| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 2 sections
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Affinity BrundaavanaExtended to 01-04-2027 | AFFINITY PROJECTS | Apartment | 775–1,609 sqft carpet (as filed) | Apr 2027 |
| Alpine Pyramid - IrisActive · 42% built | ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 67 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Apartment |
| 729–1,004 sqft carpet (as filed) |
| Apr 2028 |
| Amigo EstellaCompleted · OC 06-04-2023 | AMIGOESTELLA INDIA LLP | Apartment | – | Completed |
| Arvind SporciaCompleted · OC 23-03-2018 | Arvind SmartSpaces Limited | Apartment | 3,768 sqft carpet (as filed) | Completed |
| Assetz Soho & Sky Phase 1bActive · 85% built | APG IMPERIAL HOMES PRIVATE LIMITED | Apartment | 1,370–1,886 sqft carpet (as filed) | Dec 2027 |
| Baldota SignatureCompleted · OC 29-12-2022 | BALDOTA BUILDERS AND DEVELOPERS | Apartment | – | Completed |
| BlissCompleted · OC 15-04-2023 | FINELINE INFRA PRIVATE LIMITED | Apartment | 758 sqft carpet (as filed) | Completed |
| Boulevard ResidencesCompleted · OC 27-01-2023 | SILVERTREE PROJECTS LLP | Apartment | 678–1,039 sqft carpet (as filed) | Completed |
8 of 38 other projects in Rachenahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sumadhura Epitome in the interactive atlas
Approval or registration
Land use converted
DC Bangalore · Survey 118, 116/1-1, 115/2-1, 11
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Sy 117; 117/2; 117/3; 117/4; 117/5, Rachenahalli village, Krishnarajapuram hobli, Bengaluru East taluk · 1 Acres 38 Guntas
Title deed filed with K-RERA, pp. 1, 11 · See it in Documents
Transfer of the land
Sale deed
in favour of M/s SUMADHURA HOMES LLP · Survey 118, 116/1-1, 115/2-1, 11
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · ARO BATARAYANAPURA BANGALORE · Survey 118, 116/1-1, 115/2-1, 11
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan PRJ/1343/2024-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/190924/007044
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 9 Sep 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 7/1/117,118,116/1-1,115/2-1,11 | |
|---|---|---|
| Land extent, Sy 7/1/117,118,116/1-1,115/2-1,11 | 00 Acre, 31 Gunta / 3136.28 Sq Mtr | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 15,169 sq m | |
| Khata | A Khatha · ARO BATARAYANAPURA BANGALORE · 27 May 2024 | |
| Sale deed | Dated 9 Nov 2022 | |
| Sale deed in favour of | M/s SUMADHURA HOMES LLP | |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 27 Aug 2024 · No. PRJ/1343/2024-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/200/2024 · issued 4 Jul 2024 | Clear |
| Environmental clearance | SEIAA 31 CON 2024 · EC identification no. EC24C3801KA5854671N · issued 8 Aug 2024 | Clear |
| Airport height NOC | NOC ID BIAL/SOUTH/B/021124/914443 | |
| Pollution board (CFE) | consent order CTE-347278 · issued 28 Jan 2025 · valid until 7 Aug 2034 | Clear |
| Water and sewerage NOC (BWSSB) | issued 15 Jul 2024 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2027 |
| Land conversion | Converted 15 Dec 2008 · DC Bangalore | |
|---|---|---|
| Survey numbers | 7/1/117,118,116/1-1,115/2-1,11 |
₹99 for this report opens Valuation and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation and Disputes & cases for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 1.4 km, Telecom layout, Ashwathnagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 170 m to the south-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 580 m to the south, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 20% | |
| CCTV Surveillance, built | 0% | |
| Community Hall, built | 30% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.82 (478 covered spaces for 262 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 89% · planned by 26 Sep 2026 | |
|---|---|---|
| Electrical and plumbing finishing | 30% · planned by 21 Mar 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 67% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Aug 2027 | |
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 10 Aug 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 44.95 m filed, 3 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 85.9 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/200/2024 · issued 4 Jul 2024 | |
| Environmental clearance | SEIAA 31 CON 2024 · EC identification no. EC24C3801KA5854671N · issued 8 Aug 2024 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹77.36 Cr 24%Development · ₹244.91 Cr 76%
| Estimated cost | ₹322.27 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹175.23 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (152) 58%Unsold (110) 42%
| Sold, Q3 2025-26 | 93 / 203 · 110 available | |
|---|---|---|
| Sold, Q4 2025-26 | 130 / 262 · 132 available | |
| Sold, Q1 2026-27 | 147 / 262 · 115 available | |
| Sold, Q2 2026-27 | 152 / 262 · 110 available | |
| Unsold, Q2 2026-27 | 110 | |
| Sold in Q4 2025-26 | 37 | |
| Sold in Q1 2026-27 | 17 | |
| Sold in Q2 2026-27 | 5 |
| Escrow bank | Axis Bank · VICTORIA LAYOUT | |
|---|---|---|
| Designated account, collected | ₹20.11 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹14.11 Cr in Q2 2026-27 (70% of that quarter's deposits) | |
| Share of collections deposited in escrow | 71.2% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 24 | |
|---|---|---|
| Marked completed | 10 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 1 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 9 Sep 2024 | |
| Building plan (BBMP) | Sanctioned 27 Aug 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · VICTORIA LAYOUT | |

Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB, Local authority (BWSSB) | |
| Nearest city water main | 340 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 170 m to the south-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 2.7 km, Nagawara | |
| Kempegowda Airport | 24.7 | 26 | 17.2 |
| MG Road (CBD) | 12.8 | 16 | 10.3 |
| Manyata Tech Park | 3.2 | 6 | 2.3 |
| ITPL, Whitefield | 20.6 | 25 | 14.9 |
| Ecospace, Bellandur ORR | 25.4 | 34 | 16.6 |
| Electronic City Ph 1 | 34.2 | 41 | 25.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.6 km to the west, named Rachenahalli 10MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | 1.4 km to the north | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the north |