Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| A.R RuthviLapsed · completion date passed | G.RAVINDRAKUMAR & M.K.ASHOKA | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
| A.R Ruthvi Phase 2Filed as completed · no completion certificate on record | T MANJUNATHA | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Feb 2024 |
| Ag Varaha ValleyApplied for completion 23/01/2026 | ABHISHEK . A | Plot | ~1,230–1,500 sqft (estimate: filed carpet plus 25%) | Aug 2025 |
| Arvind LakeviewActive · 90% built | Arvind Builders | Plot | ~1,200–4,000 sqft (estimate: filed carpet plus 25%) | Dec 2027 |
| Arvind Orchids |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 9 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Location & risks | – | 1 | 1 | Review |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Arvind Builders |
| Plot |
| ~1,200–1,680 sqft (estimate: filed carpet plus 25%) |
| Dec 2023 |
| Ashwasurya LegacyRegistered · no quarterly update yet | M/s. Suryakalpa Ventures | Plot | ~1,200–2,220 sqft (estimate: filed carpet plus 25%) | Dec 2029 |
| B.T.G LayoutApplied for completion 11/03/2023 | SHARADAMMA | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Aug 2021 |
8 of 59 other projects in West Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Construction Of 1293 Dus At Kenchanapura Sy.No.63 in the interactive atlas
Approval or registration
Land use converted
Government of Karnataka · Survey 63
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Revenue Department · Survey 63
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/TPM/DLP-04/2020-21/996/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/100822/005150
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | Survey 117 (K.G.Kenchanapura) |
| East | EC schedule not read yet | Survey 107, 108, 116 (K.G.Kenchanapura); road |
| South | EC schedule not read yet | Survey 98 (K.G.Kenchanapura); Survey 133 (K.G.Yalachaguppe) |
| West | EC schedule not read yet | Survey 129, 132 (K.G.Yalachaguppe) |
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched plots on the KGIS map | 40,347 sq m | |
| Land area filed with K-RERA | 41,683 sq m | |
| Filed area as a share of the KGIS plots' area | 103% | |
| Village, hobli and taluk on the KGIS map | K.G.Kenchanapura, Kengeri-1 hobli, Bangalore-South taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 63 | |
|---|---|---|
| Land extent, Sy 63 | 10Acre 12Guntas | |
| Area on the KGIS map | 40,347 sq m, 1 of 1 filed survey numbers | |
| Land area of this registration | 41,683 sq m | |
| Khata | E Khatha · Revenue Department · 7 Oct 2020 |
| Building plan (BDA) | Sanctioned 1 Aug 2022 · No. BDA/TPM/DLP-04/2020-21/996/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Not verified yet | |
| Fire NOC | KSFES/NOC/242/2020 · issued 22 Dec 2020 · building height 44.95 m | Clear |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 20 Feb 2025 |
| Land conversion | Converted 4 May 2020 · Government of Karnataka | |
|---|---|---|
| Survey numbers | 63 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
2BHK · 45 m² 82.6%1BHK · 30 m² 17.4%
| Type | Flats | Carpet per flat (sq ft) |
|---|---|---|
| 1BHK | 225 | 323 |
| 2BHK | 1,068 | 484 |
| Sumadhura Pramoda | about 8 km | Locked | |
|---|---|---|---|
| Good Earth Ochre | 8.2 km | Locked | |
| Samaya Sunshine | about 8.5 km | Locked | |
| Good Earth Cadence | 8.6 km | Locked | |
| Sobha Royal Crest | about 10.5 km | Locked |
| Construction Of 1293 Dus At Kenchanapura Sy.No.63 This project | This project is the point the others are measured from | 20 Feb 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sumadhura Pramoda | about 8 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
| Good Earth Ochre | 8.2 km | 31 Oct 2027 | 92% (35 of 38) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 5.0 km, Sonnenahalli Bridge Upstream Gollarahatti | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 570 m to the north-east, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.07 (90 covered spaces for 1,293 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Jul 2024 | |
| RERA completion date | 20 Feb 2025 | Red flag |
| Work began, as filed | 20 Feb 2020 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 44.95 m on the fire NOC · 44 m filed, 4 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/242/2020 · issued 22 Dec 2020 · building height 44.95 m | |
| Environmental clearance | Not verified yet | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹79.23 Cr 30.4%Development · ₹181.63 Cr 69.6%
| Estimated cost | ₹260.86 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Canara Bank · Canara Bank, Banglore SPLSD Govt Business Branch 6349 | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 23 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 23 | Review |
| Complaints filed against the promoter | 4 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 1 Aug 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Canara Bank · Canara Bank, Banglore SPLSD Govt Business Branch 6349 | |
| Birla Tisya | 11.1 km | Locked |
|---|
| about 8.5 km |
| 31 Dec 2026 |
| 33% (8 of 24) |
| Locked |
| Good Earth Cadence | 8.6 km | 31 Dec 2028 | 72% (104 of 145) | Locked |
|---|
| Sobha Royal Crest | about 10.5 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
|---|
| Birla Tisya | 11.1 km | 31 Dec 2026 | 100% (392 of 392) | Locked |
|---|
| Projects within 4 km, counted | 1 (1 with an approximate location) | |
|---|---|---|
| Flats in them | 180 | |
| Booked | 33 of 180 (18%) | |
| Unsold | 147 | |
| Booked a month, pooled | 4 flats | |
| Months to sell, pooled | 34 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 4.2 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | 6.7 km, Kengeri | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 39.6 |
| MG Road (CBD) | 17.7 |
| Manyata Tech Park | 21.9 |
| ITPL, Whitefield | 32.4 |
| Ecospace, Bellandur ORR | 26.3 |
| Electronic City Ph 1 | 28.9 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.9 km to the east, named STP-1 on OpenStreetMap | |
| Quarry | 2.0 km to the south-west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |