Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | 1 | – | 3 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 3 Little BirdsRegistered · no quarterly update yet | Zenso Little Birds Projects LLP | Apartment | 724 sqft carpet (as filed) | Sep 2026 |
| Adarsh Palm Acres - Phase 1-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 1,604 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part AFiled as completed · no completion certificate on record | Bangalore Best Realty Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Bangalore Best Realty Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 75 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh Palm Acres - Phase 2-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 2-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 3,111 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres (Phase III)Active · 3% built | Adarsh Developers | Villa | 3,150–5,687 sqft | 2028 |
8 of 67 other projects in Bagalur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Livingtree By Kalyani Developers in the interactive atlas
Approval or registration
Building plan sanctioned
KIADB · plan DO3-KIADB-00156/23-24/BP
K-RERA filing, approvals
Approval or registration
Khata issued
A Khatha · Panchayati Raj · Survey 430, 452, 455, 456, 4
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/260924/007084
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 430,452' 453''454' 455' 456' 4 | |
|---|---|---|
| Land extent, Sy 430,452' 453''454' 455' 456' 4 | 1,01,171 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,01,171 sq m | |
| Khata | A Khatha · Panchayati Raj · 31 Aug 2024 | |
Valid as of this reportValidity ended
| Building plan (KIADB) | Sanctioned 14 May 2024 · No. DO3-KIADB-00156/23-24/BP | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/315/2023 · issued 20 Oct 2023 | Clear |
| Environmental clearance | SEIAA 66 CON 2023 · EC identification no. EC23B038KA176609 · issued 28 Nov 2023 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-346909 · issued 6 Jan 2025 · valid until 27 Nov 2033 | Clear |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 4 | |
| RERA completion date | 15 Sep 2029 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 430,452' 453''454' 455' 456' 4 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
Residential Apartments · avg 45 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Residential Apartments | 2,736 | 479 |
| Sold, Q2 2026-27 | 2,287 / 2,736 | |
|---|---|---|
| Unsold, Q2 2026-27 | 449 | |
| Months to sell, derived from filed bookings | 12 months |
| Assetz Sora & Saki Phase 2 | about 0.5 km | Locked | |
|---|---|---|---|
| Assetz Sora & Saki Phase 3 | about 0.5 km | Locked | |
| Kumar Plumeria | about 2.5 km | Locked | |
| Birla Trimaya | about 5 km | Locked | |
| Assetz Zen & Sato |
| Livingtree By Kalyani Developers This project | This project is the point the others are measured from | 15 Sep 2029 | 84% (2,287 of 2,736) | Not verified yet |
|---|---|---|---|---|
| Assetz Sora & Saki Phase 2 | about 0.5 km | 31 Jul 2029 | 38% (242 of 634) | Locked |
| Assetz Sora & Saki Phase 3 | about 0.5 km | 30 Apr 2029 | 30% (92 of 304) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 9 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, Ponnaiyar, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (2,736 covered spaces for 2,736 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Other | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 46% · planned by 15 Sep 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 15 Mar 2029 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 45% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 15 Oct 2029 | |
| RERA completion date | 15 Sep 2029 | |
| Work began, as filed | 15 Sep 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 80.45 m filed, 6 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 150 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/315/2023 · issued 20 Oct 2023 | |
| Environmental clearance | SEIAA 66 CON 2023 · EC identification no. EC23B038KA176609 · issued 28 Nov 2023 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Chartered accountant's certificate, registration | Dated 3 Sep 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹133.72 Cr 14.7%Development · ₹775.25 Cr 85.3%
| Estimated cost | ₹908.97 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (2,287) 83.6%Unsold (449) 16.4%
| Sold, Q3 2025-26 | 1,950 / 2,736 · 786 available | |
|---|---|---|
| Sold, Q4 2025-26 | 2,115 / 2,736 · 621 available | |
| Sold, Q1 2026-27 | 2,175 / 2,736 · 561 available | |
| Sold, Q2 2026-27 | 2,287 / 2,736 · 449 available | |
| Unsold, Q2 2026-27 | 449 | |
| Sold in Q4 2025-26 | 165 | |
| Sold in Q1 2026-27 | 60 | |
| Sold in Q2 2026-27 | 112 |
| Escrow bank | ICICI Bank · J P Nagar | |
|---|---|---|
| Designated account, collected | ₹115.93 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹66.70 Cr in Q2 2026-27 (58% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 4 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (KIADB) | Sanctioned 14 May 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · J P Nagar | |

| about 5 km |
| Locked |
| Birla Trimaya Phase-2 | about 5 km | Locked |
|---|
| Ekta Elements | about 5.5 km | Locked |
|---|
| Birla Trimaya Phase-3 | about 5.5 km | Locked |
|---|
| Varnam Phase 1c | about 5.5 km | Locked |
|---|
| Sattva City | about 6 km | Locked |
|---|
| Barca II At Godrej Msr City | about 6 km | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 6 km | Locked |
|---|
| Kumar Plumeria | about 2.5 km | 31 Dec 2028 | 5% (5 of 100) | Locked |
|---|
| Birla Trimaya | about 5 km | 15 Dec 2031 | 90% (494 of 548) | Locked |
|---|
| Assetz Zen & Sato | about 5 km | 31 May 2030 | 44% (202 of 456) | Locked |
|---|
| Birla Trimaya Phase-2 | about 5 km | 20 Jun 2029 | 99% (470 of 473) | Locked |
|---|
| Projects within 4 km, counted | 16 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 12,045 | |
| Booked | 8,873 of 12,045 (74%) | |
| Unsold | 3,172 | |
| Booked a month, pooled | 182 flats | |
| Months to sell, pooled | 13 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, Ponnaiyar, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 6 km, Bettahalasuru | |
| Kempegowda Airport | 12 | 7 |
| MG Road (CBD) | 23.5 | 20.5 |
| Manyata Tech Park | 17 | 12.5 |
| ITPL, Whitefield | 28.5 | 18.5 |
| Ecospace, Bellandur ORR | 34.5 | 24 |
| Electronic City Ph 1 | 43.5 | 33.5 |
| Landfill or waste transfer station | about 1.5 km, named Bagalur Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Bagalur Substation on OpenStreetMap |