Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| Ambha Bhavani ResidencyActive · 100% built | SHREE JNANAKSHI BUILDERS AND DEVELOPERS | Apartment | 767 sqft carpet (as filed) | Dec 2027 |
| Ambhavilas ResidencyCompleted · OC 19-10-2023 | SHREE JNANAKSHI BUILDERS AND DEVELOPERS | Apartment | 957 sqft carpet (as filed) | Completed |
| Architha AarnaCompleted (regulator flag) | ARCHITHA VENTURES LLP | Apartment | 888–1,123 sqft carpet (as filed) | Completed |
| Architha Bg EnclaveLapsed · completion date passed | ARCHITHA BUILDERS | Plot | – | Nov 2023 |
| Ars Green Villae RaspberryLapsed · completion date passed | ARS Properties | Apartment | 390–743 sqft carpet (as filed) | Jul 2021 |
| Aryan OpulenceLapsed · completion date passed | Aryan Constructions | Apartment | 960–1,119 sqft carpet (as filed) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 64 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Jul 2021 |
| Balaji SheltersCompleted · OC 25-07-2019 | SRI BALAJI DEVELOPERS | Apartment | 844 sqft carpet (as filed) | Completed |
| Bavisha GreenwoodsLapsed · completion date passed | Bhavisha Properties | Apartment | 614–643 sqft carpet (as filed) | Mar 2022 |
8 of 56 other projects in RR Nagar, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Kumaravana in the interactive atlas
Approval or registration
Land use converted
DC Office Bengaluru · Survey 386/9 /1
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 386/9 /1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDSouth/0004/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/311024/007197
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 21 May 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 386/9 /1 | |
|---|---|---|
| Land extent, Sy 386/9 /1 | 5,937 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 5,935 sq m | |
| Khata | A Khatha · BBMP · 11 Jan 2023 | |
| Building plan (BBMP) | Sanctioned 16 Dec 2023 · No. BBMP/Addl.Dir/JDSouth/0004/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2027 |
| Land conversion | Converted 25 Feb 2003 · DC Office Bengaluru | |
|---|---|---|
| Survey numbers | 386/9 /1 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 102 m² 92.3%4BHK 5.5%2BHK · 77 m² 1.1%2.5BHK · 95 m² 1.1%
| 2.5BHK | 1 | 1,023 |
| 2BHK | 1 | 829 |
| 3BHK | 84 | 92,440 |
| 4BHK | 5 | 6,631 |
| Sold, Q2 2026-27 | 43 / 91 | |
|---|---|---|
| Unsold, Q2 2026-27 | 48 | |
| Months to sell, derived from filed bookings | 21 months |
| Samaya Sunshine | about 1 km | Locked | |
|---|---|---|---|
| Sumadhura Pramoda | about 2.5 km | Locked | |
| Sobha Royal Crest | about 3 km | Locked | |
| Garden Square | about 3.5 km | Locked | |
| Song Of Wind | about 4.5 km | Locked |
| Kumaravana This project | This project is the point the others are measured from | 31 Dec 2027 | 47% (43 of 91) | Not verified yet |
|---|---|---|---|---|
| Samaya Sunshine | about 1 km | 31 Dec 2026 | 33% (8 of 24) | Locked |
| Sumadhura Pramoda | about 2.5 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
| Sobha Royal Crest |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, BEML layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 25% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 25% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.21 (110 covered spaces for 91 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | 80% · planned by 30 Sep 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 15% · planned by 31 Oct 2027 | |
| Internal roads | Not verified yet | |
| Club house | 25% | |
| Completion | 58% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Dec 2027 | |
|---|---|---|
| Schedule end | 31 Dec 2027 | |
| RERA completion date | 31 Dec 2027 | |
| Completion date, agreement | 31 Oct 2027 | |
| Work began, as filed | 3 Apr 2024 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.98 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 24 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Chartered accountant's certificate, registration | Dated 19 Aug 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹31.53 Cr 26.3%Development · ₹88.17 Cr 73.7%
| Estimated cost | ₹119.70 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q4 2025-26 | ₹91.80 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (43) 47.3%Unsold (48) 52.7%
| Sold, Q3 2025-26 | 22 / 91 · 69 available | |
|---|---|---|
| Sold, Q4 2025-26 | 34 / 91 · 57 available | |
| Sold, Q1 2026-27 | 39 / 91 · 52 available | |
| Sold, Q2 2026-27 | 43 / 91 · 48 available | |
| Unsold, Q2 2026-27 | 48 | |
| Sold in Q4 2025-26 | 12 | |
| Sold in Q1 2026-27 | 5 | |
| Sold in Q2 2026-27 | 4 |
| Escrow bank | INDUSIND BANK · M G Road | |
|---|---|---|
| Designated account, collected | ₹12.38 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹8.67 Cr in Q2 2026-27 (70% of that quarter's deposits) | |
| Escrow account, Q4 2025-26 | ₹7.0 L withdrawn | |
| Escrow account to date, Q4 2025-26 | ₹1.04 Cr deposited from sales, ₹60.2 L withdrawn | |
| Escrow account to date, Q3 2025-26 | Balance ₹1.57 Cr | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 7 | |
|---|---|---|
| Marked completed | 3 | |
| Past promised date, not completed | 0 | Clear |
| Complaints filed against the promoter | 0 | |
| Other phases under this promoter name | 5 | |
| With a filed extension or completion | 3 (3 completed, 0 extended) | |
| Average schedule slip | 3 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 21 May 2024 | Review |
| Building plan (BBMP) | Sanctioned 16 Dec 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | INDUSIND BANK · M G Road | |

| Good Earth Ochre | about 5 km | Locked |
|---|
| Srivara Vasudha | about 5.5 km | Locked |
|---|
| Jhanavi Trishul Alaska | about 5.5 km | Locked |
|---|
| Adarsh Premia | about 6 km | Locked |
|---|
| Good Earth Cadence | about 6 km | Locked |
|---|
| Sattva Forest Ridge | about 7.5 km | Locked |
|---|
| Platinum Landmark | about 8.5 km | Locked |
|---|
| about 3 km |
| 31 Dec 2028 |
| 100% (329 of 329) |
| Locked |
| Garden Square | about 3.5 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
|---|
| Song Of Wind | about 4.5 km | 28 Feb 2026 | 63% (10 of 16) | Locked |
|---|
| Good Earth Ochre | about 5 km | 31 Oct 2027 | 92% (35 of 38) | Locked |
|---|
| Projects within 4 km, counted | 19 (19 with an approximate location) | |
|---|---|---|
| Flats in them | 3,575 | |
| Booked | 2,426 of 3,575 (68%) | |
| Unsold | 1,149 | |
| Booked a month, pooled | 48 flats | |
| Months to sell, pooled | 24 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 2 km, Pattanagere | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 38.5 |
| MG Road (CBD) | 12.5 |
| Manyata Tech Park | 19.5 |
| ITPL, Whitefield | 26 |
| Ecospace, Bellandur ORR | 18.5 |
| Electronic City Ph 1 | 19.5 |
| Landfill or waste transfer station | about 2 km | |
|---|---|---|
| Sewage treatment plant | about 2 km, named Mailasandra Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |