Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | 1 | – | 2 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Affinity BrundaavanaExtended to 01-04-2027 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 49 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| AFFINITY PROJECTS |
| Apartment |
| 775–1,609 sqft carpet (as filed) |
| Apr 2027 |
| Alpine Pyramid - IrisActive · 42% built | ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED | Apartment | 729–1,004 sqft carpet (as filed) | Apr 2028 |
| Amigo EstellaCompleted · OC 06-04-2023 | AMIGOESTELLA INDIA LLP | Apartment | – | Completed |
| Arvind SporciaCompleted · OC 23-03-2018 | Arvind SmartSpaces Limited | Apartment | 3,768 sqft carpet (as filed) | Completed |
| Assetz Soho & Sky Phase 1bActive · 85% built | APG IMPERIAL HOMES PRIVATE LIMITED | Apartment | 1,370–1,886 sqft carpet (as filed) | Dec 2027 |
| Baldota SignatureCompleted · OC 29-12-2022 | BALDOTA BUILDERS AND DEVELOPERS | Apartment | – | Completed |
| BlissCompleted · OC 15-04-2023 | FINELINE INFRA PRIVATE LIMITED | Apartment | 758 sqft carpet (as filed) | Completed |
| Boulevard ResidencesCompleted · OC 27-01-2023 | SILVERTREE PROJECTS LLP | Apartment | 678–1,039 sqft carpet (as filed) | Completed |
8 of 38 other projects in Rachenahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open SNN Estates Felicity in the interactive atlas
Transfer of the land
Sale deed
Survey 35
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bengaluru · Survey 35
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bengaluru · Survey 34/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 35
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of SNN Builders Pvt. ltd · Survey 34/3, 35
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of SNN Builders Pvt. ltd · Survey 34/3, 35
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 34/3, 35
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 34/3, 35
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0020/22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/220124/006568
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 2 Jan 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 34/3, 35 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 26,304 sq m | |
| Khata | A Khatha · BBMP · 5 May 2022 | |
| Sale deed | Dated 19 Feb 1997, 6 May 2016 | |
| Sale deed in favour of | SNN Builders Pvt. ltd | |
| Building plan (BBMP) | Sanctioned 22 Dec 2023 · No. BBMP/Addl.Dir/JDNORTH/0020/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/1069/2017 | Clear |
| Environmental clearance | SEIAA 50 CON 2017 · issued 27 Apr 2017 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 13 May 2025 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 31 Dec 2028 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 34/3 | Converted 18 Jan 2016 · DC Bengaluru | |
| Sy 35, 35, 35, 35 | Converted 17 Apr 2015 · DC Bengaluru | |
| Survey numbers | 34/3 · 35 · 35 · 35 · 35 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
2BHK · avg 61 m² 54%3BHK · avg 86 m² 16.4%1.5BHK · avg 42 m² 13.4%2.5BHK · avg 71 m² 9%4BHK · avg 115 m² 7.2%
| 1.5BHK | 78 | 455 |
| 2BHK | 313 | 658 |
| 2.5BHK | 52 | 769 |
| 3BHK | 95 | 929 |
| 4BHK | 42 | 1,233 |
| Sold, Q2 2026-27 | 366 / 604 | |
|---|---|---|
| Unsold, Q2 2026-27 | 238 | |
| Months to sell, derived from filed bookings | 36 months |
| Sumadhura Epitome | 420 m | Locked | |
|---|---|---|---|
| Sumadhura Solea | 680 m | Locked | |
| Assetz Soho & Sky Phase 1b | 830 m | Locked | |
| Sobha City Athena | about 1.5 km | Locked |
| SNN Estates Felicity This project | This project is the point the others are measured from | 31 Dec 2028 | 61% (366 of 604) | Not verified yet |
|---|---|---|---|---|
| Sumadhura Epitome | 420 m | 31 Dec 2027 | 58% (152 of 262) | Locked |
| Sumadhura Solea | 680 m | 30 Jun 2029 | 14% (32 of 233) | Locked |
| Assetz Soho & Sky Phase 1b |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 1.4 km, Near Rachanahalli lake inlet | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 150 m to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 840 m to the south, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 9% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 15% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 20% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.26 (730 covered spaces for 580 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 50% · planned by 12 Dec 2026 | |
|---|---|---|
| Electrical and plumbing finishing | 16% · planned by 25 Apr 2028 | |
| Internal roads | Not verified yet | |
| Club house | 9% | |
| Completion | 58% | |
| Completion, accountant | 53.5% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 22 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 1 Jun 2022 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 12 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/1069/2017 | |
| Environmental clearance | SEIAA 50 CON 2017 · issued 27 Apr 2017 | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Chartered accountant, Form 4 | Dated 13 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹86.80 Cr 22%Development · ₹308.23 Cr 78%
| Estimated cost | ₹395.03 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q1 2026-27 | ₹440.00 Cr | |
| Cost incurred | ₹235.59 Cr (53.5% of the estimate) | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (366) 60.6%Unsold (238) 39.4%
| Sold, Q1 2026-27 | 346 / 604 · 258 available | |
|---|---|---|
| Sold, Q2 2026-27 | 366 / 604 · 238 available | |
| Unsold, Q2 2026-27 | 238 | |
| Sold in Q2 2026-27 | 20 |
| Escrow bank | STATE BANK OF INDIA · SME BRANCH JAYANAGAR | |
|---|---|---|
| Designated account, collected | ₹22.88 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹23.68 Cr in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| K-RERA registrations under this promoter | 10 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 1 | |
| Complaints filed against the promoter | 4 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 2 Jan 2024 | Review |
| Building plan (BBMP) | Sanctioned 22 Dec 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · SME BRANCH JAYANAGAR | |

Map of 7 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sumadhura Epitome, price locked; Sumadhura Solea, price locked; Assetz Soho & Sky Phase 1b, price locked; Lodha Mirabelle, price locked; Assetz Soho & Sky, price locked; Sattva La Vita, price locked; 4square Park Sierra, price locked.
| Cumins Sanctum | about 1.5 km | Locked |
|---|
| Brr North Excellency Phase I | about 1.5 km | Locked |
|---|
| Mirabelle Phase 2 | about 2 km | Locked |
|---|
| Lodha Mirabelle | 2.0 km | Locked |
|---|
| Assetz Soho & Sky | 2.4 km | Locked |
|---|
| Sattva La Vita | 2.6 km | Locked |
|---|
| 4square Park Sierra | 3.8 km | Locked |
|---|
| Nava Skanda Bellavita | about 4 km | Locked |
|---|
| 830 m |
| 31 Dec 2027 |
| 100% (120 of 120) |
| Locked |
| Sobha City Athena | about 1.5 km | 30 Sep 2027 | 100% (72 of 72) | Locked |
|---|
| Cumins Sanctum | about 1.5 km | 31 Dec 2031 | 29% (32 of 112) | Locked |
|---|
| Brr North Excellency Phase I | about 1.5 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹45,000 /mo · 33 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹28,000 /mo · 81 listings | |
| Rent, 1BHK, 3 km | ₹15,000 /mo · 30 listings | |
| Rent per sq ft, 3 km | ₹27.3 /mo, as listed · 80 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 64 (37 with an approximate location) | |
|---|---|---|
| Flats in them | 16,639 | |
| Booked | 9,808 of 16,639 (59%) | |
| Unsold | 6,831 | |
| Booked a month, pooled | 242 flats | |
| Months to sell, pooled | 28 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 220 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 150 m to the north, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 3.0 km, Nagawara | |
| Kempegowda Airport | 17.1 |
| MG Road (CBD) | 10.5 |
| Manyata Tech Park | 2.6 |
| ITPL, Whitefield | 15.3 |
| Ecospace, Bellandur ORR | 17.0 |
| Electronic City Ph 1 | 26.1 |
| Landfill or waste transfer station | 2.8 km to the west | |
|---|---|---|
| Sewage treatment plant | 1.2 km to the west, named Rachenahalli 10MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | 1.1 km to the north | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 810 m to the north |