Overview
MVN Aero One T5 & T6
Part ofMVN Aero One3 phases, 350 flats
Overview
Part ofMVN Aero One3 phases, 350 flats
Overview
Part ofMVN Aero One3 phases, 350 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | ||||
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
| Aeropolis, A Project Of Sattva GroupLapsed · completion date passed | TRINAYANI REALTOR PRIVATE LIMITED |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: MF FARMLANDS PRIVATE LIMITED
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 56 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 5 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 5 filed survey numbers matched. The village name is shared by several villages; the one nearest the filed coordinate was used.
| – |
| 2 |
| – |
| Review |
| Construction & progress | – | 1 | 1 | Review |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Apartment |
| 280–635 sqft carpet (as filed) |
| Jul 2026 |
| Aira HillsApplied for completion 17/02/2026 | Vaarahi Developers Pvt Ltd | Plot | – | Dec 2024 |
| Ajmal Flora Valley Phase -IIApplied for completion 01/10/2024 | M/s. Ajmal Flora Valley | Plot | ~2,140 sqft (estimate: filed carpet plus 25%) | May 2017 |
8 of 252 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open MVN Aero One T5 & T6 in the interactive atlas
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| Survey 28 | ||||
| 28/1 | 30 Mar 2011Deputy Commissioner | 10 Jul 2017 | 4 Jul 2020A Khatha · PANCHAYATH | 53 Guntas |
| 28/4 | 16 Jan 2017Deputy Commissioner | 16 Mar 2018 | 4 Jul 2020A Khatha · Panchayath | 50.5 Guntas |
| Survey 29 | ||||
| 29/2 | 20 Feb 2023Deputy Commissioner | 8 Mar 2017 | 4 Apr 2020A Khatha · Panchayath | 13.5 Guntas |
| 29/3 | 20 Feb 2017Deputy Commissioner | 8 Mar 2017 | 4 Jul 2020A Khatha · Panchayath | 29 Guntas |
| 29/4 | 20 Feb 2017Deputy Commissioner | 8 Mar 2017 | 20 Jul 2020A Khatha · Panchayath | 29 Guntas |
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
Consideration ₹2.52 Cr · Sy 28/4; 28/2, Rayasandra village, Kasaba hobli
Title deed filed with K-RERA, pp. 1, 12, 15 · See it in Documents
Approval or registration
Building plan sanctioned
BMRDA · plan STRRPA/TP/CC/14/2020-21
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/141223/006472
K-RERA registration
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 19 Aug 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 2 of the survey sketch. Filed with K-RERA: VILLAGEMAP ZONEADLR SKETCH (2), 2 pages.
Satellite map with the 5 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 5 filed survey numbers matched. The village name is shared by several villages; the one nearest the filed coordinate was used.
| Survey numbers | 28/1, 28/4, 29/2, 29/3, 29/4 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 7,850 sq m | |
| Khata | A Khatha · PANCHAYATH · 4 Jul 2020; A Khatha · Panchayath · 4 Jul 2020; A Khatha · Panchayath · 4 Apr 2020; and 1 more | |
| Sale deed | Dated 8 Mar 2017, 10 Jul 2017, 16 Mar 2018 | |
| Sy. No. 28/1 | 2 | 1 acre 13 guntas | 1 acre 13 guntas | Yes | 0 | |
| Sy. No. 28/4 | 1 | 1 acre 11 guntas | 1 acre 10 guntas | Yes | 0 | |
| Sy. No. 29/2 | 1 | 14 guntas | 14 guntas | Differs: 3 guntas apart | 0 | |
| Sy. No. 29/3 | 1 | 29 guntas | 29 guntas | Differs: 4 guntas apart | 0 | |
| Sy. No. 29/4 | 1 | 29 guntas | 29 guntas | Differs: 5 guntas apart | 0 |
Valid as of this reportValidity ended
| Building plan (BMRDA) | Sanctioned 12 Nov 2020 · No. STRRPA/TP/CC/14/2020-21 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/164/2020 · issued 18 Sep 2020 | Clear |
| Environmental clearance | SEIAA 160 CON 2019 · issued 12 Feb 2020 | Clear |
| Airport height NOC | NOC ID BIAL/SOUTH/B/011018/273631 · issued 31 Jan 2018 · permissible top elevation 940.42 m above mean sea level · validity ended 30 Jan 2026 | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 20 Jul 2027 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 28/1 | Converted 30 Mar 2011 · Deputy Commissioner | |
| Sy 28/4 | Converted 16 Jan 2017 · Deputy Commissioner | |
| Sy 29/2 | Converted 20 Feb 2023 · Deputy Commissioner | |
| Sy 29/3, 29/4 | Converted 20 Feb 2017 · Deputy Commissioner | |
| Survey numbers | 28/1 · 28/4 · 29/2 · 29/3 · 29/4 |
| Due on signing | Not verified yet | |
|---|---|---|
| Due within 15 days | Not verified yet | |
| Each construction stage | Not verified yet | |
| Floors in payment plan | Not verified yet | |
| Late-payment interest | Not verified yet | |
| Interest the builder pays on late possession | Rate prescribed in the Rules | |
| Transfer fee | 5% of the price | |
|---|---|---|
| Holding charge | Not verified yet | |
| Maintenance included | Not verified yet | |
2 BHK REGULAR - TYPE01 (Tower - 6) · 67 m² 20.4%2BHK LARGE -TYPE 01 A (Tower-6) · 78 m² 20.4%2BHK LARGE -TYPE 02 (Tower-6) · 79 m² 20.4%2BHK-LARGE -TYPE 01 B (Tower-5) · 77 m² 10.2%3 other types 28.5%
| 1 BHK (Tower-5) | 13 | 441 |
| 2 BHK REGULAR - TYPE01 (Tower - 6) | 28 | 721 |
| 2BHK LARGE -TYPE 01 A (Tower-6) | 28 | 840 |
| 2BHK LARGE -TYPE 02 (Tower-6) | 28 | 850 |
| 2BHK-LARGE -TYPE 01 B (Tower-5) | 14 | 829 |
| 2BHK-LARGE -TYPE 03 B EAST (Tower-5) | 13 | 797 |
| 2BHK-LARGE -TYPE 03 B WEST (Tower-5) | 13 | 829 |
| Sold, Q1 2026-27 | 107 / 137 | |
|---|---|---|
| Unsold, Q1 2026-27 | 30 | |
| Months to sell, derived from filed bookings | Too few bookings to project (2 flats booked in 6 months) |
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 4.5 km | Locked | |
|---|---|---|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 4.5 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 4.5 km | Locked | |
| Aeropolis, A Project Of Sattva Group | about 5 km | Locked |
| MVN Aero One T5 & T6 This project | This project is the point the others are measured from | 20 Jul 2027 | 78% (107 of 137) | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 4.5 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 4.5 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 18.1 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 1.0 km to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 110 m to the south-east, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 90% | |
| Electricity, built | 20% | |
| Outdoor Sports facility, built | 100% | |
| Swimming Pool, built | 100% | |
| Parks, built | 50% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.68 (93 covered spaces for 137 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported itPossession date in the agreement

| Main structure | 77% · planned by 21 Apr 2025 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 8 Sep 2026 | |
| Internal roads | Not verified yet | |
| Club house | 90% | |
| Completion | 95% | |
| Completion, accountant | 95.6% of the estimated cost spent | |
Builder's schedule runs about 7 months past the promised possession date.
| Possession, agreement | 20 Dec 2026 | |
|---|---|---|
| Schedule end | 20 Jul 2027 | |
| RERA completion date | 20 Jul 2027 | |
| Grace period for possession | 6 months | |
| Work began, as filed | 1 Oct 2023 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 49.95 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 99.34 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · May 2026, May 2026, Jul 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/164/2020 · issued 18 Sep 2020 | |
| Environmental clearance | SEIAA 160 CON 2019 · issued 12 Feb 2020 | |
| Architect, quarterly | Form 5 · May 2026, May 2026, Jul 2026 (3 filed) | |
| Architect's certificate, registration | Dated 25 Oct 2023 | |
| Engineer's certificate, registration | Dated 18 Oct 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹4.79 Cr 7.4%Development · ₹59.94 Cr 92.6%
| Estimated cost | ₹64.73 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹45.50 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹71.62 Cr | |
| Cost incurred | ₹68.47 Cr (95.6% of the estimate) | |
| Cost left | ₹3.15 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹32.08 Cr | |
| Land cost revision | Not verified yet | |
Sold (107) 78.1%Unsold (30) 21.9%
| Sold, Q3 2025-26 | 105 / 137 · 32 available | |
|---|---|---|
| Sold, Q4 2025-26 | 107 / 137 · 30 available | |
| Sold, Q1 2026-27 | 107 / 137 · 30 available | |
| Unsold, Q1 2026-27 | 30 | |
| Sold in Q4 2025-26 | 2 | |
| Sold in Q1 2026-27 | 0 | |
| Flats booked, Form 4 Q4 2025-26 | 107 |
| Escrow bank | HDFC · DEVANAHALLI | |
|---|---|---|
| Designated account, collected | ₹4.79 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹37.08 Cr in Q1 2026-27 | |
| Share of collections deposited in escrow | 70% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 19 Aug 2023 | Review |
| Building plan (BMRDA) | Sanctioned 12 Nov 2020 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · DEVANAHALLI | |

| Varnam Phase 1c | about 6.5 km | Locked |
|---|
| Birla Trimaya | about 6.5 km | Locked |
|---|
| Birla Trimaya Phase-3 | 6.6 km | Locked |
|---|
| Sattva Vasanta Cove | 6.7 km | Locked |
|---|
| Birla Trimaya Phase-2 | about 7 km | Locked |
|---|
| Sattva Vasanta Skye | 6.9 km | Locked |
|---|
| Ekta Elements | 7.0 km | Locked |
|---|
| Barca II At Godrej Msr City | about 7.5 km | Locked |
|---|
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 4.5 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 5 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
| Varnam Phase 1c | about 6.5 km | 31 Mar 2031 | 92% (275 of 298) | Locked |
|---|
| Birla Trimaya | about 6.5 km | 15 Dec 2031 | 90% (494 of 548) | Locked |
|---|
| Rent, 2BHK, 3 km | ₹24,500 /mo · 6 listings | |
|---|---|---|
| Rent per sq ft, 3 km | ₹21.5 /mo, as listed · 6 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 9 (2 with an approximate location) | |
|---|---|---|
| Flats in them | 2,688 | |
| Booked | 2,017 of 2,688 (75%) | |
| Unsold | 671 | |
| Booked a month, pooled | 45 flats | |
| Months to sell, pooled | 15 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 19.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Panchayath) | |
| Nearest city water main | 13.8 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 1.0 km to the south, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 2.9 km, KIA Terminal | |
| Kempegowda Airport | 3.0 |
| MG Road (CBD) | 30.3 |
| Manyata Tech Park | 22.5 |
| ITPL, Whitefield | 26.4 |
| Ecospace, Bellandur ORR | 33.3 |
| Electronic City Ph 1 | 42.9 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.6 km to the south-east | |
| Quarry | 2.4 km to the north-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.5 km to the south-west |