Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | 1 | – | 2 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
Part of the full report. Unlock all 4 sections
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 82 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Valuation |
|---|
| – |
| – |
| – |
| Locked |
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Adarsh Park Heights Phase-2 in the interactive atlas
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 23 Sep 2020 · No. BBMP/Addl.Dir/JDNORTH/0055/19-20 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/820/2018 | Clear |
| Environmental clearance | SEIAA 155 CON 2018 · issued 19 Jul 2019 | Clear |
| Airport height NOC | NOC ID BANG/SOUTH/B/122016/187349 · issued 4 Jan 2017 · permissible top elevation 962.6 m above mean sea level · validity ended 3 Jan 2022 | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 3 | |
| RERA completion date | 31 May 2027 |
| Land conversion | 15 of 15 parcels converted | |
|---|---|---|
| Sy 193/2 | Converted 20 Dec 2014 · Deputy Commissioner | |
| Sy 193/1 | Converted 18 Nov 2011 · Deputy Commissioner | |
| Sy 192/1 | Converted 12 Aug 2011 · Deputy Commissioner | |
| Sy 192/4 | Converted 30 Jan 2012 · Deputy Commissioner | |
| Sy 192/2A, 192/2A, 192/2B | Converted 23 Mar 2016 · Deputy Commissioner | |
| Sy 194 | Converted 14 Oct 2008 · Deputy Commissioner | |
| Other parcels | 5 more groups on the filing | |
| Survey numbers | 193/2 · 193/1 · 192/1 · 192/4 · 192/2A · 192/2A · 192/2B · 194 · 194 · 194 · 194 · 194 · 194 · 194 · 194 |
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Gunjur | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.10 (544 covered spaces for 494 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported itPossession date in the agreement

| Main structure | 78% · planned by 13 Feb 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 17 Feb 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 74% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 May 2027 | |
|---|---|---|
| Schedule end | 31 May 2027 | |
| RERA completion date | 31 May 2027 | |
| Work began, as filed | 1 Aug 2023 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: BLOCK G 75.3 m, BLOCK H 75.3 m, BLOCK J 75.3 m, BLOCK K 75.3 m, BLOCK L 75.3 m, BLOCK M 62.9 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 493.66 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/820/2018 | |
| Environmental clearance | SEIAA 155 CON 2018 · issued 19 Jul 2019 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 10 Jan 2026 · site inspected 5 Jan 2026 | |
| Engineer's certificate, registration | Dated 1 Jul 2023 | |
Land · ₹21.86 Cr 4.5%Development · ₹465.24 Cr 95.5%
| Estimated cost | ₹487.10 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹354.80 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (471) 95.3%Unsold (23) 4.7%
| Sold, Q3 2025-26 | 419 / 494 · 75 available | |
|---|---|---|
| Sold, Q4 2025-26 | 460 / 494 · 34 available | |
| Sold, Q1 2026-27 | 458 / 494 · 36 available | |
| Sold, Q2 2026-27 | 471 / 494 · 23 available | |
| Unsold, Q2 2026-27 | 23 | |
| Sold in Q4 2025-26 | 41 | |
| Sold in Q1 2026-27 | 2 bookings cancelled or corrected (460 → 458 sold) | |
| Sold in Q2 2026-27 | 13 |
| Escrow bank | RATNAKAR BANK · Residency Road, Bangalore | |
|---|---|---|
| Designated account, collected | ₹355.57 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹339.71 Cr in Q2 2026-27 (96% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 3 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 23 Sep 2020 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | RATNAKAR BANK · Residency Road, Bangalore | |

Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 4 km, Kodibeesanahalli | |
| Kempegowda Airport | 30 |
| MG Road (CBD) | 15 |
| Manyata Tech Park | 17.5 |
| ITPL, Whitefield | 6 |
| Ecospace, Bellandur ORR | 5.5 |
| Electronic City Ph 1 | 12 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km |