Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
| Aeropolis, A Project Of Sattva GroupLapsed · completion date passed | TRINAYANI REALTOR PRIVATE LIMITED |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 11 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Apartment |
| 280–635 sqft carpet (as filed) |
| Jul 2026 |
| Aira HillsApplied for completion 17/02/2026 | Vaarahi Developers Pvt Ltd | Plot | – | Dec 2024 |
| Ajmal Flora Valley Phase -IIApplied for completion 01/10/2024 | M/s. Ajmal Flora Valley | Plot | ~2,140 sqft (estimate: filed carpet plus 25%) | May 2017 |
8 of 252 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ecl Petals in the interactive atlas
Covers 91/1 only
Approval or registration
Land use converted
342817 · Survey 91/1
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bangalore Rural · Survey 89/1, 89/2, 89/3, 89/4 and 1 more
K-RERA filing, land schedule
Covers 91/2 only
Approval or registration
Land use converted
DC Bangalore Rural · Survey 89/1, 89/2, 89/3, 89/4 and 1 more
K-RERA filing, land schedule
Covers 89/2 only
Approval or registration
Khata issued
E Khatha · TMC Devanahalli · Survey 89/2
K-RERA filing, land schedule
Covers 89/1, 89/3, 89/4 only
Approval or registration
Khata issued
E Khatha · TMC Devanahalli · Survey 89/1, 91/1, 89/3, 89/4 and 1 more
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · TMC Devanahalli · Survey 89/1, 91/1, 89/3, 89/4 and 1 more
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BIAPPA · plan BIAAPA/TP/LAO/14/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/290423/005902
K-RERA registration
Title checkTransfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 24 Apr 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 14,640 sq m | |
| Extent the filed land schedule names for these survey numbers | 12,646 sq m | |
| Plot area against the filed extent | 1.16 times | |
| Village, hobli and taluk on the KGIS map | Akkupete, Kasaba hobli, Devanahalli taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 89-1, 89-2, 91-1, 89-3, 89-4, 91-2 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · TMC Devanahalli · 2 Aug 2022; E Khatha · TMC Devanahalli · 6 Jun 2022 | |
| Sy. No. 89/1 | Not read yet | 0 | ||||
| Sy. No. 89/2 | Not read yet | 0 | ||||
| Sy. No. 89/3 | Not read yet | 0 | ||||
| Sy. No. 89/4 | Not read yet | 0 | ||||
| Sy. No. 91/1 | Not read yet | 0 | ||||
| Sy. No. 91/2 | Not read yet | 0 |
| Building plan (BIAPPA) | Sanctioned 3 Nov 2022 · No. BIAAPA/TP/LAO/14/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Not verified yet | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2024 |
| Land conversion | 6 of 6 parcels converted | |
|---|---|---|
| Sy 89-1, 89-2, 89-3, 89-4, 91-2 | Converted 6 Jun 2022 · DC Bangalore Rural | |
| Sy 91-1 | Converted 6 Jun 2022 · 342817 | |
| Survey numbers | 89-1 · 89-2 · 91-1 · 89-3 · 89-4 · 91-2 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 3 km | Locked | |
|---|---|---|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 3 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 3 km | Locked | |
| Aeropolis, A Project Of Sattva Group | about 4.5 km | Locked |
| Ecl Petals This project | This project is the point the others are measured from | 31 Dec 2024 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 3 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 3 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 18.5 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 19.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Dec 2024 | Red flag |
| Work began, as filed | 10 Feb 2023 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Chartered accountant's certificate, registration | Dated 8 Feb 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹2.78 Cr 53.4%Development · ₹2.43 Cr 46.6%
| Estimated cost | ₹5.20 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹2.30 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Bank of Baroda · Personal Banking Branch | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 24 Apr 2022 | Review |
| Building plan (BIAPPA) | Sanctioned 3 Nov 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Bank of Baroda · Personal Banking Branch | |
| Sattva Vasanta Cove | about 6 km | Locked |
|---|
| Sattva Vasanta Skye | about 6 km | Locked |
|---|
| Varnam Phase 1c | about 6.5 km | Locked |
|---|
| Birla Trimaya Phase-3 | about 6.5 km | Locked |
|---|
| Birla Trimaya | about 6.5 km | Locked |
|---|
| Birla Trimaya Phase-2 | about 7 km | Locked |
|---|
| Ekta Elements | about 7 km | Locked |
|---|
| Godrej MSR City | about 7 km | Locked |
|---|
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 3 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 4.5 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
| Sattva Vasanta Cove | about 6 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
|---|
| Sattva Vasanta Skye | about 6 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
|---|
| Projects within 4 km, counted | 14 (14 with an approximate location) | |
|---|---|---|
| Flats in them | 2,934 | |
| Booked | 2,207 of 2,934 (75%) | |
| Unsold | 727 | |
| Booked a month, pooled | 46 flats | |
| Months to sell, pooled | 16 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 4.5 km, KIA Terminal | |
| Kempegowda Airport | 4 |
| MG Road (CBD) | 31 |
| Manyata Tech Park | 23.5 |
| ITPL, Whitefield | 28 |
| Ecospace, Bellandur ORR | 34.5 |
| Electronic City Ph 1 | 44.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 2 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the south |