Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | 1 | – | – | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) | Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Akkshara CountyApplied for completion 24/06/2022 | G KRISHNA KUMAR | Plot | – | Jul 2021 |
| Alur Phase 2Lapsed · completion date passed | Bangalore Development Authority | Apartment | 1,781 sqft carpet (as filed) | Mar 2018 |
| Arine Golden BellsLapsed · completion date passed | M/s.Arine Structures | Mixed development |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 2 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 2 | 1 | Review |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| – |
| Apr 2022 |
| Artemis Address (In Association With Mythreyi)Applied for completion 31/12/2025 | INDIABUILD REAL ESTATES PVT LTD | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
| Artemis Address Phase 2Active · 95% built | Address Maker | Plot | 1,200–1,500 sqft | Dec 2027 |
8 of 72 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Royale Township in the interactive atlas
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 13 Sep 2018 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
Page 1
Page 1 of 47 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 47 pages, English.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Area on the KGIS map | Not verified yet | |
|---|---|---|
| Land area of this registration | 2,05,327 sq m | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 24 | |
| RERA completion date | 31 Dec 2022 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Vruksha Greens | 8.2 km | Locked | |
|---|---|---|---|
| Royal Enclave | about 11.5 km | Locked | |
| Rubby Castle 1 | about 11.5 km | Locked |
| Royale Township This project | This project is the point the others are measured from | 31 Dec 2022 | Not filed | Not verified yet |
|---|---|---|---|---|
| Vruksha Greens | 8.2 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Royal Enclave | about 11.5 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
| Rubby Castle 1 |
| Projects within 4 km, counted | 1 | |
|---|---|---|
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | A 66 kV line passes 120 m from the filed location: close enough that its corridor may cross the site | Review |
| Nearest government-flagged flood location | 6.6 km, Shambhavinagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 2.6 km to the south-east, Arkavati, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 240 m to the east, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Dec 2022 | |
| Work began, as filed | 24 Jan 2017 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost |
|---|
| ₹52.48 Cr |
| Cost incurred | Not verified yet | |
|---|---|---|
| Cost left | Not verified yet | |
|---|---|---|
| Collected from buyers | Not verified yet | |
|---|---|---|
| Receivable, sold flats | Not verified yet | |
|---|---|---|
| Land cost revision | Not verified yet | |
|---|---|---|
| Escrow bank | UCO Bank · KORAMANGALA | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 24 | |
| Developer's project loan | Not verified yet | |
|---|---|---|
| Records searched to | 13 Sep 2018 | Review |
| Building plan | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | UCO Bank · KORAMANGALA | |
| about 11.5 km |
| 30 Apr 2029 |
| 25% (8 of 32) |
| Locked |
| Flats in them |
|---|
| 217 |
| Booked | 115 of 217 (53%) |
|---|
| Unsold | 102 |
|---|
| Booked a month, pooled | 0 flats |
|---|
| Months to sell, pooled | 230 months |
|---|
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Self development | |
| Nearest city water main | 7.0 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 2.6 km to the south-east, Arkavati, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 4.9 km, Madavara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 31.3 |
| MG Road (CBD) | 21.5 |
| Manyata Tech Park | 20.0 |
| ITPL, Whitefield | 34.1 |
| Ecospace, Bellandur ORR | 31.6 |
| Electronic City Ph 1 | 37.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 940 m to the north-east |