| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Aishwarayam TranquilLapsed · completion date passed | MS AISHWARYAM CONCEPT HOMES | Apartment | 807 sqft carpet (as filed) | Mar 2023 |
| Akruthi Spring WoodsLapsed · completion date passed | DAI DORON INDIA PROPERTIES PVT. LTD. | Plot | – | Apr 2019 |
| Akshaya MeadowsLapsed · completion date passed | M/s Akshaya Meadows | Plot | ~1,080–1,800 sqft (estimate: filed carpet plus 25%) | Apr 2026 |
| AmaryllisLapsed · completion date passed | RAKI DEVELOPERS LLP | Apartment | 780–1,047 sqft carpet (as filed) | Jul 2026 |
| Ambiant - Maangalya AshirvadActive · 22% built | AMBIANT HOUSING & CONSTRUCTION PVT LTD. | Apartment | 896–1,171 sqft carpet (as filed) | Apr 2028 |
| Aqua VistaLapsed · completion date passed | POPPY REALTORS PRIVATE LIMITED |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 59 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Apartment |
| 323–5,371 sqft carpet (as filed) |
| Dec 2024 |
| Artha Satori Platinum | Artha Group | Villa | 4,780 sqft | – |
| Artha Zen | Artha Group | Villa | 1,881–4,832 sqft | – |
8 of 190 other projects in Bannerghatta Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Courtyard By Vedanth Suraksha in the interactive atlas
Approval or registration
Land use converted
DC BENGALURU · Survey 11/2, 11/4, 11/5, 11/6
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. JAY-1-05017-2023-24 · Book 1 · executed 2 Nov 2023 · Consideration ₹12.50 Cr · Sy 11/2; 1; 11/4; 11/6, Gottigere village, Uttarahalli hobli
Title deed filed with K-RERA, pp. 2, 5, 6, 11 · See it in Documents
Transfer of the land
Sale deed
in favour of VEDANTH SURAKSHA PROPERTIES · Survey 11/2, 11/4, 11/5, 11/6
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 11/2, 11/4, 11/5, 11/6
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan PRJ/7898/24-25IN
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/090126/008392
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 7 Nov 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 42,353 sq m | |
| Land area filed with K-RERA | 18,210 sq m | |
| Village, hobli and taluk on the KGIS map | Gottigere, Uttarahalli-1 hobli, Bangalore-South taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 11/2, 11/4, 11/5 & 11/6 | |
|---|---|---|
| Land extent, Sy 11/2, 11/4, 11/5 & 11/6 | 4 Acre, 25 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 18,210 sq m | |
| Khata | A Khatha · BBMP · 4 Jul 2025 | |
| Sale deed | Dated 2 Nov 2023 | |
| Sale deed in favour of | VEDANTH SURAKSHA PROPERTIES | |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 11/2 | 1 | 37 guntas | Not read yet | |||
| Sy. No. 11/4 | 1 | 1 acre 21 guntas | Not read yet |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 10 Nov 2025 · No. PRJ/7898/24-25IN | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/407/2024 · issued 19 Nov 2024 | Clear |
| Environmental clearance | SEIAA 179 CON 2024 · EC identification no. EC24C3801KA5221580N · issued 24 Jan 2025 | Clear |
| Airport height NOC | valid until 6 Jun 2032 | Clear |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2031 |
| Land conversion | Converted 6 Apr 2015 · DC BENGALURU | |
|---|---|---|
| Survey numbers | 11/2, 11/4, 11/5 & 11/6 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK - type 2 · avg 97 m² 44.6%3BHK - type 1 · avg 99 m² 32%3BHK - type 3 · avg 99 m² 6.5%4BHK - type 1 · avg 149 m² 6.1%10 other types 10.8%
| 3BHK - type 1 | 89 | 94,529 |
| 3BHK - type 1-a | 1 | 1,055 |
| 3BHK - type 1-b | 4 | 4,241 |
| 3BHK - type 2 | 124 | 1,29,199 |
| 3BHK - type 2 -b | 1 | 1,033 |
| 3BHK - type 2 -c | 1 | 1,033 |
| 3BHK - type 2-a | 2 | 2,077 |
| 3BHK - type 2-c | 1 | 1,033 |
| 3BHK - type 3 | 18 | 19,214 |
| 3BHK - type 3-a | 1 | 1,066 |
| 4BHK - type 1 | 17 | 27,276 |
| 4BHK - type 1-a | 1 | 1,604 |
| 4BHK - type 2 | 17 | 25,188 |
| 4BHK - type 2-a | 1 | 1,475 |
| Sold, Q2 2026-27 | 17 / 278 | |
|---|---|---|
| Unsold, Q2 2026-27 | 261 | |
| Months to sell, derived from filed bookings | 112 months |
| Aqua Vista | about 1 km | Locked | |
|---|---|---|---|
| Platinum Landmark | about 1.5 km | Locked | |
| Iris Courtyard | about 1.5 km | Locked | |
| Lodha Azur | 2.7 km | Locked |
| Courtyard By Vedanth Suraksha This project | This project is the point the others are measured from | 31 Dec 2031 | 6% (17 of 278) | Not verified yet |
|---|---|---|---|---|
| Aqua Vista | about 1 km | 31 Dec 2024 | 96% (173 of 181) | Locked |
| Platinum Landmark | about 1.5 km | 30 Dec 2027 | 17% (18 of 103) | Locked |
| Iris Courtyard | about 1.5 km |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Public & semi-public, at the filed pin | |
|---|---|---|
| Nearest high-tension line | A 220 kV line passes 30 m from the filed location: close enough that its corridor may cross the site | Review |
| Nearest government-flagged flood location | 950 m, BDA LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 70 m to the north-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 130 m to the north-east, Subbarayana Lake | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation · Badminton Courts | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Badminton Courts, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.72 (478 covered spaces for 278 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported itPossession date in the agreement

| Main structure | Not started · planned by 1 Mar 2030 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 1 Oct 2030 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 13% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Dec 2031 | |
|---|---|---|
| Schedule end | 1 Mar 2031 | |
| RERA completion date | 31 Dec 2031 | |
| Work began, as filed | 1 Dec 2025 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: TOWER A 62.5 m, TOWER B 65.65 m, TOWER C 65.65 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 176 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/407/2024 · issued 19 Nov 2024 | |
| Environmental clearance | SEIAA 179 CON 2024 · EC identification no. EC24C3801KA5221580N · issued 24 Jan 2025 | |
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 8 Dec 2025 · site inspected 8 Dec 2025 | |
| Chartered accountant's certificate, registration | Dated 2 Jan 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹119.03 Cr 31.6%Development · ₹257.79 Cr 68.4%
| Estimated cost | ₹376.81 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹208.00 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (17) 6.1%Unsold (261) 93.9%
| Sold, Q4 2025-26 | 3 / 278 · 275 available | |
|---|---|---|
| Sold, Q1 2026-27 | 16 / 278 · 262 available | |
| Sold, Q2 2026-27 | 17 / 278 · 261 available | |
| Unsold, Q2 2026-27 | 261 | |
| Sold in Q1 2026-27 | 13 | |
| Sold in Q2 2026-27 | 1 |
| Escrow bank | HDFC · Jayanagar 3rd Block | |
|---|---|---|
| Designated account, collected | ₹4.89 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹4.89 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Share of collections deposited in escrow | 70% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 7 Nov 2025 | |
| Building plan (BBMP) | Sanctioned 10 Nov 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Jayanagar 3rd Block | |

Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Lodha Azur, price locked; Sattva Forest Ridge, price locked; Azur Tower D, price locked.
| Sattva Forest Ridge | 2.8 km | Locked |
|---|
| Azur Tower D | 2.9 km | Locked |
|---|
| Azur Phase 2 | about 4.5 km | Locked |
|---|
| Srivara Vasudha | about 4.5 km | Locked |
|---|
| Pacific Legacy | 5.0 km | Locked |
|---|
| Assetz Canvas & Cove 2.0 - Block A | 5.5 km | Locked |
|---|
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 5.5 km | Locked |
|---|
| Jhanavi Trishul Alaska | 5.8 km | Locked |
|---|
| 30 Jun 2026 |
| 30% (12 of 40) |
| Locked |
| Lodha Azur | 2.7 km | 30 Oct 2029 | 97% (236 of 244) | Locked |
|---|
| Sattva Forest Ridge | 2.8 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
|---|
| Azur Tower D | 2.9 km | 30 Apr 2030 | 93% (110 of 118) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹44,000 /mo · 38 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹27,420 /mo · 52 listings | |
| Rent, 1BHK, 3 km | ₹13,999 /mo · 17 listings | |
| Rent per sq ft, 3 km | ₹28.2 /mo, as listed · 62 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 36 (18 with an approximate location) | |
|---|---|---|
| Flats in them | 8,202 | |
| Booked | 5,698 of 8,202 (69%) | |
| Unsold | 2,504 | |
| Booked a month, pooled | 190 flats | |
| Months to sell, pooled | 13 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 210 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 70 m to the north-west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 1.5 km, Kalena Agrahara | |
| Kempegowda Airport | 39.7 |
| MG Road (CBD) | 12.8 |
| Manyata Tech Park | 20.7 |
| ITPL, Whitefield | 21.5 |
| Ecospace, Bellandur ORR | 12.6 |
| Electronic City Ph 1 | 10.4 |
| Landfill or waste transfer station | 1.4 km to the south | |
|---|---|---|
| Sewage treatment plant | 1.7 km to the north-east | |
| Quarry | 1.7 km to the south-west, named Anjanapura Quarries on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.3 km to the north-west, named Khodays Glass Factory Substation on OpenStreetMap |