Overview
Overview
Overview
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| AuraLapsed · completion date passed | Darshan Gowda B A | Apartment | 945 sqft carpet (as filed) | Apr 2023 |
| BlisstonRegistered · no quarterly update yet | Gurusamy SelvaKumar | Apartment | 1,035 sqft carpet (as filed) | Sep 2026 |
| Brigade Gateway Enclave | Brigade Group | Apartment | 540–2,360 sqft | – |
| Candade Kay Arr SignatureCompleted · OC 29-03-2025 | KAY ARR & CO | Mixed development | 1,196 sqft carpet (as filed) | Completed |
| Construction Of 759 Du's In Bangalore CityLapsed · completion date passed | Karnataka Slum Development Board | Apartment | 494 sqft carpet (as filed) | May 2025 |
| Embassy Heritage | Embassy Group | Apartment | 1,300–2,200 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
| Govianu MargosaLapsed · completion date passed |
| Mahesh G |
| Apartment |
| – |
| Mar 2022 |
| Greenleaf BougainvilleaCompleted · OC 19-09-2024 | GREENLEAF DESIGN BUILD LLP | Apartment | 1,268 sqft carpet (as filed) | Completed |
8 of 20 other projects in Malleshwaram, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Roston is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Renaissance Srichakra | about 0.5 km, to a locality centre | Locked | |
|---|---|---|---|
| Vista Padmalaya | about 1.5 km, to a locality centre | Locked | |
| Birla Tisya | about 4 km, to a locality centre | Locked | |
| Magnolia Delight | about 4.5 km, to a locality centre | Locked | |
| Roston This project | This project is the point the others are measured from | Not on the filing | Not filed | Not verified yet |
|---|---|---|---|---|
| Renaissance Srichakra | about 0.5 km, to a locality centre | 11 Aug 2027 | 63% (5 of 8) | Locked |
| Vista Padmalaya | about 1.5 km, to a locality centre | 30 Apr 2027 | 40% (4 of 10) | Locked |
| Nearest storm drain | about 0.5 km from the locality centre, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km from the locality centre, Sankey | |
| Height above nearest drain | Not verified yet | |
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Not verified yet | |
| Nearest city water main | Not verified yet | |
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km from the locality centre, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | Not verified yet | |
| Landfill or waste transfer station | about 1.5 km from the locality centre | |
|---|---|---|
| Sewage treatment plant | about 2 km from the locality centre | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | None within 3 km of the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 1 km from the locality centre, named IISc MUSS on OpenStreetMap |
| about 5 km, to a locality centre |
| Locked |
| Vista Svara | about 5.5 km, to a locality centre | Locked |
|---|
| Sri Rama Enclave | about 6.5 km, to a locality centre | Locked |
|---|
| Assetz Soho & Sky | about 8 km, to a locality centre | Locked |
|---|
| Mirabelle Phase 2 | about 8 km, to a locality centre | Locked |
|---|
| Lodha Mirabelle | about 8.5 km, to a locality centre | Locked |
|---|
| Cumins Sanctum | about 8.5 km, to a locality centre | Locked |
|---|
| Vruksha Greens | about 8.5 km, to a locality centre | Locked |
|---|
| Birla Tisya | about 4 km, to a locality centre | 31 Dec 2026 | 100% (392 of 392) | Locked |
|---|
| Magnolia Delight | about 4.5 km, to a locality centre | 31 Mar 2028 | 21% (10 of 48) | Locked |
|---|
| Royal Enclave | about 5 km, to a locality centre | 31 Mar 2027 | 73% (44 of 60) | Locked |
|---|
| Vista Svara | about 5.5 km, to a locality centre | 30 Oct 2026 | 50% (16 of 32) | Locked |
|---|