| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Airport CityLapsed · completion date passed | Srinivasa M | Plot | – | Dec 2021 |
| Arvind GreatlandsApplied for completion 16/12/2024 | Arvind SmartSpaces | Plot | 1,200–2,400 sqft | – |
| Assetz City Of PalmsActive · 86% built | ASSETZ INVESTMENTS AND HOLDINGS PRIVATE LIMITED | Plot | ~1,200–2,020 sqft (estimate: filed carpet plus 25%) | Feb 2029 |
| Atmos SilverwoodsExtended to 31-05-2027 | ATMOS CONSTRUCTIONS PRIVATE LIMITED | Villa | 2,333 sqft carpet (as filed) | May 2027 |
| Canterburry MeadowsApplied for completion 10/05/2024 | ARUNAPANCHAMI ESTATES PRIVATE LIMITED | Plot | ~1,280 sqft (estimate: filed carpet plus 25%) | Mar 2020 |
| Canterbury HillviewApplied for completion 23/01/2023 | SLNS AVYUKTHA HOMES | Plot | – | Jul 2021 |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 10 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. 1 of 3 filed survey numbers matched, 2 could not be read.
| Valuation |
|---|
| – |
| – |
| – |
| Not verified |
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Century GreensApplied for completion 12/07/2022 | Century Star | Plot | – | Dec 2021 |
| Century Greens Phase 2Applied for completion 07/04/2022 | CENTURY STAR | Plot | ~1,160–2,400 sqft (estimate: filed carpet plus 25%) | Dec 2021 |
8 of 32 other projects in Doddaballapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Pms Lake View in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (BIAPPA) | Sanctioned 5 Aug 2022 · No. BIAAPA/TP/LAO/20/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 16 Jan 2023 |
| Land conversion | Converted 27 Apr 2022 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 10-3 · 10-4 · 11 |
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Sattva Vasanta Skye | 7.3 km | Locked | |
|---|---|---|---|
| Sattva Vasanta Cove | 7.5 km | Locked | |
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 7.5 km | Locked | |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 7.5 km | Locked |
| Pms Lake View This project | This project is the point the others are measured from | 16 Jan 2023 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sattva Vasanta Skye | 7.3 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
| Sattva Vasanta Cove | 7.5 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 16.1 km, Kondappa layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 50 m to the south, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 16 Jan 2023 | |
| Work began, as filed | 5 Aug 2022 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 13 Dec 2022 · site inspected 12 Dec 2022 | |
| Engineer's certificate, registration | Dated 13 Dec 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹1.59 Cr 37.4%Development · ₹2.67 Cr 62.6%
| Estimated cost | ₹4.26 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹2.02 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Union Bank of India · Yelahanka Bengaluru | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BIAPPA) | Sanctioned 5 Aug 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Union Bank of India · Yelahanka Bengaluru | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 7.5 km | Locked |
|---|
| Godrej MSR City | 8.0 km | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 8.5 km | Locked |
|---|
| Sattva City | 8.4 km | Locked |
|---|
| Barca II At Godrej Msr City | about 8.5 km | Locked |
|---|
| Ekta Elements | 9.2 km | Locked |
|---|
| Varnam Phase 1c | about 9.5 km | Locked |
|---|
| Birla Trimaya Phase-3 | 9.3 km | Locked |
|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 |
|---|
| about 7.5 km |
| 31 Dec 2026 |
| 100% (30 of 30) |
| Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 7.5 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
|---|
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 7.5 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
|---|
| Godrej MSR City | 8.0 km | 31 Mar 2030 | 100% (1,957 of 1,961) | Locked |
|---|
| Projects within 4 km, counted | 1 | |
|---|---|---|
| Flats in them | 95 | |
| Booked | 37 of 95 (39%) | |
| Unsold | 58 | |
| Booked a month, pooled | 3 flats | |
| Months to sell, pooled | 17 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 19.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Local Panchyath) | |
| Nearest city water main | 12.5 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 8.1 km, Doddajala | |
| Kempegowda Airport | 12.1 |
| MG Road (CBD) | 31.0 |
| Manyata Tech Park | 23.3 |
| ITPL, Whitefield | 32.9 |
| Ecospace, Bellandur ORR | 37.3 |
| Electronic City Ph 1 | 46.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 970 m to the east |