Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Akruti ArkLapsed · completion date passed | Akruti Homes Bangalore Private Limited | Apartment | – | Jul 2024 |
| Arun ConstructionsCompleted (regulator flag) | ARUN CONSTRUCTIONS | Apartment | 854 sqft carpet (as filed) | Completed |
| Assetz Canvas & Cove - Phase 1 Wing A & BActive · 100% built | APG HABITAT PRIVATE LIMITED | Apartment | 266–820 sqft carpet (as filed) | Apr 2027 |
| Assetz Canvas & Cove 2.0 - Block AActive · 65% built | APG HABITAT PRIVATE LIMITED | Apartment | 298–1,143 sqft carpet (as filed) | Apr 2029 |
| Assetz Canvas & Cove 2.0 – Block B & CActive · 74% built | APG HABITAT PRIVATE LIMITED | Apartment | 277–1,141 sqft carpet (as filed) | Oct 2028 |
| Aswani SunshineLapsed · completion date passed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 23 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Aswani Properties India Pvt Ltd |
| Apartment |
| 377 sqft carpet (as filed) |
| Jul 2019 |
| Blossom ParkCompleted (regulator flag) | Elita Enterprises LLP | Plot | ~1,200 sqft (estimate: filed carpet plus 25%) | Completed |
| BrindavanLapsed · completion date passed | Sri Krishna Group | Apartment | 575 sqft carpet (as filed) | Dec 2024 |
8 of 64 other projects in Hosur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Purva Heritage in the interactive atlas
Approval or registration
Land use converted
BDA CLU · Survey 5715248199
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 5715248199
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan GBA/BSCC/2338/25-26IN
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/090726/008801
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 5715248199 | |
|---|---|---|
| Land extent, Sy 5715248199 | 85,058 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 6,781 sq m | |
| Khata | E Khatha · BBMP · 17 Apr 2025 | |
| Building plan (BBMP) | Sanctioned 25 Jun 2026 · No. GBA/BSCC/2338/25-26IN | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Aug 2030 |
| Land conversion | Converted 17 Sep 2007 · BDA CLU | |
|---|---|---|
| Survey numbers | 5715248199 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK · avg 110 m² 74.3%2BHK · avg 74 m² 25.7%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 38 | 795 |
| 3BHK | 110 | 1,181 |
| Sold, Q2 2026-27 | 0 / 148 | |
|---|---|---|
| Unsold, Q2 2026-27 | 148 |
| Dhiraan Lotus | about 1 km | Locked | |
|---|---|---|---|
| Abhee Riviera Royale | about 1.5 km | Locked | |
| Mahindra NewHaven | about 2 km | Locked | |
| Mahindra Zen | about 2 km | Locked | |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 2 km |
| Purva Heritage This project | This project is the point the others are measured from | 31 Aug 2030 | 0% (0 of 148) | Not verified yet |
|---|---|---|---|---|
| Dhiraan Lotus | about 1 km | 31 Dec 2027 | 56% (20 of 36) | Locked |
| Abhee Riviera Royale | about 1.5 km | 28 Feb 2027 | 59% (57 of 96) | Locked |
| Mahindra NewHaven |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, B.T.R GARDEN LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.34 (199 covered spaces for 148 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
| Main structure | Not started · planned by 31 Dec 2029 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Nov 2030 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 0% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Nov 2030 | |
| RERA completion date | 31 Aug 2030 | |
| Work began, as filed | 1 Jul 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 66.75 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹158.49 Cr 47.3%Development · ₹176.62 Cr 52.7%
| Estimated cost | ₹335.11 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Unsold (148) 100%
| Sold, Q2 2026-27 | 0 / 148 · 148 available | |
|---|---|---|
| Unsold, Q2 2026-27 | 148 |
| Escrow bank | HDFC · Ulsoor Road | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 30 | |
|---|---|---|
| Marked completed | 9 | |
| Past promised date, not completed | 6 | |
| Complaints filed against the promoter | 111 | |
| Other phases under this promoter name | 28 | |
| With a filed extension or completion | 14 (9 completed, 5 extended) | |
| Average schedule slip | 12 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 25 Jun 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Ulsoor Road | |
| Locked |
| Assetz Canvas & Cove 2.0 - Block A | about 2.5 km | Locked |
|---|
| K&T's Sai Sannidhi | about 2.5 km | Locked |
|---|
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 2.5 km | Locked |
|---|
| Azur Phase 2 | about 3 km | Locked |
|---|
| Pacific Legacy | about 3.5 km | Locked |
|---|
| Azur Tower D | about 4 km | Locked |
|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 4 km | Locked |
|---|
| about 2 km |
| 28 Dec 2029 |
| 89% (106 of 119) |
| Locked |
| Mahindra Zen | about 2 km | 31 Dec 2028 | 100% (227 of 228) | Locked |
|---|
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 2 km | 30 Apr 2027 | 100% (272 of 273) | Locked |
|---|
| Assetz Canvas & Cove 2.0 - Block A | about 2.5 km | 30 Apr 2029 | 98% (238 of 244) | Locked |
|---|
| Projects within 4 km, counted | 37 (37 with an approximate location) | |
|---|---|---|
| Flats in them | 9,359 | |
| Booked | 5,783 of 9,359 (62%) | |
| Unsold | 3,576 | |
| Booked a month, pooled | 125 flats | |
| Months to sell, pooled | 29 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 0.5 km, Kudlu Gate | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 35 |
| MG Road (CBD) | 10.5 |
| Manyata Tech Park | 17.5 |
| ITPL, Whitefield | 15 |
| Ecospace, Bellandur ORR | 6 |
| Electronic City Ph 1 | 7 |
| Landfill or waste transfer station | about 1 km, named Karnataka Compost Development Centre - KCDC on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 0.5 km, named Chikkabeguru Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 1 km, named Kudlu Crematorium on OpenStreetMap | |
| Prison | about 3 km to the east, named Bangalore Central Jail on OpenStreetMap | |
| Electrical substation | about 1.5 km, named HSR Layout Substation on OpenStreetMap |