Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | 1 | – | 2 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Aspire CalixiaApplied for completion 21/09/2026 | M/S. ASPIRE REAL | Plot | ~1,420–1,780 sqft (estimate: filed carpet plus 25%) | Mar 2028 |
| Brigade Nanda HeightsActive · 100% built |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 76 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Brigade Enterprises Ltd |
| Apartment |
| 990–1,550 sqft carpet (as filed) |
| Dec 2026 |
| Nandi BrindavanExtended to 01-03-2027 | NANDI DEVELOPERS | Apartment | – | Mar 2027 |
| Sai Nandana MarvellaCompleted · OC 31-01-2025 | SAI NANDANA PROPERTIES | Apartment | 793–957 sqft carpet (as filed) | Completed |
| Shiva SakthiActive · 45% built | SHIVASHAKTHI BUILDERS AND DEVELOPERS | Apartment | 2,315 sqft carpet (as filed) | Mar 2027 |
| Sobha ClovellyCompleted (regulator flag) | Sobha Limited | Apartment | 1,573 sqft carpet (as filed) | Completed |
| Song Of WindLapsed · completion date passed | ROYAL INDRAPRASTHA BUILDCON LLP | Apartment | 1,095 sqft carpet (as filed) | Feb 2026 |
| Usr SusowdhaCompleted · OC 29-08-2025 | USR BUILDERS AND DEVELOPERS | Apartment | 823–1,040 sqft carpet (as filed) | Completed |
All 8 other projects in Padmanabhanagar, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Brigade Komarla Heights in the interactive atlas
Transfer of the land
Sale deed
Survey 74/2B
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 75
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Sy 78/2, Bangalore South taluk · 00 Acres 18 Guntas
Title deed filed with K-RERA, pp. 6, 13 · See it in Documents
Transfer of the land
Sale deed
Survey 78/4, 78/2
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner · Survey 75, 78/2
K-RERA filing, land schedule
Covers 78/2 only
Approval or registration
Land use converted
Deputy Commissioner · Survey 75, 78/2
K-RERA filing, land schedule
Covers 78/4 only
Approval or registration
Land use converted
Deputy Commissioner · Survey 78/4
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner · Survey 74/2B
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Sy 74/2B; 74/2, Chikkallasandra village, Bangalore South taluk
Title deed filed with K-RERA, pp. 5, 13 · See it in Documents
Approval or registration
Khata issued
A Khatha · BBMP · Survey 75, 78/4, 78/2, 74/2B
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 75, 78/4, 78/2, 74/2B
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 75, 78/4, 78/2, 74/2B
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDSOUTH/0008/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/140322/004754
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | Not verified yet | |
| Title report dated | 5 Aug 2020 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 75, 78/4, 78/2, 74/2B | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 16,389 sq m | |
| Khata | A Khatha · BBMP · 3 Aug 2021 | |
| Sale deed | Dated 10 Jan 1967, 13 Apr 1989, 1 Apr 2009 | |
| Title deed | Sy 75, Chikkakallasandra village, Bangalore South taluk · 2 Acres and 20 Guntas | |
| Building plan (BBMP) | Sanctioned 19 Jan 2022 · No. BBMP/Addl.Dir/JDSOUTH/0008/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/012/2021 · issued 10 Jun 2021 · building height 75.12 m (Tower A), 78.1 m (Tower B) | Clear |
| Environmental clearance | SEIAA 96 CON 2020 · issued 4 Sep 2020 | Clear |
| Airport height NOC | NOC ID BIAL/SOUTH/B/070920/473453 · permissible top elevation 976 m above mean sea level | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 17 Feb 2021 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 75, 78/2 | Converted 27 Apr 2012 · Deputy Commissioner | |
| Sy 78/4 | Converted 29 Jan 2015 · Deputy Commissioner | |
| Sy 74/2B | Converted 21 Dec 2016 · Deputy Commissioner | |
| Survey numbers | 75 · 78/4 · 78/2 · 74/2B |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2 bedroom 2 toilet · 68 m² 66.7%2 bedroom 2 toilet · 69 m² 33.3%
| Type | Flats | Carpet per flat (sq ft) |
|---|---|---|
| 2 bedroom 2 toilet | 25 | 743 |
| 2 bedroom 2 toilet | 50 | 732 |
| Sold, Q2 2026-27 | 319 / 319 | |
|---|---|---|
| Unsold, Q2 2026-27 | 0 |
| Song Of Wind | about 0.5 km | Locked | |
|---|---|---|---|
| Adarsh Premia | 1.2 km | Locked | |
| Garden Square | 1.8 km | Locked | |
| Sobha Royal Crest | about 2.5 km | Locked |
| Brigade Komarla Heights This project | This project is the point the others are measured from | 31 Dec 2026 | 100% (319 of 319) | Not verified yet |
|---|---|---|---|---|
| Song Of Wind | about 0.5 km | 28 Feb 2026 | 63% (10 of 16) | Locked |
| Adarsh Premia | 1.2 km | 31 Mar 2027 | 55% (182 of 330) | Locked |
| Garden Square | 1.8 km | 30 Jun 2026 |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 970 m, sanjaynagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 90 m to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 150 m to the north-east, Chikkalasandra lake | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity | |
|---|---|---|
| Electricity, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.90 (285 covered spaces for 318 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
As the promoter reported it

| Main structure | 100% · planned by 25 Feb 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 21 Nov 2024 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 21 Nov 2024 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 3 Feb 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 75.12 m (Tower A), 78.1 m (Tower B) on the fire NOC · filed: Tower A 75.13 m, Tower B 78.1 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/012/2021 · issued 10 Jun 2021 · building height 75.12 m (Tower A), 78.1 m (Tower B) | |
| Environmental clearance | SEIAA 96 CON 2020 · issued 4 Sep 2020 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Chartered accountant, Form 4 | Dated 6 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹67.58 Cr 31.1%Development · ₹150.00 Cr 68.9%
| Estimated cost | ₹217.58 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (319) 100%
| Sold, Q3 2025-26 | 281 / 319 · 38 available | |
|---|---|---|
| Sold, Q4 2025-26 | 281 / 319 · 38 available | |
| Sold, Q1 2026-27 | 319 / 319 · 0 available | |
| Sold, Q2 2026-27 | 319 / 319 · 0 available | |
| Unsold, Q2 2026-27 | 0 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 38 | |
| Sold in Q2 2026-27 | 0 | |
| Flats booked, Form 4 Q1 2026-27 | 281 |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road | |
|---|---|---|
| Designated account, collected | ₹20.91 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 (0% of that quarter's deposits) | |
| Sale proceeds realised, Q1 2026-27 | ₹70,81,00,000 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| K-RERA registrations under this promoter | 60 | |
|---|---|---|
| Marked completed | 20 | |
| Past promised date, not completed | 15 | |
| Revoked or withdrawn | 1 | |
| Complaints filed against the promoter | 44 | |
| Other phases under this promoter name | 31 | |
| With a filed extension or completion | 13 (11 completed, 2 extended) | |
| Average schedule slip | 19 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 19 Jan 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road | |

Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Adarsh Premia, price locked; Garden Square, price locked.
| Srivara Vasudha | about 4.5 km | Locked |
|---|
| Sumadhura Pramoda | about 5.5 km | Locked |
|---|
| Sattva Forest Ridge | 5.6 km | Locked |
|---|
| Iris Courtyard | about 6 km | Locked |
|---|
| Samaya Sunshine | about 6 km | Locked |
|---|
| Jhanavi Trishul Alaska | 6.0 km | Locked |
|---|
| Pacific Legacy | 6.2 km | Locked |
|---|
| Vista Svara | about 6 km | Locked |
|---|
| 84% (193 of 230) |
| Locked |
| Sobha Royal Crest | about 2.5 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
|---|
| Srivara Vasudha | about 4.5 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
|---|
| Sumadhura Pramoda | about 5.5 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹38,000 /mo · 45 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹25,000 /mo · 84 listings | |
| Rent, 1BHK, 3 km | ₹10,000 /mo · 41 listings | |
| Rent per sq ft, 3 km | ₹24.1 /mo, as listed · 81 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 17 (9 with an approximate location) | |
|---|---|---|
| Flats in them | 2,911 | |
| Booked | 1,859 of 2,911 (64%) | |
| Unsold | 1,052 | |
| Booked a month, pooled | 55 flats | |
| Months to sell, pooled | 19 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB, Local authority (BWWSB), Other | |
| Nearest city water main | 180 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 90 m to the north-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 2.3 km, Banashankari | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 35.8 |
| MG Road (CBD) | 8.7 |
| Manyata Tech Park | 16.4 |
| ITPL, Whitefield | 21.5 |
| Ecospace, Bellandur ORR | 13.8 |
| Electronic City Ph 1 | 15.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.2 km to the west | |
| Quarry | None within 3 km | |
| Crematorium | 1.9 km to the east | |
| Prison | None within 3 km | |
| Electrical substation | 1.0 km to the west, named Arehalli on OpenStreetMap |