Overview
Earthsong by Manyata Phase-4b
Part ofEarthsong by Manyata7 phases
Overview
Part ofEarthsong by Manyata7 phases
Overview
Part ofEarthsong by Manyata7 phases
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
| Aeropolis, A Project Of Sattva GroupLapsed · completion date passed | TRINAYANI REALTOR PRIVATE LIMITED |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted |
|---|
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 20 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 1 | 1 | Review |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Apartment |
| 280–635 sqft carpet (as filed) |
| Jul 2026 |
| Aira HillsApplied for completion 17/02/2026 | Vaarahi Developers Pvt Ltd | Plot | – | Dec 2024 |
| Ajmal Flora Valley Phase -IIApplied for completion 01/10/2024 | M/s. Ajmal Flora Valley | Plot | ~2,140 sqft (estimate: filed carpet plus 25%) | May 2017 |
8 of 252 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Earthsong by Manyata Phase-4b in the interactive atlas
| Sale deed |
|---|
| Khata |
|---|
| Extent |
|---|
| Survey 41 | ||||
|---|---|---|---|---|
| 41/1 | 6 Feb 2018DC Bengaluru | 14 Nov 2022in favour of M/s Manyata Developers Pvt. Ltd. | 14 Feb 2023E Khatha · 0 | 1 Acre |
| 41/2 | 8 Jun 2022DC Bengaluru | 24 Feb 2022in favour of M/s Manyata Developers Pvt. Ltd. | 14 Feb 2023E Khatha · 0 | 3 Acre 31 Guntas |
| Survey 194 | ||||
|---|---|---|---|---|
| 194/1, 194/2 | 26 May 2022DC Bengaluru | 15 Feb 2022in favour of M/s Manyata Developers Pvt. Ltd | 14 Feb 2023E Khatha · 0 | 1 Acre + 1 Acre |
| 194/3 | 5 Jul 2022DC Bengaluru | 11 Jan 2023in favour of M/s Manyata Developers Pvt. Ltd | 14 Feb 2023E Khatha · 0 | 1 Acre |
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
No. DNH-1-11022-2021-22 · Book 1 · Consideration ₹1.25 Cr
Title deed filed with K-RERA, pp. 1, 7, 10 · See it in Documents
Transfer of the land
Title deed registered
No. DNH-1-11025-2021-22 · Book 1 · executed 11 Feb 2022 · Consideration ₹1.25 Cr
Title deed filed with K-RERA, pp. 1, 7, 10 · See it in Documents
Transfer of the land
Title deed executed
No. DNH-1-11725-2021-22 · Book 1 · Consideration ₹4.53 Cr · Sy 41/2, Kundana hobli, Devanahalli taluk
Title deed filed with K-RERA, pp. 1, 6, 7, 11 · See it in Documents
Transfer of the land
Title deed executed
No. DNH-1-09947-2022-23 · Book 1 · Consideration ₹1.20 Cr · Sy 41/1, Kundana hobli, Devanahalli taluk
Title deed filed with K-RERA, pp. 1, 6, 7, 10 · See it in Documents
Approval or registration
Building plan sanctioned
BIAPPA · plan BIAPPA/TP/LAO/30/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/020323/005765
K-RERA registration ·
Approval or registrationTransfer of the land
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 41-1, 41-2, 194-1, 194-2, 194-3 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · 0 · 14 Feb 2023 | |
| Sale deed | Dated 15 Feb 2022, 24 Feb 2022, 14 Nov 2022 and 1 more | |
| Sale deed in favour of | M/s Manyata Developers Pvt. Ltd., M/s Manyata Developers Pvt. Ltd | |
| Title deed | Consideration ₹1.41 Cr | |
| Building plan (BIAPPA) | Sanctioned 31 Jan 2023 · No. BIAPPA/TP/LAO/30/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 41-1 | Converted 6 Feb 2018 · DC Bengaluru | |
| Sy 41-2 | Converted 8 Jun 2022 · DC Bengaluru | |
| Sy 194-1, 194-2 | Converted 26 May 2022 · DC Bengaluru | |
| Sy 194-3 | Converted 5 Jul 2022 · DC Bengaluru | |
| Survey numbers | 41-1 · 41-2 · 194-1 · 194-2 · 194-3 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
| Sattva Vasanta Skye | 3.3 km | Locked | |
|---|---|---|---|
| Sattva Vasanta Cove | 3.5 km | Locked | |
| Godrej MSR City | 3.7 km | Locked | |
| Sattva City | 4.1 km | Locked |
| Earthsong by Manyata Phase-4b This project | This project is the point the others are measured from | 31 Dec 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sattva Vasanta Skye | 3.3 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
| Sattva Vasanta Cove | 3.5 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 12.9 km, Kondappa layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 230 m to the south, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Possession, agreement | 31 Dec 2026 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 1 Feb 2023 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 9 Feb 2023 · site inspected 6 Feb 2023 | |
| Engineer's certificate, registration | Dated 6 Feb 2023 | |
| Chartered accountant's certificate, registration | Dated 6 Feb 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹10.56 Cr 46.4%Development · ₹12.22 Cr 53.6%
| Estimated cost | ₹22.78 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹11.47 Cr | |
| Estimated cost, chartered accountant's certificate | ₹22.78 Cr, same as the filing | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | YES BANK · CMH Road | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BIAPPA) | Sanctioned 31 Jan 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | YES BANK · CMH Road | |
Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sattva Vasanta Skye, price locked; Sattva Vasanta Cove, price locked; Godrej MSR City, price locked.
| Barca II At Godrej Msr City | about 4 km | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 4.5 km | Locked |
|---|
| Ekta Elements | 5.0 km | Locked |
|---|
| Varnam Phase 1c | about 5 km | Locked |
|---|
| Birla Trimaya Phase-3 | 5.2 km | Locked |
|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 5.5 km | Locked |
|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 5.5 km | Locked |
|---|
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 5.5 km | Locked |
|---|
| 3.7 km |
| 31 Mar 2030 |
| 100% (1,957 of 1,961) |
| Locked |
| Sattva City | 4.1 km | 28 Feb 2032 | 17% (425 of 2,491) | Locked |
|---|
| Barca II At Godrej Msr City | about 4 km | 31 Dec 2030 | 99% (593 of 602) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 4.5 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
| Projects within 4 km, counted | 19 (11 with an approximate location) | |
|---|---|---|
| Flats in them | 10,967 | |
| Booked | 8,265 of 10,967 (75%) | |
| Unsold | 2,702 | |
| Booked a month, pooled | 242 flats | |
| Months to sell, pooled | 11 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 19.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Panchayath) | |
| Nearest city water main | 8.7 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 3.8 km, Doddajala | |
| Kempegowda Airport | 14.3 | 20 | 8.6 |
| MG Road (CBD) | 32.5 | 37 | 27.4 |
| Manyata Tech Park | 27.6 | 33 | 19.6 |
| ITPL, Whitefield | 44.3 | 50 | 28.6 |
| Ecospace, Bellandur ORR | 48.0 | 58 | 33.2 |
| Electronic City Ph 1 | 52.3 | 62 | 42.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 1.4 km to the south-east, named Sadahalli Quarry on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |