Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 53 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Samhita Finesse in the interactive atlas
Transfer of the land
Sale deed
Survey 5/4
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner Bangalore · Survey 5/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · GRAMA PANCHAYATH, DODDABANAHALLI · Survey 5/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/NM/AS/AA-2/TS-4/E/05/2024-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/040425/007650
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of the survey sketch. Filed with K-RERA: ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey .
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 5/4 | |
|---|---|---|
| Land extent, Sy 5/4 | 21 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 2,023 sq m | |
| Khata | E Khatha · GRAMA PANCHAYATH, DODDABANAHALLI · 4 Dec 2023 | |
| Sale deed | Dated 17 Oct 2012 | |
| Building plan (BDA) | Sanctioned 16 Jan 2025 · No. BDA/NM/AS/AA-2/TS-4/E/05/2024-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 3 Jan 2023 · Deputy Commissioner Bangalore | |
|---|---|---|
| Survey numbers | 5/4 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
Apartments · avg 113 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Apartments | 24 | 1,211 |
| Sold, Q2 2026-27 | 0 / 24 | |
|---|---|---|
| Unsold, Q2 2026-27 | 24 |
| Godrej Woodscapes | about 0.5 km | Locked | |
|---|---|---|---|
| Sattva Songbird | about 0.5 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | about 2 km | Locked | |
| Chaithanya Sankhya | about 3.5 km | Locked | |
| Samhita Finesse This project | This project is the point the others are measured from | 31 Dec 2028 | 0% (0 of 24) | Not verified yet |
|---|---|---|---|---|
| Godrej Woodscapes | about 0.5 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
| Sattva Songbird | about 0.5 km | 6 May 2029 | 51% (704 of 1,379) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 4 km, TRIVENI NAGAR NEAR KR PURAM | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 2.5 km to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (24 covered spaces for 24 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | Not started · planned by 31 Dec 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Dec 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 44% | |
| Completion, accountant | 33.4% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 3 Apr 2025 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 10 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹8.44 Cr 31%Development · ₹18.80 Cr 69%
| Estimated cost | ₹27.24 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q1 2026-27 | ₹19.50 Cr | |
| Cost incurred | ₹6.50 Cr (33.4% of the estimate) | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Unsold (24) 100%
| Sold, Q3 2025-26 | 0 / 24 · 24 available | |
|---|---|---|
| Sold, Q4 2025-26 | 0 / 24 · 24 available | |
| Sold, Q1 2026-27 | 0 / 24 · 24 available | |
| Sold, Q2 2026-27 | 0 / 24 · 24 available | |
| Unsold, Q2 2026-27 | 24 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | Union Bank of India · PAI LAYOUT BANGALORE | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 16 Jan 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Union Bank of India · PAI LAYOUT BANGALORE | |

| One Residences At Sobha One World Ph4 W7 And 8 |
|---|
| about 3.5 km |
| Locked |
| One Residences At Sobha One World Ph5 W9,10,11 | about 3.5 km | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 3.5 km | Locked |
|---|
| Godrej Splendour Phase II | about 3.5 km | Locked |
|---|
| Neighbourhood Tree Park | about 4 km | Locked |
|---|
| Godrej Splendour | about 4 km | Locked |
|---|
| Godrej Parkshire (Hoskote) | about 4 km | Locked |
|---|
| Definer Upper Deck | about 4.5 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 |
|---|
| about 2 km |
| 31 Oct 2027 |
| 100% (238 of 238) |
| Locked |
| Chaithanya Sankhya | about 3.5 km | 30 Nov 2028 | 66% (29 of 44) | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 3.5 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 3.5 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
|---|
| Projects within 4 km, counted | 52 (52 with an approximate location) | |
|---|---|---|
| Flats in them | 19,803 | |
| Booked | 11,638 of 19,803 (59%) | |
| Unsold | 8,165 | |
| Booked a month, pooled | 283 flats | |
| Months to sell, pooled | 29 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 2.5 km to the west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 5.5 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 18 |
| MG Road (CBD) | 17.5 |
| Manyata Tech Park | 14 |
| ITPL, Whitefield | 6.5 |
| Ecospace, Bellandur ORR | 15 |
| Electronic City Ph 1 | 24 |
| Landfill or waste transfer station | about 2 km to the north-west, named Cheemasandra BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 0.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Kondaspura on OpenStreetMap |