~1,060–2,000 sqft (estimate: filed carpet plus 25%)
Jun 2027
Title & ownership
Who owns it, and is the title clean?
Locked
Title opinionNot verified yet
Records searched to•• ••• ••••
Charges on the landNot verified yet
Landowner share of salesNot verified yet
Land and deed chain
How the land reached this project
•• ••• ••••
•• ••• ••••
•• ••• ••••
Approvals
Is it approved for its use?
Red flag1 red flag · 1 to review · 1 clear
Building plan (BDA)Not verified yet
RERA extensionsGranted!ReviewReview
RERA complaints17×Red flagRed flag
Land conversionNot verified yet
Permits
Validity
Not verified yet
Approval letters
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the landNot checked
Cases on the builder45 cases
RERA complaints17 cases
Builder's other projects108 cases
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
Contract & costs
What does a buyer commit to?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Forfeiture, agreement20% of the sale considerationAgreement for sale, p. 6
Forfeiture, allotment letterNot verified yet
Transfer fee₹150 per sq ftAgreement for sale, p. 16
Maintenance includedNot verified yet
Cancellation
Forfeiture
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Recent price, super built-upNot verified yet
Recent price, carpetNot verified yet
Phase 1 → Phase 2Not verified yet
Gross yield, per sq ftNot verified yet
This project
Price
Price per sq ft, super built-up
Not verified yet
Form 4 certified totals
Location & risks
What is the location like?
Height above nearest drainNot verified yet
Groundwater, taluk average16.9 m below groundBengaluru South taluk, July 2023
Water supply, as filedSelf developmentDeclared by the promoter
Metro, operationalNot verified yet
The site
Zoning & hazards
Planning and hazards
Construction & progress
How is it being built, and when will it be ready?
Red flag1 red flag
CompletionLapsed
Possession, agreementNot verified yet
StructureNot verified yet
Structural safety certificateNot verified yet
Progress
Completion, architect
Lapsed
Work left
By component
Lapsed
Developer
Can the developer deliver?
Review1 to review
Receivable, sold flatsNot verified yet
Cost leftNot verified yet
SoldLapsed
Sold in the latest quarterLapsed
Funding
Estimated cost
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNot verified yet
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed73On K-RERA
Available73100% of filed
K-RERA only0
Approvals with a validity dateNone read
Approvals & NOCs
What we read
Fire NOCGBC(1)28/2007Filed as Fire Force Department, pp. 1, 3
Fire NOCbuilding height 57.6 mFiled as Fire Force Department, pp. 1, 3
1 pageAvailable
Filed 1 Apr 202213 pagesAvailable
Filed 1 Apr 20222 pagesAvailable
Filed 1 Apr 20222 pagesAvailable
Filed 1 Apr 20225 pagesAvailable
Filed 1 Apr 20221 pageAvailable
Filed 28 Apr 20223 pagesAvailable
2 pagesAvailable
27 pagesAvailable
15 pages2 factsAvailable
2 pagesAvailable
3 pagesAvailable
2 pagesAvailable
4 pagesAvailable
1 pageAvailable
Source: K-RERA project page and the documents filed there, as read by us. 6 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Shriram Southern Crest is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
Not verified yet
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Building plan (BDA)
Not verified yet
Power NOC (BESCOM)
Filed with the registration
Fire NOC
GBC(1)28/2007 · building height 57.6 m
✓Clear
Environmental clearance
Not verified yet
Airport height NOC
Filed with the registration
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
Granted · Approved 4 Jun 2022
RERA complaints
17
RERA completion date
30 Mar 2023
Registration certificates
PRM/KA/RERA/1251/310/PR/171014/000364
EX/PRM/KA/RERA/1251/310/PR/220604/000364
Land use
Conversion order
Not verified yet
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
about 0.5 km from the locality centre, primary drain
Nearest lake, tank or pond
about 0.5 km from the locality centre, an unnamed water body
Height above nearest drain
Not verified yet
Amenities
Specification and Form 5
Not verified yet
Around it
Water
Groundwater, Bengaluru South taluk average
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
Water at a glance
Groundwater
Bengaluru South taluk average, July 2023: 16.9 m below ground
What it means
Not verified yet
Water below ground
16.9 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Self development
Nearest city water main
Not verified yet
Distances
Measured from the site
Height above nearest drain
Not verified yet
Nearest drain
about 0.5 km from the locality centre, primary drain
Ground level
Not verified yet
Metro, operational
Not verified yet
Metro, under construction
Not verified yet
Connectivity
Road distance from the site
Not verified yet
Six city anchors · OSRM, no traffic
Not verified yet
Nuisances
Distance from the site
Locality only filed: no distance from the site to show
DOSL nuisance layer
Landfill or waste transfer station
None within 3 km of the locality centre
Sewage treatment plant
about 1 km from the locality centre
Quarry
None within 3 km of the locality centre
Crematorium
None within 3 km of the locality centre
Prison
None within 3 km of the locality centre
Electrical substation
about 0.5 km from the locality centre, named PLRD Electrict Yard on OpenStreetMap
Quarterly return
Lapsed
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
31 May 2021
RERA completion date
30 Mar 2023
×Red flag
Work began, as filed
14 Jan 2017
Specified structure
What the promoter specified · not an inspection
Structure
Not verified yet
Foundation
Not verified yet
Wall material
Not verified yet
Wall thickness
Not verified yet
Concrete / steel grade
Not verified yet
Building heights, fire NOC
57.6 m on the fire NOC
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.