Overview
Overview
Overview
Taken 7 Apr 2026| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakh Multi - Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Apr 2023 |
| 99d By SanthustaActive · 100% built | M/s. SANTHUSTA INFRACON PRIVATE LIMITED | Plot | ~1,080–2,430 sqft (estimate: filed carpet plus 25%) | Jul 2028 |
| Adhya EnclaveLapsed · completion date passed | ADHYA DEVELOPERS | Plot | – | Dec 2023 |
| Affinity FidelityLapsed · completion date passed | SUDHAKARA REDDY ANNEM | Apartment | – | Jul 2022 |
| Affinity SarovarActive · 96% built | AFFINITY PROJECTS LLP | Apartment | 982–1,237 sqft carpet (as filed) | Sep 2027 |
| Alpine Pyramid EfghCompleted (regulator flag) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 57 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED |
| Apartment |
| 1,066 sqft carpet (as filed) |
| Completed |
| ArenaLapsed · completion date passed | Marudhar Infra | Mixed development | 628–1,053 sqft carpet (as filed) | Sep 2024 |
| Arvind Orchards (Phase 1 + 2)Applied for completion 05/10/2026 | Arvind SmartSpaces | Plot | 1,500–2,400 sqft | Dec 2029 |
8 of 89 other projects in Doddaballapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open The Pinnacle in the interactive atlas
Approval or registration
Land use converted
Tahasildhar/DC Bangalore Dist · Survey DA / 21-22-793/47/1/47/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey DA / 21-22-793/47/1/47/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan PRJ/5197/22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/472/PR/160224/006635
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | ICICI Bank · ₹5.88 Cr disbursed | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | DA / 21-22-793/47/1/47/2 | |
|---|---|---|
| Land extent, Sy DA / 21-22-793/47/1/47/2 | 1 Acre 14.08 Guntaas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 5,400 sq m | |
| Khata | A Khatha · BBMP · 21 Feb 2022 | |
| Joint development agreement number | 707 of Book 1, 2017-18 | |
|---|---|---|
| Landowner share | Not verified yet | |
| Developer share | Not verified yet | |
| Sale deed signed by | Not verified yet | |
| Building plan (BBMP) | Sanctioned 14 Feb 2023 · No. PRJ/5197/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2027 |
| Land conversion | Converted 23 Jan 2018 · Tahasildhar/DC Bangalore Dist | |
|---|---|---|
| Survey numbers | DA / 21-22-793/47/1/47/2 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
Apartments 3BHK59 2BHK61 · avg 81 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Apartments 3BHK59 2BHK61 | 120 | 873 |
| Sold, Q2 2026-27 | 42 / 120 | |
|---|---|---|
| Unsold, Q2 2026-27 | 78 | |
| Months to sell, derived from filed bookings | 44 months |
| Rubby Castle 1 | about 1 km | Locked | |
|---|---|---|---|
| Shriram Solitaire | about 3.5 km | Locked | |
| Sri Rama Enclave | about 3.5 km | Locked | |
| Vruksha Greens | about 3.5 km | Locked | |
| Century Kindle Phase 1 | about 4.5 km | Locked |
| The Pinnacle This project | This project is the point the others are measured from | 31 Dec 2027 | 35% (42 of 120) | Not verified yet |
|---|---|---|---|---|
| Rubby Castle 1 | about 1 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
| Shriram Solitaire | about 3.5 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Sri Rama Enclave |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2 km, Kammagondanahalli near MNTI Polytechnic | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Singapura Lake | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 35% | |
| Community Hall, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.17 (140 covered spaces for 120 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported it
Taken 7 Apr 2026| Main structure | 100% · planned by 15 Jan 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 70% · planned by 15 Jul 2026 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 98% | |
| Completion, accountant | 97% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2027 | |
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 30 Oct 2021 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.5 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 11 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹11.88 Cr 26.6%Development · ₹32.74 Cr 73.4%
| Estimated cost | ₹44.62 Cr | |
|---|---|---|
| Cost incurred | ₹43.30 Cr (97% of the estimate) | |
| Cost left | ₹1.32 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹6.27 Cr | |
| Land cost revision | Not verified yet | |
Sold (42) 35%Unsold (78) 65%
| Sold, Q3 2025-26 | 26 / 120 · 94 available | |
|---|---|---|
| Sold, Q4 2025-26 | 28 / 120 · 92 available | |
| Sold, Q1 2026-27 | 31 / 120 · 89 available | |
| Sold, Q2 2026-27 | 42 / 120 · 78 available | |
| Unsold, Q2 2026-27 | 78 | |
| Sold in Q4 2025-26 | 2 | |
| Sold in Q1 2026-27 | 3 | |
| Sold in Q2 2026-27 | 11 |
| Escrow bank | ICICI Bank · Matthikere | |
|---|---|---|
| Designated account, collected | ₹5.76 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.32 Cr in Q2 2026-27 (92% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹41,49,30,009 | |
| Net amount withdrawable, Form 4 | ₹28,21,80,009 | |
| Escrow account, Q4 2025-26 | ₹39.2 L deposited from sales, ₹50.0 L withdrawn | |
| Escrow account to date, Q4 2025-26 | ₹17.51 Cr deposited from sales, ₹15.24 Cr withdrawn | |
| Withdrawn from the escrow account to date | ₹13,27,50,000 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | ICICI Bank · ₹5.88 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 14 Feb 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · Matthikere | |
Taken 7 Apr 2026| Royal Enclave | about 5 km | Locked |
|---|
| Assetz Soho & Sky | about 7 km | Locked |
|---|
| 4square Park Sierra | about 7 km | Locked |
|---|
| Legacy Salvador | about 7 km | Locked |
|---|
| Cumins Sanctum | about 7.5 km | Locked |
|---|
| Godrej Aveline | about 8.5 km | Locked |
|---|
| Assetz Soho & Sky Phase 1b | about 8.5 km | Locked |
|---|
| about 3.5 km |
| 30 Sep 2026 |
| 61% (39 of 64) |
| Locked |
| Vruksha Greens | about 3.5 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
|---|
| Century Kindle Phase 1 | about 4.5 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
|---|
| Royal Enclave | about 5 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
|---|
| Projects within 4 km, counted | 17 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 3,461 | |
| Booked | 2,201 of 3,461 (64%) | |
| Unsold | 1,260 | |
| Booked a month, pooled | 28 flats | |
| Months to sell, pooled | 45 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 5 km, Jalahalli | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 22.5 |
| MG Road (CBD) | 13.5 |
| Manyata Tech Park | 9.5 |
| ITPL, Whitefield | 24 |
| Ecospace, Bellandur ORR | 23 |
| Electronic City Ph 1 | 30.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km to the south-east, named Vidyaranyapura Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 2.5 km to the north, named MS Palya Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Abbigere on OpenStreetMap |