Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Aashirvad Siddhi PriyaFiled as completed · no completion certificate on record | SEENAPPA P | Plot | ~600–1,240 sqft (estimate: filed carpet plus 25%) | Nov 2024 |
| Aditya OrchardLapsed · completion date passed | Mangala Raghavan | Plot | ~1,200–1,800 sqft (estimate: filed carpet plus 25%) | May 2024 |
| Aprameya Brindavanam EliteCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Ashwasurya Atharva RitewayCompleted (regulator flag) | RITEWAY & KUBERA PROMOTERS | Plot | ~1,200–2,400 sqft (estimate: filed carpet plus 25%) | Completed |
| Axis Banyan CountyCompleted (regulator flag) | R.Harish babu | Plot | – | Completed |
| Birla Apple SpireLapsed · completion date passed | Apple spire India LLP | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 59 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 1,667 sqft carpet (as filed) |
| Sep 2019 |
| BloomfieldsActive · 85% built | Shravan Gupta | Plot | ~600–2,400 sqft (estimate: filed carpet plus 25%) | Apr 2029 |
| BlossomCompleted · OC 11-07-2024 | BRUHASPATI BUILDERS LLP | Apartment | 309 sqft carpet (as filed) | Completed |
8 of 101 other projects in Mysore Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sbr Global Queens Ville in the interactive atlas
Transfer of the land
Title deed executed
No. KEN-1-32968-2006-07 · Book 1 · Consideration ₹55.8 L
Title deed filed with K-RERA, pp. 1, 9, 10 · See it in Documents
Transfer of the land
Sale deed
Survey 145/4
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 145/2
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 145/1
K-RERA filing, land schedule
Approval or registration
Land use converted
District Collector Bangalore · Survey 145/2
K-RERA filing, land schedule
Approval or registration
Land use converted
District Collector, Bangalore · Survey 145/1, 145/4
K-RERA filing, land schedule
Approval or registration
Land use converted
District Collector, Bangalore · Survey 145/1, 145/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Kumbalagodu Gram Panchayath · Survey 145/1, 145/2, 145/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Kumbalagodu Gram Panchayath · Survey 145/1, 145/2, 145/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Kumbalagodu Gram Panchayath · Survey 145/1, 145/2, 145/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan NPK4 01/2025-2026
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/240625/007865
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | BAJAJ HOUSING FINANCE LIMITED · ₹110.00 Cr disbursed | |
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 46,488 sq m | |
| Extent the filed land schedule names for these survey numbers | 32,780 sq m | |
| Plot area against the filed extent | 1.42 times | |
| Land area filed with K-RERA | 32,779 sq m | |
| Village, hobli and taluk on the KGIS map | Kumbalagodu, Kengeri-2 hobli, Bangalore-South taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 145/1, 145/2, 145/4 | |
|---|---|---|
| Land extent, Sy 145/1 | 2 Acre | |
| Land extent, Sy 145/2 | 3 Acre | |
| Land extent, Sy 145/4 | 3 ACre 4 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 32,779 sq m | |
| Khata | E Khatha · Kumbalagodu Gram Panchayath · 21 Feb 2025 | |
| Sale deed | Dated 8 Dec 2006, 11 Dec 2006, 11 Jan 2008 | |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 145/1 | 4 | 2 acres | 0 | |||
| Sy. No. 145/2 | 4 | 3 acres | 0 | |||
| Sy. No. 145/4 | 4 | 3 acres 4 guntas | 0 |
| Building plan (BDA) | Sanctioned 7 Apr 2025 · No. NPK4 01/2025-2026 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2029 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 145/1, 145/4 | Converted 14 Mar 2023 · District Collector, Bangalore | |
| Sy 145/2 | Converted 14 Mar 2023 · District Collector Bangalore | |
| Survey numbers | 145/1 · 145/2 · 145/4 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
2BHK & 3BHK · avg 126 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK & 3BHK | 441 | 1,351 |
| Sold, Q4 2025-26 | 158 / 441 | |
|---|---|---|
| Unsold, Q4 2025-26 | 283 | |
| Months to sell, derived from filed bookings | 26 months |
| Good Earth Cadence | 2.3 km | Locked | |
|---|---|---|---|
| Good Earth Ochre | 2.6 km | Locked | |
| Samaya Sunshine | about 6.5 km | Locked | |
| Sumadhura Pramoda | about 8 km | Locked |
| Sbr Global Queens Ville This project | This project is the point the others are measured from | 31 Dec 2029 | 36% (158 of 441) | Not verified yet |
|---|---|---|---|---|
| Good Earth Cadence | 2.3 km | 31 Dec 2028 | 72% (104 of 145) | Locked |
| Good Earth Ochre | 2.6 km | 31 Oct 2027 | 92% (35 of 38) | Locked |
| Samaya Sunshine |
| Rent per sq ft, 3 km | ₹22.5 /mo, as listed · 6 listings with a size | |
|---|---|---|
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (general), at the filed pin | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 4.5 km, Kengeri Yellamma temple | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 1.8 km to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 270 m to the north-east, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| CCTV Surveillance, built | 0% | |
| Community Hall, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.72 (758 covered spaces for 441 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | Not started · planned by 31 Dec 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Dec 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 10% | |
| Completion, accountant | 24.5% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Jun 2029 | |
| RERA completion date | 31 Dec 2029 | |
| Work began, as filed | 1 Jun 2025 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.5 m filed, 14 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 296.48 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Jul 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Jul 2026 (2 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹85.22 Cr 17.4%Development · ₹404.00 Cr 82.6%
| Estimated cost | ₹489.22 Cr | |
|---|---|---|
| Cost incurred | ₹119.93 Cr (24.5% of the estimate) | |
| Cost left | ₹369.29 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹190.81 Cr | |
| Land cost revision | Not verified yet | |
Sold (158) 35.8%Unsold (283) 64.2%
| Sold, Q3 2025-26 | 125 / 441 · 316 available | |
|---|---|---|
| Sold, Q4 2025-26 | 158 / 441 · 283 available | |
| Unsold, Q4 2025-26 | 283 | |
| Sold in Q4 2025-26 | 33 |
| Escrow bank | HDFC · Kadugodi | |
|---|---|---|
| Designated account, collected | ₹20.53 Cr in Q4 2025-26 | |
| Designated account, withdrawn | ₹14.37 Cr in Q4 2025-26 (70% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | BAJAJ HOUSING FINANCE LIMITED · ₹110.00 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 7 Apr 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Kadugodi | |

Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Good Earth Cadence, price locked; Good Earth Ochre, price locked.
| Jhanavi Trishul Alaska | 10.0 km | Locked |
|---|
| Axis Amarissa | about 10 km | Locked |
|---|
| Sobha Royal Crest | about 10.5 km | Locked |
|---|
| Harivishram | about 10.5 km | Locked |
|---|
| Garden Square | 10.8 km | Locked |
|---|
| Mahindra Eden Phase-2 | about 11 km | Locked |
|---|
| Sattva Springs | about 11 km | Locked |
|---|
| Srivara Vasudha | about 11 km | Locked |
|---|
| about 6.5 km |
| 31 Dec 2026 |
| 33% (8 of 24) |
| Locked |
| Sumadhura Pramoda | about 8 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
|---|
| Jhanavi Trishul Alaska | 10.0 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
|---|
| Axis Amarissa | about 10 km | 31 Dec 2029 | 28% (23 of 81) | Locked |
|---|
| Projects within 4 km, counted | 16 (3 with an approximate location) | |
|---|---|---|
| Flats in them | 4,867 | |
| Booked | 2,512 of 4,867 (52%) | |
| Unsold | 2,355 | |
| Booked a month, pooled | 33 flats | |
| Months to sell, pooled | 71 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 4.5 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 1.8 km to the north, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 2.4 km, Challaghatta | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 44.7 |
| MG Road (CBD) | 19.7 |
| Manyata Tech Park | 25.9 |
| ITPL, Whitefield | 33.6 |
| Ecospace, Bellandur ORR | 26.0 |
| Electronic City Ph 1 | 26.0 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 630 m to the east, named STP-6 on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.7 km to the east |