Possession, agreementDec 2020Agreement for sale, p. 7
StructureNot verified yet
Structural safety certificateNot verified yet
Progress
Completion, architect
Completed
Work left
By component
Developer
Can the developer deliver?
Receivable, sold flatsNot verified yet
Cost leftNot verified yet
Sold88 / 88At the completion filing, 2 Feb 2024
Sold in the latest quarterCompleted
Funding
Estimated cost
Not verified yet
Cost left vs buyer dues
Not verified yet
Form 4
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNot verified yet
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed40On K-RERA
Available40100% of filed
K-RERA only0
Approvals with a validity dateNone read
Approvals & NOCs
2 pagesAvailable
12 pagesAvailable
2 pagesAvailable
8 pagesAvailable
Source: K-RERA project page and the documents filed there, as read by us. 6 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Ds-Max Star Line is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
Not verified yet
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
RERA extensions
None on the filing
RERA complaints
0
RERA completion date
30 Sep 2021
Registration certificates
PRM/KA/RERA/1251/310/PR/180313/001980
Land use
Conversion order
Not verified yet
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
about 0.5 km from the locality centre, tertiary drain
Nearest lake, tank or pond
about 0.5 km from the locality centre, Begur Lake
Height above nearest drain
Not verified yet
Amenities
Specification and Form 5
Not verified yet
Around it
Water
Groundwater, Bengaluru South taluk average
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
Water at a glance
Groundwater
Bengaluru South taluk average, July 2023: 16.9 m below ground
What it means
Not verified yet
Water below ground
16.9 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Local authority
Nearest city water main
Not verified yet
Distances
Measured from the site
Height above nearest drain
Not verified yet
Nearest drain
about 0.5 km from the locality centre, tertiary drain
Ground level
Not verified yet
Metro, operational
Not verified yet
Metro, under construction
Not verified yet
Connectivity
Road distance from the site
Not verified yet
Six city anchors · OSRM, no traffic
Not verified yet
Nuisances
Distance from the site
Locality only filed: no distance from the site to show
DOSL nuisance layer
Landfill or waste transfer station
about 2.5 km from the locality centre
Sewage treatment plant
about 1.5 km from the locality centre, named Chikkabeguru Sewage Treatment Plant on OpenStreetMap
Quarry
about 1.5 km from the locality centre
Crematorium
None within 3 km of the locality centre
Prison
None within 3 km of the locality centre
Electrical substation
about 0.5 km from the locality centre
Completed
Quarterly return
Main structure
Not verified yet
Electrical and plumbing finishing
Not verified yet
Internal roads
Not verified yet
Club house
Not verified yet
Completion
Completed, occupancy certificate 20 Apr 2020
Completion, accountant
Not verified yet
Dates
Dates
Filed dates
Possession, agreement
Dec 2020
Schedule end
31 Dec 2020
RERA completion date
30 Sep 2021
Grace period for possession
6 months
Work began, as filed
1 Apr 2017
Specified structure
What the promoter specified · not an inspection
Not verified yet
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.