Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | 1 | – | – | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Aishwarayam TranquilLapsed · completion date passed | MS AISHWARYAM CONCEPT HOMES | Apartment | 807 sqft carpet (as filed) | Mar 2023 |
| Akruthi Spring WoodsLapsed · completion date passed | DAI DORON INDIA PROPERTIES PVT. LTD. | Plot | – | Apr 2019 |
| Akshaya MeadowsLapsed · completion date passed | M/s Akshaya Meadows | Plot | ~1,080–1,800 sqft (estimate: filed carpet plus 25%) | Apr 2026 |
| AmaryllisLapsed · completion date passed | RAKI DEVELOPERS LLP | Apartment | 780–1,047 sqft carpet (as filed) | Jul 2026 |
| Ambiant - Maangalya AshirvadActive · 22% built | AMBIANT HOUSING & CONSTRUCTION PVT LTD. | Apartment | 896–1,171 sqft carpet (as filed) | Apr 2028 |
| Aqua VistaLapsed · completion date passed | POPPY REALTORS PRIVATE LIMITED |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 13 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Apartment |
| 323–5,371 sqft carpet (as filed) |
| Dec 2024 |
| Artha Satori Platinum | Artha Group | Villa | 4,780 sqft | – |
| Artha Zen | Artha Group | Villa | 1,881–4,832 sqft | – |
8 of 190 other projects in Bannerghatta Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Tirumalaa Square in the interactive atlas
Transfer of the land
Sale deed
Survey 16/8
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 16/8
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JD SOUTH/0042/19-20
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/200922/005246
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 16/8 | |
|---|---|---|
| Land extent, Sy 16/8 | 30 GUNTAS | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 3,034 sq m | |
| Khata | A Khatha · BBMP · 27 Aug 2014 | |
| Sale deed | Dated 22 Jul 1995 | |
| Building plan (BBMP) | Sanctioned 18 Feb 2020 · No. BBMP/Addl.Dir/JD SOUTH/0042/19-20 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Not verified yet | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 6 | |
| RERA completion date | 21 Sep 2023 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 16/8 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
45 · avg 30 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 45 | 45 | 323 |
| Aqua Vista | about 0.5 km | Locked | |
|---|---|---|---|
| Iris Courtyard | about 1.5 km | Locked | |
| Platinum Landmark | about 2 km | Locked | |
| Lodha Azur | about 2.5 km | Locked | |
| Azur Tower D | about 2.5 km | Locked |
| Tirumalaa Square This project | This project is the point the others are measured from | 21 Sep 2023 | Not filed | Not verified yet |
|---|---|---|---|---|
| Aqua Vista | about 0.5 km | 31 Dec 2024 | 96% (173 of 181) | Locked |
| Iris Courtyard | about 1.5 km | 30 Jun 2026 | 30% (12 of 40) | Locked |
| Platinum Landmark |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, BDA LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.93 (42 covered spaces for 45 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 20 Sep 2023 | |
| RERA completion date | 21 Sep 2023 | Red flag |
| Work began, as filed | 25 Jan 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 15 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹19.1 L 2%Development · ₹9.58 Cr 98%
| Estimated cost | ₹9.77 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Axis Bank · KODICHIKKANAHALLI | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 6 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 18 Feb 2020 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · KODICHIKKANAHALLI | |
| Sattva Forest Ridge | about 3.5 km | Locked |
|---|
| Azur Phase 2 | about 4 km | Locked |
|---|
| Pacific Legacy | about 5 km | Locked |
|---|
| Srivara Vasudha | about 5 km | Locked |
|---|
| Assetz Canvas & Cove 2.0 - Block A | about 5 km | Locked |
|---|
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 5 km | Locked |
|---|
| Dhiraan Lotus | about 5.5 km | Locked |
|---|
| about 2 km |
| 30 Dec 2027 |
| 17% (18 of 103) |
| Locked |
| Lodha Azur | about 2.5 km | 30 Oct 2029 | 97% (236 of 244) | Locked |
|---|
| Azur Tower D | about 2.5 km | 30 Apr 2030 | 93% (110 of 118) | Locked |
|---|
| Sattva Forest Ridge | about 3.5 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
|---|
| Projects within 4 km, counted | 39 (39 with an approximate location) | |
|---|---|---|
| Flats in them | 10,788 | |
| Booked | 7,847 of 10,788 (73%) | |
| Unsold | 2,941 | |
| Booked a month, pooled | 242 flats | |
| Months to sell, pooled | 12 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 1 km, Kalena Agrahara | |
| Kempegowda Airport | 39.5 |
| MG Road (CBD) | 12.5 |
| Manyata Tech Park | 20.5 |
| ITPL, Whitefield | 21 |
| Ecospace, Bellandur ORR | 12 |
| Electronic City Ph 1 | 10 |
| Landfill or waste transfer station | about 1.5 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | about 2 km to the east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the north-west, named Khodays Glass Factory Substation on OpenStreetMap |