Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| Aditya OrchardLapsed · completion date passed | Mangala Raghavan | Plot | ~1,200–1,800 sqft (estimate: filed carpet plus 25%) | May 2024 |
| Aprameya Brindavanam EliteCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Ashwasurya Atharva RitewayCompleted (regulator flag) | RITEWAY & KUBERA PROMOTERS | Plot | ~1,200–2,400 sqft (estimate: filed carpet plus 25%) | Completed |
| Axis Banyan CountyCompleted (regulator flag) | R.Harish babu | Plot | – | Completed |
| Birla Apple SpireLapsed · completion date passed | Apple spire India LLP | Apartment | 1,667 sqft carpet (as filed) | Sep 2019 |
| BloomfieldsActive · 85% built | Shravan Gupta | Plot | ~600–2,400 sqft (estimate: filed carpet plus 25%) | Apr 2029 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 12 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| BlossomCompleted · OC 11-07-2024 | BRUHASPATI BUILDERS LLP | Apartment | 309 sqft carpet (as filed) | Completed |
| BotanicaCompleted (regulator flag) | SOUTHWEST DEVELOPERS | Plot | ~1,200–4,000 sqft (estimate: filed carpet plus 25%) | Completed |
8 of 101 other projects in Mysore Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aashirvad Siddhi Priya in the interactive atlas
Transfer of the land
Sale deed
Survey 39/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 39/12
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 39/11
K-RERA filing, land schedule
Approval or registration
Land use converted
DC BENGALURU URBAN · Survey 39/3
K-RERA filing, land schedule
Approval or registration
Land use converted
DC BENGALURU URBAN · Survey 39/11, 39/12
K-RERA filing, land schedule
Approval or registration
Land use converted
DC BENGALURU URBAN · Survey 39/11, 39/12
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · PANCHAYATI RAJ · Survey 39/3, 39/11, 39/12
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · PANCHAYATI RAJ · Survey 39/3, 39/11, 39/12
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · PANCHAYATI RAJ · Survey 39/3, 39/11, 39/12
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Magadi Planning Authority · plan MAAYOPRAA/LAO/25/2022-23/1263
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/030125/007344
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 5 Apr 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: 5 ADLR Sketch, 1 page, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 39/3, 39/11, 39/12 | |
|---|---|---|
| Land extent, Sy 39/3 | 2A | |
| Land extent, Sy 39/11 | 1A | |
| Land extent, Sy 39/12 | 1A 13G | |
| Area on the KGIS map | Not verified yet | |
| Khata | A Khatha · PANCHAYATI RAJ · 2 Mar 2023 | |
| Sale deed | Dated 23 Jan 2020, 25 Oct 2021, 25 Nov 2021 | |
| Building plan (Magadi Planning Authority) | Sanctioned 6 Mar 2023 · No. MAAYOPRAA/LAO/25/2022-23/1263 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 5 Nov 2024 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 39/3 | Converted 30 May 2022 · DC BENGALURU URBAN | |
| Sy 39/11, 39/12 | Converted 31 May 2022 · DC BENGALURU URBAN | |
| Survey numbers | 39/3 · 39/11 · 39/12 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
| Good Earth Cadence | about 10.5 km | Locked | |
|---|---|---|---|
| Good Earth Ochre | about 11 km | Locked |
| Aashirvad Siddhi Priya This project | This project is the point the others are measured from | 5 Nov 2024 | Not filed | Not verified yet |
|---|---|---|---|---|
| Good Earth Cadence | about 10.5 km | 31 Dec 2028 | 72% (104 of 145) | Locked |
| Good Earth Ochre | about 11 km | 31 Oct 2027 | 92% (35 of 38) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 13 km, Kengeri Yellamma temple | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (SULIVARA VILLAGE) | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Possession, agreement | 31 Mar 2025 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 5 Nov 2024 | |
| Work began, as filed | 1 Apr 2023 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Chartered accountant's certificate, registration | Dated 22 Jun 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹6.04 Cr 80%Development · ₹1.51 Cr 20%
| Estimated cost | ₹7.55 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · RAJARAJESHWARI NAGAR | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Other phases under this promoter name | 263 | |
|---|---|---|
| With a filed extension or completion | 120 (86 completed, 34 extended) | |
| Average schedule slip | 10 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 5 Apr 2024 | Review |
| Building plan | Sanctioned 6 Mar 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · RAJARAJESHWARI NAGAR | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 10.5 km, Challaghatta | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 50.5 |
| MG Road (CBD) | 27.5 |
| Manyata Tech Park | 32.5 |
| ITPL, Whitefield | 42 |
| Ecospace, Bellandur ORR | 34.5 |
| Electronic City Ph 1 | 34.5 |
| Quarry |
|---|
| about 1 km |
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | None within 3 km |
|---|