| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 2 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 65 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 160 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Bhoo Aabharana in the interactive atlas
Approval or registration
Land use converted
Special District Officer, Bangalore · Survey 18/4
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M/s. Bhoo Developers · Survey 18/4
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. SHV-1-00444-2022-23 · Book 1 · Consideration ₹11.50 Cr · Sy 18/4
Title deed filed with K-RERA, pp. 13, 14, 21 · See it in Documents
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com./MDP/0262/22-23
K-RERA filing, approvals
Approval or registration
Khata issued
A Khatha · Bruhat Bangalore Mahanagara Palike · Survey 18/4
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/140923/006261
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 27 May 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 2 pages.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 18/4 | |
|---|---|---|
| Land extent, Sy 18/4 | 1 Acre, 13.63 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 5,416 sq m | |
| Khata | A Khatha · Bruhat Bangalore Mahanagara Palike · 15 Apr 2023 | |
| Sale deed | Dated 6 Apr 2022 | |
| Sale deed in favour of | M/s. Bhoo Developers | |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 9 Mar 2023 · No. BBMP/Ad.Com./MDP/0262/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-338689 · issued 24 Jul 2023 · valid until 25 Jun 2028 | Clear |
| Water and sewerage NOC (BWSSB) | issued 4 Aug 2023 |
| RERA extensions | Granted · Approved 11 Jun 2025 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Apr 2026 |
| Land conversion | Converted 21 Oct 2009 · Special District Officer, Bangalore | |
|---|---|---|
| Survey numbers | 18/4 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2BHK · avg 88 m² 51.7%3BHK · avg 117 m² 48.3%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 60 | 951 |
| 3BHK | 56 | 1,255 |
| Sold, Q1 2026-27 | 116 / 116 | |
|---|---|---|
| Unsold, Q1 2026-27 | 0 |
| Vkk Grand | 1.2 km | Locked | |
|---|---|---|---|
| Legacy Saviero | about 2 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 3 km | Locked | |
| Brr North Excellency Phase I | about 3 km | Locked |
| Bhoo Aabharana This project | This project is the point the others are measured from | 30 Apr 2026 | 100% (116 of 116) | Not verified yet |
|---|---|---|---|---|
| Vkk Grand | 1.2 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| Legacy Saviero | about 2 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| SOBHA Victoria Park Phase 1 | about 3 km |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 910 m, Vaddara palya, Near Hennur Bande | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 90 m to the south-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 330 m to the west, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 100% | |
| Community Hall, built | 100% | |
| Indoor Sports facility, built | 100% | |
| Power Backup, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.13 (131 covered spaces for 116 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 100% · planned by 4 Apr 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 30 Apr 2025 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 15 May 2025 | |
| RERA completion date | 30 Apr 2026 | |
| Work began, as filed | 23 Dec 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 13 m filed, 4 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 11.15 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Apr 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Apr 2026 (3 filed) | |
| Architect's certificate, registration | Dated 24 Jun 2023 · site inspected 15 Jun 2023 | |
| Engineer's certificate, registration | Dated 5 Aug 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹11.50 Cr 13.3%Development · ₹75.10 Cr 86.7%
| Estimated cost | ₹86.60 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹51.86 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (116) 100%
| Sold, Q3 2025-26 | 113 / 116 · 3 available | |
|---|---|---|
| Sold, Q4 2025-26 | 116 / 116 · 0 available | |
| Sold, Q1 2026-27 | 116 / 116 · 0 available | |
| Unsold, Q1 2026-27 | 0 | |
| Sold in Q4 2025-26 | 3 | |
| Sold in Q1 2026-27 | 0 | |
| Flats booked, Form 4 Q1 2026-27 | 113 |
| Escrow bank | STATE BANK OF INDIA · Banaswadi | |
|---|---|---|
| Designated account, collected | ₹9.84 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹4.44 Cr in Q1 2026-27 (45% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹36,77,51,693 | |
| Withdrawn from the escrow account to date | ₹51,97,50,604 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 27 May 2025 | |
| Building plan (BBMP) | Sanctioned 9 Mar 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · Banaswadi | |

Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Vkk Grand, price locked; Lodha Mirabelle, price locked.
| Lodha Mirabelle | 3.2 km | Locked |
|---|
| Mirabelle Phase 2 | about 3 km | Locked |
|---|
| Nava Skanda Bellavita | about 3.5 km | Locked |
|---|
| Sumadhura Solea | 4.1 km | Locked |
|---|
| Sumadhura Epitome | 4.3 km | Locked |
|---|
| The Pearl Paradise | 4.4 km | Locked |
|---|
| Sattva La Vita | 4.8 km | Locked |
|---|
| Magnolia Delight | about 5 km | Locked |
|---|
| 31 Dec 2027 |
| 93% (280 of 300) |
| Locked |
| Brr North Excellency Phase I | about 3 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
|---|
| Lodha Mirabelle | 3.2 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
|---|
| Mirabelle Phase 2 | about 3 km | 31 May 2030 | 61% (173 of 284) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹38,000 /mo · 47 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹28,000 /mo · 123 listings | |
| Rent, 1BHK, 3 km | ₹15,000 /mo · 33 listings | |
| Rent per sq ft, 3 km | ₹25.9 /mo, as listed · 101 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 30 (18 with an approximate location) | |
|---|---|---|
| Flats in them | 5,260 | |
| Booked | 3,184 of 5,260 (61%) | |
| Unsold | 2,076 | |
| Booked a month, pooled | 67 flats | |
| Months to sell, pooled | 31 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 550 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 90 m to the south-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 1.4 km, HRBR Layout | |
| Kempegowda Airport | 26.0 | 28 | 19.4 |
| MG Road (CBD) | 11.4 | 15 | 8.2 |
| Manyata Tech Park | 5.7 | 9 | 3.4 |
| ITPL, Whitefield | 15.0 | 19 | 10.9 |
| Ecospace, Bellandur ORR | 17.4 | 29 | 12.4 |
| Electronic City Ph 1 | 28.4 | 37 | 21.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 990 m to the north | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.4 km to the south, named Banaswadi Substation on OpenStreetMap |