 2023 · valid until 6 Jan 2028 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Aug 2027 |
| Land conversion | Converted 13 May 2010 · The Special Deputy Commissioner (Revenue), Bangalore | |
|---|---|---|
| Survey numbers | 43/30 |
| Not verified yet |
| Forfeiture, allotment letter | Deducted on cancelling the allotment, within 15 days: nothing; 16 to 30 days: 1% of the cost of the unit; 31 to 60 days: 1.5% of the cost of the unit; after 61 days: 2% of the cost of the unit |
|---|
3BHK · avg 92 m² 60%2BHK 20%4BHK · avg 153 m² 20%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 11 | 8,837 |
| 3BHK | 33 | 32,615 |
| 4BHK | 11 | 18,105 |
| Sold, Q2 2026-27 | 41 / 57 | |
|---|---|---|
| Unsold, Q2 2026-27 | 16 | |
| Months to sell, derived from filed bookings | 10 months |
| Good Earth Cadence | 1.1 km | Locked | |
|---|---|---|---|
| Good Earth Ochre | 1.4 km | Locked | |
| Samaya Sunshine | about 5.5 km | Locked | |
| Sumadhura Pramoda | about 7.5 km | Locked |
| The High Line Park This project | This project is the point the others are measured from | 31 Aug 2027 | 72% (41 of 57) | Not verified yet |
|---|---|---|---|---|
| Good Earth Cadence | 1.1 km | 31 Dec 2028 | 72% (104 of 145) | Locked |
| Good Earth Ochre | 1.4 km | 31 Oct 2027 | 92% (35 of 38) | Locked |
| Samaya Sunshine |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 3.4 km, Kengeri Yellamma temple | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 1.5 km to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 470 m to the north-west, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance | |
|---|---|---|
| Electricity, built | 45% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.84 (48 covered spaces for 57 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not verified yet | |
As the promoter reported it

| Main structure | 100% · planned by 31 Dec 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 31 Mar 2025 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2025 | |
| RERA completion date | 31 Aug 2027 | |
| Work began, as filed | 1 Sep 2023 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | External walls: 6" | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 34.95 m on the fire NOC · 34.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows (sliding) | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles | Ceramic tiles (floor) | |
| Wiring | Fire-resistant copper wiring | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Full power backup in flats | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/500/2022 · issued 29 Dec 2022 · building height 34.95 m | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 27 Sep 2023 · site inspected 27 Sep 2023 | |
| Engineer's certificate, registration | Dated 27 Sep 2023 | |
| Chartered accountant, Form 4 | Dated 13 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹7.59 Cr 18.9%Development · ₹32.65 Cr 81.1%
| Estimated cost | ₹40.24 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹31.47 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹10.94 Cr | |
| Land cost revision | Not verified yet | |
Sold (41) 71.9%Unsold (16) 28.1%
| Sold, Q3 2025-26 | 27 / 57 · 30 available | |
|---|---|---|
| Sold, Q4 2025-26 | 29 / 57 · 28 available | |
| Sold, Q1 2026-27 | 39 / 57 · 18 available | |
| Sold, Q2 2026-27 | 41 / 57 · 16 available | |
| Unsold, Q2 2026-27 | 16 | |
| Sold in Q4 2025-26 | 2 | |
| Sold in Q1 2026-27 | 10 | |
| Sold in Q2 2026-27 | 2 |
| Escrow bank | INDUSIND BANK · Whitefield | |
|---|---|---|
| Designated account, collected | ₹7.73 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹3.87 Cr in Q2 2026-27 (50% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹4,48,64,056 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Private lender (individual) · ₹10.00 Cr disbursed | |
|---|---|---|
| Records searched to | 18 Aug 2023 | Review |
| Building plan (BDA) | Sanctioned 2 Jun 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | INDUSIND BANK · Whitefield | |

Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Good Earth Cadence, price locked; Good Earth Ochre, price locked.
| Jhanavi Trishul Alaska | 8.7 km | Locked |
|---|
| Axis Amarissa | about 9 km | Locked |
|---|
| Sobha Royal Crest | about 9.5 km | Locked |
|---|
| Harivishram | about 9.5 km | Locked |
|---|
| Garden Square | 9.7 km | Locked |
|---|
| Mahindra Eden Phase-2 | about 10 km | Locked |
|---|
| Srivara Vasudha | about 10 km | Locked |
|---|
| Sattva Springs | about 10 km | Locked |
|---|
| about 5.5 km |
| 31 Dec 2026 |
| 33% (8 of 24) |
| Locked |
| Sumadhura Pramoda | about 7.5 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
|---|
| Jhanavi Trishul Alaska | 8.7 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
|---|
| Axis Amarissa | about 9 km | 31 Dec 2029 | 28% (23 of 81) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹28,000 /mo · 5 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹24,150 /mo · 5 listings | |
| Rent per sq ft, 3 km | ₹25.9 /mo, as listed · 11 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 18 (5 with an approximate location) | |
|---|---|---|
| Flats in them | 5,068 | |
| Booked | 2,570 of 5,068 (51%) | |
| Unsold | 2,498 | |
| Booked a month, pooled | 33 flats | |
| Months to sell, pooled | 75 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 3.6 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 1.5 km to the north-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 1.6 km, Challaghatta | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 44.2 |
| MG Road (CBD) | 18.8 |
| Manyata Tech Park | 25.2 |
| ITPL, Whitefield | 32.6 |
| Ecospace, Bellandur ORR | 24.9 |
| Electronic City Ph 1 | 24.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 630 m to the north-west, named STP-6 on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.0 km to the north-east |