| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakh Multi - Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Apr 2023 |
| 99d By SanthustaActive · 100% built | M/s. SANTHUSTA INFRACON PRIVATE LIMITED | Plot | ~1,080–2,430 sqft (estimate: filed carpet plus 25%) | Jul 2028 |
| Adhya EnclaveLapsed · completion date passed | ADHYA DEVELOPERS | Plot | – | Dec 2023 |
| Affinity FidelityLapsed · completion date passed | SUDHAKARA REDDY ANNEM | Apartment | – | Jul 2022 |
| Affinity SarovarActive · 96% built | AFFINITY PROJECTS LLP | Apartment | 982–1,237 sqft carpet (as filed) | Sep 2027 |
| Alpine Pyramid EfghCompleted (regulator flag) |
Title & ownership
Approvals
Disputes & cases
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 45 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 2 | 1 | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED |
| Apartment |
| 1,066 sqft carpet (as filed) |
| Completed |
| ArenaLapsed · completion date passed | Marudhar Infra | Mixed development | 628–1,053 sqft carpet (as filed) | Sep 2024 |
| Arvind Orchards (Phase 1 + 2)Applied for completion 05/10/2026 | Arvind SmartSpaces | Plot | 1,500–2,400 sqft | Dec 2029 |
8 of 89 other projects in Doddaballapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Arvind Orchards Phase-2 in the interactive atlas
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 23 Dec 2025 · No. STRRPA/TP/LAO/01/2025-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 29 Dec 2029 |
| Land conversion | 6 of 6 parcels converted | |
|---|---|---|
| Sy 69/6 | Converted 23 Sep 2024 · Deputy Commissioner | |
| Sy 194/1, 194/3, 195/4, 195/5 | Converted 24 Sep 2024 · Deputy Commissioner | |
| Sy 195/2 | Converted 24 Sep 2024 · 1 Acre 2.5 Guntas | |
| Survey numbers | 69/6 · 194/1 · 194/3 · 195/2 · 195/4 · 195/5 |
| Due on signing | Not verified yet | |
|---|---|---|
| Due within 15 days | Not verified yet | |
| Each construction stage | Not verified yet | |
| Floors in payment plan | Not verified yet | |
| Late-payment interest | Rate prescribed in the Rules | |
| Interest the builder pays on late possession | Rate prescribed in the Rules | |
| Arvind Orchards Phase-2 This project | This project is the point the others are measured from | 29 Dec 2029 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 6 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 6 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture, at the filed pin | Review |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 210 m from the filed location | Clear |
| Nearest government-flagged flood location | 19.1 km, Kondappa layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 100 m to the north-west, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 81% | |
| Completion, accountant | 34.7% of the estimated cost spent | |
| Possession, agreement | 29 Dec 2029 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 29 Dec 2029 | |
| Work began, as filed | 16 Feb 2026 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Engineer's certificate, registration | Dated 17 Dec 2025 | |
Land · ₹12.23 Cr 29.9%Development · ₹28.67 Cr 70.1%
| Estimated cost | ₹40.90 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹18.61 Cr | |
| Cost incurred | ₹14.17 Cr (34.7% of the estimate) | |
| Cost left | ₹26.73 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹25.48 Cr | |
| Land cost revision | Not verified yet | |
| Escrow bank | ICICI Bank · Devanahalli Branch | |
|---|---|---|
| Designated account, collected | ₹5.07 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹1.33 Cr in Q2 2026-27 (26% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 23 Dec 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · Devanahalli Branch | |

| Sattva Vasanta Cove | 7.7 km | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 7.5 km | Locked |
|---|
| Godrej MSR City | 8.7 km | Locked |
|---|
| Barca II At Godrej Msr City | about 9 km | Locked |
|---|
| Birla Trimaya Phase-3 | 9.6 km | Locked |
|---|
| Birla Trimaya Phase-2 | about 10 km | Locked |
|---|
| Birla Trimaya | about 10 km | Locked |
|---|
| Sattva City | 10.0 km | Locked |
|---|
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 6 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
|---|
| Sattva Vasanta Skye | 7.6 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
|---|
| Sattva Vasanta Cove | 7.7 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 7.5 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 19.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Panchayath), Other | |
| Nearest city water main | 14.9 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 9.5 km, Doddajala | |
| Kempegowda Airport | 10.7 |
| MG Road (CBD) | 33.7 |
| Manyata Tech Park | 25.8 |
| ITPL, Whitefield | 33.7 |
| Ecospace, Bellandur ORR | 39.0 |
| Electronic City Ph 1 | 48.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 2.8 km to the north-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |