Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
Part of the full report. Unlock all 4 sections
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 74 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Valuation |
|---|
| – |
| – |
| – |
| Locked |
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jeevan's Allure in the interactive atlas
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (BBMP) | Sanctioned 11 Jul 2024 · No. BBMP/Ad.com/MDP/0092/24-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | SEIAA 51 CON 2024 · EC identification no. EC24C3801KA5776804N · issued 22 Aug 2024 | Clear |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Jul 2027 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 121/6, 121/9 | Converted 18 Aug 2023 · Deputy Commissioner, Bangalore District, Bangalore | |
| Sy 121/11 | Converted 21 Nov 2023 · Deputy Commissioner, Bangalore District, Bangalore | |
| Survey numbers | 121/6 · 121/9 · 121/11 |
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2 km, Varthur police station | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 10% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.15 (175 covered spaces for 152 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 100% · planned by 31 Jan 2026 | |
|---|---|---|
| Electrical and plumbing finishing | 10% · planned by 31 Jul 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 78% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Jul 2027 | |
| RERA completion date | 31 Jul 2027 | |
| Work began, as filed | 22 Jul 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.96 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 35 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Jul 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | SEIAA 51 CON 2024 · EC identification no. EC24C3801KA5776804N · issued 22 Aug 2024 | |
| Architect, quarterly | Form 5 · Feb 2026, Jul 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 22 Aug 2024 · site inspected 18 Aug 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹52.34 Cr 55.1%Development · ₹42.70 Cr 44.9%
| Estimated cost | ₹95.04 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹32.00 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹20.35 Cr | |
| Land cost revision | Not verified yet | |
Sold (49) 32.2%Unsold (103) 67.8%
| Sold, Q3 2025-26 | 29 / 152 · 123 available | |
|---|---|---|
| Sold, Q4 2025-26 | 39 / 152 · 113 available | |
| Sold, Q1 2026-27 | 42 / 152 · 110 available | |
| Sold, Q2 2026-27 | 49 / 152 · 103 available | |
| Unsold, Q2 2026-27 | 103 | |
| Sold in Q4 2025-26 | 10 | |
| Sold in Q1 2026-27 | 3 | |
| Sold in Q2 2026-27 | 7 |
| Escrow bank | HDFC · Whitefield Bangalore | |
|---|---|---|
| Designated account, collected | ₹4.51 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹4.51 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹8,77,20,016 | |
| Withdrawn from the escrow account to date | ₹18,60,09,976 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 11 Jul 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Whitefield Bangalore | |

Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 6.5 km, Kadugodi | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 30.5 |
| MG Road (CBD) | 18 |
| Manyata Tech Park | 20 |
| ITPL, Whitefield | 7 |
| Ecospace, Bellandur ORR | 9 |
| Electronic City Ph 1 | 13.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |