| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | |
| 38 & BanyanCompleted · OC 30-03-2022 | ASSETZ BUILDWELL LLP | Apartment | 1,833 sqft carpet (as filed) | Completed |
| Ambaram HomesCompleted (regulator flag) | ARR DEVELOPERS | Apartment | 879 sqft carpet (as filed) | Completed |
| Amber MeadowsCompleted · OC 31-05-2024 | Excel Stone Developers | Apartment | – | Completed |
| Anuraag AmoghLapsed · completion date passed | ANURAAG CONSTRUCTIONS | Apartment | 736–949 sqft carpet (as filed) | Dec 2024 |
| Ashish A N Reddy ApartmentLapsed · completion date passed | AASHISH DEVELOPER AND BUILDERS | Apartment | 817 sqft carpet (as filed) | Sep 2023 |
| Atz ArevaLapsed · completion date passed | ATZ PROPERTIES | Apartment | 804–1,042 sqft carpet (as filed) | Jun 2026 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: STSK BUILDERS AND DEVELOPERS
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 8 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Review |
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| AuraActive · 9% built | BLUE SKY PROPERTIES | Apartment | 1,089 sqft carpet (as filed) | Apr 2030 |
| Blue Meadows Phase 2Active · 75% built | Yuva Infinity Developers | Apartment | 757–956 sqft carpet (as filed) | Dec 2027 |
8 of 61 other projects in Balagere, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Nature Elation in the interactive atlas
Transfer of the land
Sale deed
Survey 7/4
K-RERA filing, land schedule
Approval or registration
Land use converted
District Commissioner Bangalore Urban · Survey 7/4
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 7/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0132/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/100125/007376
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched part of the survey number | 5,758 sq m | |
| The whole survey number on the KGIS map | 37,687 sq m | |
| Extent the filed land schedule names for these survey numbers | 5,241 sq m | |
| Plot area against the filed extent | 1.1 times | |
| Land area filed with K-RERA | 5,210 sq m | |
| Village, hobli and taluk on the KGIS map | Varthur, Varturu-1 hobli, Bangalore-East taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 7/4 | |
|---|---|---|
| Land extent, Sy 7/4 | 1 Acre 11.8 Gunta | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 5,210 sq m | |
| Khata | A Khatha · BBMP · 19 Feb 2024 | |
| Sale deed | Dated 12 Jun 2023 | |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 7/4 | 2 | 1 acre 20 guntas | 1 acre 12 guntas | Differs: 8 guntas apart | 0 |
| Building plan (BBMP) | Sanctioned 23 Aug 2024 · No. BBMP/Addl.Dir/JDNORTH/0132/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2027 |
| Land conversion | Converted 1 Jan 2024 · District Commissioner Bangalore Urban | |
|---|---|---|
| Survey numbers | 7/4 |
3BHK · avg 75 m² 70.5%2BHK · avg 62 m² 29.5%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 33 | 664 |
| 3BHK | 79 | 813 |
| Poetry Of Earth | 510 m | Locked | |
|---|---|---|---|
| Inspira Infinity | about 1 km | Locked | |
| Adarsh Park Heights Phase-2 | about 1.5 km | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 1.5 km | Locked |
| Nature Elation This project | This project is the point the others are measured from | 31 Mar 2027 | Not filed | Not verified yet |
|---|---|---|---|---|
| Poetry Of Earth | 510 m | 31 Dec 2028 | 23% (65 of 282) | Locked |
| Inspira Infinity | about 1 km | 31 Jan 2029 | 95% (100 of 105) | Locked |
| Adarsh Park Heights Phase-2 |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 830 m, Varthur police station | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 30 m to the south-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 220 m to the east, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
| Kitchen handover | Not verified yet | |
|---|---|---|
| Covered parking per unit | 1.19 (133 covered spaces for 112 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not verified yet | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 1.9 km | Review |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Mar 2027 | |
| Work began, as filed | 23 Aug 2024 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Not verified yet | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹5.58 Cr 10.4%Development · ₹47.97 Cr 89.6%
| Estimated cost | ₹53.55 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Axis Bank · BHATTARAHALLI, BANGALORE | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Not verified yet | |
|---|---|---|
| Records searched to | Not verified yet | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 23 Aug 2024 |
|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| Sale deed in favour of | Not verified yet | |
|---|---|---|
| Escrow bank | Axis Bank · BHATTARAHALLI, BANGALORE |
|---|
Map of 7 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Poetry Of Earth, price locked; Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24, price locked; SOBHA Ayana, price locked; Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58, price locked; SOBHA Neopolis, price locked; Reflections 66, price locked; Adarsh Parkland, price locked.
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 1.5 km | Locked |
|---|
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 1.5 km | Locked |
|---|
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 1.5 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | 1.8 km | Locked |
|---|
| SOBHA Ayana | 1.9 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 2 km | Locked |
|---|
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | 1.9 km | Locked |
|---|
| Jeevan's Allure | about 2.5 km | Locked |
|---|
| about 1.5 km |
| 31 May 2027 |
| 95% (471 of 494) |
| Locked |
| Sobha Sentosa Phase 1 Wing 7 | about 1.5 km | 30 Jun 2026 | 100% (71 of 71) | Locked |
|---|
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 1.5 km | 31 Dec 2026 | 99% (140 of 142) | Locked |
|---|
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 1.5 km | 30 Jun 2027 | 99% (176 of 178) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹1,20,000 /mo · 6 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹60,000 /mo · 53 listings | |
| Rent, 2BHK, 3 km | ₹41,000 /mo · 113 listings | |
| Rent, 1BHK, 3 km | ₹19,000 /mo · 79 listings | |
| Rent per sq ft, 3 km | ₹37.4 /mo, as listed · 131 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 88 (39 with an approximate location) | |
|---|---|---|
| Flats in them | 30,197 | |
| Booked | 18,295 of 30,197 (61%) | |
| Unsold | 11,902 | |
| Booked a month, pooled | 506 flats | |
| Months to sell, pooled | 23 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 30 m to the south-west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 4.3 km, Nallur Halli | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 29.0 |
| MG Road (CBD) | 15.5 |
| Manyata Tech Park | 17.4 |
| ITPL, Whitefield | 5.1 |
| Ecospace, Bellandur ORR | 6.6 |
| Electronic City Ph 1 | 13.1 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.2 km to the west, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the north-east |