Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 41 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Psr Platinum in the interactive atlas
Approval or registration
Land use converted
DC Office, Bangalore · Survey 170/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Kodathi Grama Panchayath · Survey 170/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan 33/2025-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/260226/008488
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 23 May 2026 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 170/2 | |
|---|---|---|
| Land extent, Sy 170/2 | 1 Acre 20 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 6,070 sq m | |
| Khata | E Khatha · Kodathi Grama Panchayath · 8 May 2025 | |
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 25 Aug 2025 · No. 33/2025-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/054/2023 · issued 9 Jun 2023 · building height 44.95 m | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-337840 · issued 26 May 2023 · valid until 25 May 2028 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2029 |
| Land conversion | Converted 20 Feb 2025 · DC Office, Bangalore | |
|---|---|---|
| Survey numbers | 170/2 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK · avg 88 m² 77.8%2BHK · avg 72 m² 22.2%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 26 | 774 |
| 3BHK | 91 | 942 |
| Sold, Q2 2026-27 | 0 / 117 | |
|---|---|---|
| Unsold, Q2 2026-27 | 117 |
| 63 Degree East - Tower E | about 0.5 km | Locked | |
|---|---|---|---|
| Mana Jardin Neo | about 1 km | Locked | |
| Orion Heights | about 1 km | Locked | |
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 1 km | Locked | |
| Psr Platinum This project | This project is the point the others are measured from | 31 Dec 2029 | 0% (0 of 117) | Not verified yet |
|---|---|---|---|---|
| 63 Degree East - Tower E | about 0.5 km | 31 Dec 2026 | 100% (399 of 399) | Locked |
| Mana Jardin Neo | about 1 km | 30 Dec 2032 | 27% (22 of 82) | Locked |
| Orion Heights |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2 km, Doddakannelli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 2 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Community Hall, built | 0% | |
| Gym, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.97 (114 covered spaces for 117 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Kodathi Grama Panchayath) | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
As the promoter reported it

| Main structure | Not started · planned by 10 Sep 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 25 Mar 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 0% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2029 | |
| RERA completion date | 31 Dec 2029 | |
| Work began, as filed | 1 Dec 2025 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 44.95 m on the fire NOC · 44.8 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 4.5 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/054/2023 · issued 9 Jun 2023 · building height 44.95 m | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 21 May 2026 · site inspected 15 May 2026 | |
| Engineer's certificate, registration | Dated 21 May 2026 | |
| Chartered accountant's certificate, registration | Dated 2 Jun 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹29.91 Cr 32.3%Development · ₹62.62 Cr 67.7%
| Estimated cost | ₹92.54 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹73.00 Cr | |
| Estimated cost, Form 4 Q4 2025-26 | ₹91.71 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Unsold (117) 100%
| Sold, Q4 2025-26 | 0 / 117 · 117 available | |
|---|---|---|
| Sold, Q1 2026-27 | 0 / 117 · 117 available | |
| Sold, Q2 2026-27 | 0 / 117 · 117 available | |
| Unsold, Q2 2026-27 | 117 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | Canara Bank · Hebbal | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 23 May 2026 | |
| Building plan (BDA) | Sanctioned 25 Aug 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Canara Bank · Hebbal | |

| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 |
|---|
| about 1 km |
| Locked |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 1 km | Locked |
|---|
| Birla Evara | about 1.5 km | Locked |
|---|
| Haven Phase 2 | about 2.5 km | Locked |
|---|
| Satori Residence By Genurise | about 2.5 km | Locked |
|---|
| Assetz Muse & Maison | about 3 km | Locked |
|---|
| Assetz Ren & Rei | about 3 km | Locked |
|---|
| Adarsh Rosewood | about 3.5 km | Locked |
|---|
| about 1 km |
| 31 Dec 2025 |
| 65% (106 of 163) |
| Locked |
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 1 km | 30 Jun 2026 | 100% (113 of 113) | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 1 km | 30 Jun 2026 | 100% (151 of 151) | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 1 km | 30 Jun 2026 | 100% (227 of 227) | Locked |
|---|
| Projects within 4 km, counted | 73 (73 with an approximate location) | |
|---|---|---|
| Flats in them | 22,870 | |
| Booked | 12,874 of 22,870 (56%) | |
| Unsold | 9,996 | |
| Booked a month, pooled | 373 flats | |
| Months to sell, pooled | 26 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 2 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 5.5 km, Bellandur | |
| Kempegowda Airport | 34.5 |
| MG Road (CBD) | 15.5 |
| Manyata Tech Park | 20 |
| ITPL, Whitefield | 11 |
| Ecospace, Bellandur ORR | 5.5 |
| Electronic City Ph 1 | 6.5 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1 km |
|---|