| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) | Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 61 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Akkshara CountyApplied for completion 24/06/2022 | G KRISHNA KUMAR | Plot | – | Jul 2021 |
| Alur Phase 2Lapsed · completion date passed | Bangalore Development Authority | Apartment | 1,781 sqft carpet (as filed) | Mar 2018 |
| Arine Golden BellsLapsed · completion date passed | M/s.Arine Structures | Mixed development | – | Apr 2022 |
| Artemis Address (In Association With Mythreyi)Applied for completion 31/12/2025 | INDIABUILD REAL ESTATES PVT LTD | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
| Artemis Address Phase 2Active · 95% built | Address Maker | Plot | 1,200–1,500 sqft | Dec 2027 |
8 of 72 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sipani Samuha in the interactive atlas
Approval or registration
Khata issued
A Khatha · BBMP · Survey 122/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 122/3
K-RERA filing, land schedule
Approval or registration
Land use converted
DC OFFICE BANGALORE URBAN · Survey 122/3
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/ADDL.DIR/JD/SOUTH/0073/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/310125/007462
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 4 Aug 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 122/*/3 | |
|---|---|---|
| Land extent, Sy 122/*/3 | 2.18.10.00 | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 8,094 sq m | |
| Khata | A Khatha · BBMP · 1 Aug 2024 | |
| Sale deed | Dated 2 Aug 2024 | |
| Building plan (BBMP) | Sanctioned 6 Jan 2025 · No. BBMP/ADDL.DIR/JD/SOUTH/0073/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/069/2024 · issued 10 Jun 2024 · building height 62.3 m | Clear |
| Environmental clearance | SEIAA 21 CON 2024 · EC identification no. EC24C3801KA5845103N · issued 16 Aug 2024 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 18 May 2024 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2029 |
| Land conversion | Converted 9 Dec 2024 · DC OFFICE BANGALORE URBAN | |
|---|---|---|
| Survey numbers | 122/*/3 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
2BHK · avg 67 m² 66.2%3BHK · avg 91 m² 33.3%1BHK · 43 m² 0.4%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 1BHK | 1 | 463 |
| 2BHK | 157 | 718 |
| 3BHK | 79 | 983 |
| Sold, Q2 2026-27 | 182 / 237 | |
|---|---|---|
| Unsold, Q2 2026-27 | 55 | |
| Months to sell, derived from filed bookings | 18 months |
| Vruksha Greens | 4.6 km | Locked | |
|---|---|---|---|
| Royal Enclave | about 5 km | Locked | |
| Birla Tisya | 8.1 km | Locked | |
| Rubby Castle 1 | about 9 km | Locked | |
| Vista Padmalaya | about 9 km | Locked |
| Sipani Samuha This project | This project is the point the others are measured from | 31 Dec 2029 | 77% (182 of 237) | Not verified yet |
|---|---|---|---|---|
| Vruksha Greens | 4.6 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Royal Enclave | about 5 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
| Birla Tisya | 8.1 km | 31 Dec 2026 |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | A 220 kV line passes 10 m from the filed location: close enough that its corridor may cross the site | Review |
| Nearest government-flagged flood location | 560 m, Andanappa layout Doddabidarakallu | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 60 m to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 430 m to the east, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity | |
|---|---|---|
| Electricity, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.03 (243 covered spaces for 237 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
As the promoter reported it

| Main structure | 38% · planned by 31 Dec 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Dec 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 38% | |
| Completion, accountant | 51.1% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2029 | |
| Work began, as filed | 1 Feb 2025 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 62.3 m on the fire NOC · 62 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/069/2024 · issued 10 Jun 2024 · building height 62.3 m | |
| Environmental clearance | SEIAA 21 CON 2024 · EC identification no. EC24C3801KA5845103N · issued 16 Aug 2024 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹56.66 Cr 33.2%Development · ₹113.90 Cr 66.8%
| Estimated cost | ₹170.56 Cr | |
|---|---|---|
| Cost incurred | ₹87.24 Cr (51.1% of the estimate) | |
| Cost left | ₹83.32 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹132.62 Cr | |
| Land cost revision | Not verified yet | |
Sold (182) 76.8%Unsold (55) 23.2%
| Sold, Q3 2025-26 | 155 / 237 · 82 available | |
|---|---|---|
| Sold, Q4 2025-26 | 171 / 237 · 66 available | |
| Sold, Q1 2026-27 | 164 / 237 · 73 available | |
| Sold, Q2 2026-27 | 182 / 237 · 55 available | |
| Unsold, Q2 2026-27 | 55 | |
| Sold in Q4 2025-26 | 16 | |
| Sold in Q1 2026-27 | 7 bookings cancelled or corrected (171 → 164 sold) | |
| Sold in Q2 2026-27 | 18 |
| Escrow bank | FEDERAL BANK OF INDIA · BANGALORE / BANNERGHATTA IIMB | |
|---|---|---|
| Designated account, collected | ₹17.31 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹3.71 Cr in Q2 2026-27 (21% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 8 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 4 | Review |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 4 Aug 2024 | Review |
| Building plan (BBMP) | Sanctioned 6 Jan 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | FEDERAL BANK OF INDIA · BANGALORE / BANNERGHATTA IIMB | |

| Renaissance Srichakra | about 9.5 km | Locked |
|---|
| Sri Rama Enclave | about 10 km | Locked |
|---|
| Shriram Solitaire | about 11 km | Locked |
|---|
| Sumadhura Pramoda | about 12 km | Locked |
|---|
| 100% (392 of 392) |
| Locked |
| Rubby Castle 1 | about 9 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
|---|
| Vista Padmalaya | about 9 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
|---|
| Renaissance Srichakra | about 9.5 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
|---|
| Rent, 2BHK, 3 km | ₹17,000 /mo · 13 listings | |
|---|---|---|
| Rent, 1BHK, 3 km | ₹10,000 /mo · 9 listings | |
| Rent per sq ft, 3 km | ₹21.7 /mo, as listed · 13 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 5 (2 with an approximate location) | |
|---|---|---|
| Flats in them | 1,292 | |
| Booked | 884 of 1,292 (68%) | |
| Unsold | 408 | |
| Booked a month, pooled | 38 flats | |
| Months to sell, pooled | 11 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 2.9 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 60 m to the west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 2.1 km, Chikkabidarakallu | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 30.4 |
| MG Road (CBD) | 14.4 |
| Manyata Tech Park | 14.9 |
| ITPL, Whitefield | 28.0 |
| Ecospace, Bellandur ORR | 24.5 |
| Electronic City Ph 1 | 30.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.2 km to the north-east, named Nagasandra Phase I 20MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.9 km to the east, named KPTCL HMT Layout on OpenStreetMap |