Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Airport CityLapsed · completion date passed | Srinivasa M | Plot | – | Dec 2021 |
| Arvind GreatlandsApplied for completion 16/12/2024 | Arvind SmartSpaces | Plot | 1,200–2,400 sqft | – |
| Assetz City Of PalmsActive · 86% built | ASSETZ INVESTMENTS AND HOLDINGS PRIVATE LIMITED | Plot | ~1,200–2,020 sqft (estimate: filed carpet plus 25%) | Feb 2029 |
| Atmos SilverwoodsExtended to 31-05-2027 | ATMOS CONSTRUCTIONS PRIVATE LIMITED | Villa | 2,333 sqft carpet (as filed) | May 2027 |
| Canterburry MeadowsApplied for completion 10/05/2024 | ARUNAPANCHAMI ESTATES PRIVATE LIMITED | Plot | ~1,280 sqft (estimate: filed carpet plus 25%) | Mar 2020 |
| Canterbury HillviewApplied for completion 23/01/2023 | SLNS AVYUKTHA HOMES | Plot | – | Jul 2021 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 18 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | 1 | – | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Century GreensApplied for completion 12/07/2022 | Century Star | Plot | – | Dec 2021 |
| Century Greens Phase 2Applied for completion 07/04/2022 | CENTURY STAR | Plot | ~1,160–2,400 sqft (estimate: filed carpet plus 25%) | Dec 2021 |
8 of 32 other projects in Doddaballapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mangodew in the interactive atlas
Approval or registration
Land use converted
DC, Bangalore Rural · Survey 22, 24/1
K-RERA filing, land schedule
Approval or registration
Land use converted
DC, Bangalore Rural · Survey 22, 24/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BIAPPA · plan 54/2021-22
K-RERA filing, approvals
Approval or registration
Khata issued
A Khatha · Dyvanahalli Panchayath · Survey 24/1
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Dyvanahalli Panchayath · Survey 22
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/160123/005623
K-RERA registration
Approval or registrationThe parcels join the project
Described in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Page 1
Page 1 of 18 of the survey sketch. Filed with K-RERA: Aakarband Hissapodi sy sketch, 18 pages, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 22, 24/1 | |
|---|---|---|
| Land extent, Sy 22 | 2 Acre 19 Gunta | |
| Land extent, Sy 24/1 | 1 Acre | |
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · Dyvanahalli Panchayath · 14 Nov 2022; A Khatha · Dyvanahalli Panchayath · 14 Nov 2022 | |
| Building plan (BIAPPA) | Sanctioned 3 Mar 2022 · No. 54/2021-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 24 Dec 2024 |
| Land conversion | Converted 19 Nov 2021 · DC, Bangalore Rural | |
|---|---|---|
| Survey numbers | 22 · 24/1 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 6 km | Locked | |
|---|---|---|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 6 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 6 km | Locked | |
| Sattva Vasanta Skye | about 6.5 km | Locked |
| Mangodew This project | This project is the point the others are measured from | 24 Dec 2024 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 6 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 6 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 17 km, Kondappa layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 19.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Devanahalli Panchayath) | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 24 Dec 2024 | Review |
| Work began, as filed | 1 Aug 2022 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹2.20 Cr 40.3%Development · ₹3.27 Cr 59.7%
| Estimated cost | ₹5.46 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹2.78 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · HSR Layout | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BIAPPA) | Sanctioned 3 Mar 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · HSR Layout | |
| Sattva Vasanta Cove | about 6.5 km | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 7 km | Locked |
|---|
| Godrej MSR City | about 7.5 km | Locked |
|---|
| Barca II At Godrej Msr City | about 7.5 km | Locked |
|---|
| Sattva City | about 8 km | Locked |
|---|
| Ekta Elements | about 8.5 km | Locked |
|---|
| Varnam Phase 1c | about 8.5 km | Locked |
|---|
| Birla Trimaya Phase-3 | about 8.5 km | Locked |
|---|
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 6 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
|---|
| Sattva Vasanta Skye | about 6.5 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
|---|
| Sattva Vasanta Cove | about 6.5 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 7 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
| Projects within 4 km, counted | 1 (1 with an approximate location) | |
|---|---|---|
| Flats in them | 95 | |
| Booked | 37 of 95 (39%) | |
| Unsold | 58 | |
| Booked a month, pooled | 3 flats | |
| Months to sell, pooled | 17 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 8 km, Doddajala | |
| Kempegowda Airport | 10.5 |
| MG Road (CBD) | 31.5 |
| Manyata Tech Park | 23.5 |
| ITPL, Whitefield | 32.5 |
| Ecospace, Bellandur ORR | 37.5 |
| Electronic City Ph 1 | 47 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1 km |
|---|