Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) | Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Akkshara CountyApplied for completion 24/06/2022 | G KRISHNA KUMAR | Plot | – | Jul 2021 |
| Alur Phase 2Lapsed · completion date passed | Bangalore Development Authority | Apartment | 1,781 sqft carpet (as filed) | Mar 2018 |
| Arine Golden BellsLapsed · completion date passed | M/s.Arine Structures | Mixed development |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 40 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| – |
| Apr 2022 |
| Artemis Address (In Association With Mythreyi)Applied for completion 31/12/2025 | INDIABUILD REAL ESTATES PVT LTD | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
| Artemis Address Phase 2Active · 95% built | Address Maker | Plot | 1,200–1,500 sqft | Dec 2027 |
8 of 72 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Kumar Platina in the interactive atlas
Transfer of the land
Sale deed
Survey 99
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 100
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office Bengaluru · Survey 99
K-RERA filing, land schedule
Approval or registration
Land use converted
DC office Bengaluru · Survey 100
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 99, 100
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 99, 100
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0066/24-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/080426/008577
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 2 Dec 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of the survey sketch. Filed with K-RERA: ADLR Survey Sketch Certified by ADLR.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 99, 100 | |
|---|---|---|
| Land extent, Sy 99 | 1 Acre 33.06 Guntas | |
| Land extent, Sy 100 | 1 Acre, 33.06 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 7,378 sq m | |
| Khata | E Khatha · BBMP · 9 Jan 2025 | |
| Sale deed | Dated 27 Feb 2004, 27 Feb 2024 | |
| Building plan (BBMP) | Sanctioned 8 Dec 2025 · No. BBMP/Addl.Dir/JDNORTH/0066/24-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2031 |
| Land conversion | Converted 8 May 2024 · DC Office Bengaluru | |
|---|---|---|
| Survey numbers | 99 · 100 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK · avg 102 m² 51.1%2.5BHK · avg 90 m² 48.9%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2.5BHK | 90 | 965 |
| 3BHK | 94 | 1,099 |
| Sold, Q2 2026-27 | 54 / 184 | |
|---|---|---|
| Unsold, Q2 2026-27 | 130 | |
| Months to sell, derived from filed bookings | 18 months |
| Vruksha Greens | about 2 km | Locked | |
|---|---|---|---|
| Royal Enclave | about 3 km | Locked | |
| Rubby Castle 1 | about 6.5 km | Locked | |
| Sri Rama Enclave | about 7.5 km | Locked | |
| Birla Tisya | about 8 km | Locked |
| Kumar Platina This project | This project is the point the others are measured from | 31 Mar 2031 | 29% (54 of 184) | Not verified yet |
|---|---|---|---|---|
| Vruksha Greens | about 2 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Royal Enclave | about 3 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
| Rubby Castle 1 | about 6.5 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Gundappa Layout & Belmar Layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Community Hall, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.46 (269 covered spaces for 184 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported it
| Main structure | Not started · planned by 12 Sep 2029 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 25 May 2030 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 9% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 21 Dec 2030 | |
| RERA completion date | 31 Mar 2031 | |
| Work began, as filed | 16 Mar 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: Block A (Wing B) 73.65 m, Block A( Wing A) 70.6 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 23.24 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Chartered accountant, Form 4 | Dated 8 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹16.54 Cr 11.6%Development · ₹126.21 Cr 88.4%
| Estimated cost | ₹142.75 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (54) 29.3%Unsold (130) 70.7%
| Sold, Q1 2026-27 | 32 / 184 · 152 available | |
|---|---|---|
| Sold, Q2 2026-27 | 54 / 184 · 130 available | |
| Unsold, Q2 2026-27 | 130 | |
| Sold in Q2 2026-27 | 22 | |
| Flats booked, Form 4 Q1 2026-27 | 32 |
| Escrow bank | HDFC · RACE COURSE ROAD, BANGALORE | |
|---|---|---|
| Designated account, collected | ₹7.80 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.46 Cr in Q2 2026-27 (70% of that quarter's deposits) | |
| Share of collections deposited in escrow | 70% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 2 Dec 2024 | |
| Building plan (BBMP) | Sanctioned 8 Dec 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · RACE COURSE ROAD, BANGALORE | |
| Renaissance Srichakra | about 8 km | Locked |
|---|
| Vista Padmalaya | about 8 km | Locked |
|---|
| Shriram Solitaire | about 8.5 km | Locked |
|---|
| Century Kindle Phase 1 | about 10 km | Locked |
|---|
| Assetz Soho & Sky | about 11 km | Locked |
|---|
| Magnolia Delight | about 11 km | Locked |
|---|
| Cumins Sanctum | about 11.5 km | Locked |
|---|
| 30 Apr 2029 |
| 25% (8 of 32) |
| Locked |
| Sri Rama Enclave | about 7.5 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
|---|
| Birla Tisya | about 8 km | 31 Dec 2026 | 100% (392 of 392) | Locked |
|---|
| Renaissance Srichakra | about 8 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
|---|
| Projects within 4 km, counted | 7 (7 with an approximate location) | |
|---|---|---|
| Flats in them | 2,065 | |
| Booked | 1,716 of 2,065 (83%) | |
| Unsold | 349 | |
| Booked a month, pooled | 37 flats | |
| Months to sell, pooled | 10 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 0.5 km, Nagasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 28 |
| MG Road (CBD) | 13 |
| Manyata Tech Park | 12.5 |
| ITPL, Whitefield | 26 |
| Ecospace, Bellandur ORR | 23.5 |
| Electronic City Ph 1 | 29.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Nagasandra on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |