Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| A.R RuthviLapsed · completion date passed | G.RAVINDRAKUMAR & M.K.ASHOKA | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
| A.R Ruthvi Phase 2Filed as completed · no completion certificate on record | T MANJUNATHA | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Feb 2024 |
| Arvind LakeviewActive · 90% built | Arvind Builders | Plot | ~1,200–4,000 sqft (estimate: filed carpet plus 25%) | Dec 2027 |
| Arvind OrchidsApplied for completion 16/02/2024 | Arvind Builders | Plot | ~1,200–1,680 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
| Ashwasurya Legacy |
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified this for this project yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 10 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | 1 | – | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| M/s. Suryakalpa Ventures |
| Plot |
| ~1,200–2,220 sqft (estimate: filed carpet plus 25%) |
| Dec 2029 |
| B.T.G LayoutApplied for completion 11/03/2023 | SHARADAMMA | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Aug 2021 |
| Bhadra CityRegistration revoked | Bhadra Landmarks Private Limitd | Plot | – | Jul 2021 |
8 of 59 other projects in West Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ag Varaha Valley in the interactive atlas
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (Nelamangala Planning Authority) | Sanctioned 21 Aug 2024 · No. L.A.O.99/2023-2024 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Not verified yet | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 2 Aug 2025 |
| Land conversion | Converted 3 Aug 2022 · District commissioner | |
|---|---|---|
| Survey numbers | 101/2 |
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 9 km, Shambhavinagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.1 m
Across Nelamangala, the water table sat 27.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.1 m, and it recovered 7.7 m over the year.
| Groundwater | Nelamangala taluk average, July 2023: 27.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km |
|---|
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 2 Aug 2025 | Review |
| Work began, as filed | 2 Sep 2024 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Engineer's certificate, registration | Dated 10 Feb 2025 | |
Land · ₹11.27 Cr 74.8%Development · ₹3.80 Cr 25.2%
| Estimated cost | ₹15.07 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹2.14 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Karnataka Bank Ltd. · YELAHANKA NEW TOWN | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 21 Aug 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Karnataka Bank Ltd. · YELAHANKA NEW TOWN | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | about 8 km, Madavara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 36 |
| MG Road (CBD) | 24.5 |
| Manyata Tech Park | 24 |
| ITPL, Whitefield | 38 |
| Ecospace, Bellandur ORR | 34.5 |
| Electronic City Ph 1 | 40 |
| Sewage treatment plant | None within 3 km |
|---|
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1 km, named Nelamangala Substation on OpenStreetMap |
|---|