Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | 1 | – | – | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 38 & BanyanCompleted · OC 30-03-2022 | ASSETZ BUILDWELL LLP | Apartment | 1,833 sqft carpet (as filed) | Completed |
| Ambaram HomesCompleted (regulator flag) | ARR DEVELOPERS | Apartment | 879 sqft carpet (as filed) | Completed |
| Amber MeadowsCompleted · OC 31-05-2024 | Excel Stone Developers | Apartment | – | Completed |
| Anuraag AmoghLapsed · completion date passed | ANURAAG CONSTRUCTIONS | Apartment | 736–949 sqft carpet (as filed) | Dec 2024 |
| Ashish A N Reddy ApartmentLapsed · completion date passed | AASHISH DEVELOPER AND BUILDERS | Apartment | 817 sqft carpet (as filed) | Sep 2023 |
| Atz ArevaLapsed · completion date passed | ATZ PROPERTIES | Apartment | 804–1,042 sqft carpet (as filed) | Jun 2026 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 9 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| AuraActive · 9% built | BLUE SKY PROPERTIES | Apartment | 1,089 sqft carpet (as filed) | Apr 2030 |
| Blue Meadows Phase 2Active · 75% built | Yuva Infinity Developers | Apartment | 757–956 sqft carpet (as filed) | Dec 2027 |
8 of 61 other projects in Balagere, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Maitree Sprint in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner of the district (Revenue Department) · Survey 73
K-RERA filing, land schedule
Transfer of the land
Title deed executed
19 Guntas
Title deed filed with K-RERA, pp. 1, 37 · See it in Documents
Approval or registration
Khata issued
A Khatha · BBMP · Survey 73
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com./MDP/0339/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/010722/005029
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 3519/36/4,73 | |
|---|---|---|
| Land extent, Sy 3519/36/4,73 | 19 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,922 sq m | |
| Khata | A Khatha · BBMP · 15 Sep 2021 | |
| Joint development agreement number | 501 of Book 1, 2021-22 | |
|---|---|---|
| Landowner share | Not verified yet | |
| Developer share | Not verified yet | |
| Sale deed signed by | Not verified yet | |
| Building plan (BBMP) | Sanctioned 7 Jan 2022 · No. BBMP/Ad.Com./MDP/0339/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 10 Dec 2021 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 29 Feb 2024 |
| Land conversion | Converted 24 Aug 2021 · Deputy Commissioner of the district (Revenue Department) | |
|---|---|---|
| Survey numbers | 3519/36/4,73 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Residential Flats · avg 72 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Residential Flats | 40 | 779 |
| Sobha Sentosa Phase 1 Wing 7 | about 0.5 km | Locked | |
|---|---|---|---|
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 0.5 km | Locked | |
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 0.5 km | Locked | |
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 0.5 km | Locked |
| Maitree Sprint This project | This project is the point the others are measured from | 29 Feb 2024 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sobha Sentosa Phase 1 Wing 7 | about 0.5 km | 30 Jun 2026 | 100% (71 of 71) | Locked |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 0.5 km | 31 Dec 2026 | 99% (140 of 142) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Balagere | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.97 (39 covered spaces for 40 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Dec 2023 | |
|---|---|---|
| Schedule end | 1 Dec 2023 | |
| RERA completion date | 29 Feb 2024 | Red flag |
| Grace period for possession | 6 months | |
| Work began, as filed | 1 Mar 2022 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 11.48 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 10 sq m | |
| Sewage plant | Not verified yet | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹6.50 Cr 44.3%Development · ₹8.17 Cr 55.7%
| Estimated cost | ₹14.67 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Axis Bank · Gunjur Main Road Branch | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 7 Jan 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Gunjur Main Road Branch | |
| SOBHA Ayana | about 0.5 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 0.5 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 0.5 km | Locked |
|---|
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | about 0.5 km | Locked |
|---|
| Adarsh Park Heights Phase-2 | about 0.5 km | Locked |
|---|
| SOBHA Neopolis | about 1.5 km | Locked |
|---|
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 1.5 km | Locked |
|---|
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 1.5 km | Locked |
|---|
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 0.5 km | 30 Jun 2027 | 99% (176 of 178) | Locked |
|---|
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 0.5 km | 31 Dec 2027 | 100% (142 of 142) | Locked |
|---|
| SOBHA Ayana | about 0.5 km | 31 Dec 2031 | 62% (426 of 683) | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 0.5 km | 30 Mar 2026 | 100% (237 of 237) | Locked |
|---|
| Projects within 4 km, counted | 80 (80 with an approximate location) | |
|---|---|---|
| Flats in them | 29,454 | |
| Booked | 17,602 of 29,454 (60%) | |
| Unsold | 11,852 | |
| Booked a month, pooled | 498 flats | |
| Months to sell, pooled | 24 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 3.5 km, Kodibeesanahalli | |
| Kempegowda Airport | 29.5 |
| MG Road (CBD) | 14.5 |
| Manyata Tech Park | 17 |
| ITPL, Whitefield | 6 |
| Ecospace, Bellandur ORR | 5 |
| Electronic City Ph 1 | 12 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Sobha Dream Acres Substation on OpenStreetMap |