Building plan (Satellite Town Ring Road Planning Authority)Sanctioned 18 Mar 2026No. STRRPA/TP/LAO/44/2025-26
RERA extensionsNone on the filingFiling read 20 Oct 2026
RERA complaints0✓ClearClear
Land conversionConverted, 12 of 12 parcelsDates and authorities below
Permits
Validity
Not verified yet
Approval letters
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land4 cases
Cases on the builder217 cases
RERA complaintsNo cases
Builder's other projects137 cases
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Forfeiture, agreementNot verified yet
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Not verified yet
Payments
Payment plan
Not verified yet
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Recent price, super built-upNot verified yet
Recent price, carpetNot verified yet
Phase 1 → Phase 2Not verified yet
Gross yield, per sq ftNot verified yet
This project
Price
Price per sq ft, super built-up
Not verified yet
Form 4 certified totals
Location & risks
What is the location like?
Height above nearest drainNot verified yet
Groundwater, taluk average19.3 m below groundDevanahalli taluk, July 2023
Water supply, as filedBorewell, Local authority (Bidlur Grama Panchayat)Declared by the promoter
Metro, under constructionabout 9.5 kmAirport City, under construction
The site
Zoning & hazards
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion30%As of Q2 2026-27, promoter's return
Possession, agreementNot verified yet
StructureNot verified yet
Structural safety certificateNot verified yet
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Receivable, sold flats₹314.37 CrAs of Q1 2026-27
Cost left₹185.40 CrAs of Q1 2026-27
SoldNot verified yet
Sold in the latest quarterNot verified yet
Funding
Estimated cost
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed204On K-RERA
Available18390% of filed
K-RERA only21
Approvals with a validity dateNone read
Approvals & NOCs
K-RERA only
K-RERA only
K-RERA only
K-RERA only
Filed 2 Jun 2026Available
Filed 2 Jun 2026Available
Filed 2 Jun 2026Available
Filed 2 Jun 2026Available
Filed 2 Jun 2026Available
Source: K-RERA project page and the documents filed there, as read by us. 33 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro line (dashed: planned)
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Prestige Gardenia Phase 2 in the interactive atlas
Khata
Extent
Survey 2
2/1
18 Nov 2025Deputy Commissioner
2 Mar 2026in favour of M/s.Trishul Buildtech & Infrastructures Pvt Ltd.,
10 Feb 20262 Acre 01 Gunta · Bidalur Grama Panchayat
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Approximate location: the filed pin, good to the neighbourhood, not the plot
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
Water at a glance
Groundwater
Devanahalli taluk average, July 2023: 19.3 m below ground
What it means
Not verified yet
Water below ground
19.3 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Borewell, Local authority (Bidlur Grama Panchayat)
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro line (dashed: planned)
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot