| 1 Lakh Multi - Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Apr 2023 |
| 99d By SanthustaActive · 100% built | M/s. SANTHUSTA INFRACON PRIVATE LIMITED | Plot | ~1,080–2,430 sqft (estimate: filed carpet plus 25%) | Jul 2028 |
| Adhya EnclaveLapsed · completion date passed | ADHYA DEVELOPERS | Plot | – | Dec 2023 |
| Affinity FidelityLapsed · completion date passed | SUDHAKARA REDDY ANNEM | Apartment | – | Jul 2022 |
| Affinity SarovarActive · 96% built | AFFINITY PROJECTS LLP | Apartment | 982–1,237 sqft carpet (as filed) | Sep 2027 |
| Alpine Pyramid EfghCompleted (regulator flag) |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 40 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Valuation |
|---|
| – |
| – |
| – |
| Not verified |
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED |
| Apartment |
| 1,066 sqft carpet (as filed) |
| Completed |
| ArenaLapsed · completion date passed | Marudhar Infra | Mixed development | 628–1,053 sqft carpet (as filed) | Sep 2024 |
| Arvind Orchards (Phase 1 + 2)Applied for completion 05/10/2026 | Arvind SmartSpaces | Plot | 1,500–2,400 sqft | Dec 2029 |
8 of 89 other projects in Doddaballapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Lake Estates in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (Local Planning Authority) | Sanctioned 20 Jun 2023 · No. Doddaballapura Planning Authority | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-335550 · issued 16 Jan 2023 · valid until 28 Dec 2028 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | Granted · Approved 29 Aug 2025 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2027 |
| Land conversion | 7 of 7 parcels converted | |
|---|---|---|
| Sy 46/2, 46/3, 48/14, 49, 76/7, 76/8 | Converted 25 Feb 2022 · DC Bengaluru | |
| Sy 46/4 | Converted 12 Aug 2022 · DC Bengaluru | |
| Survey numbers | 46/2 · 46/3 · 46/4 · 48/14 · 49 · 76/7 · 76/8 |
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Assetz Miru & Miyo | about 3 km | Locked | |
|---|---|---|---|
| Riviera Glade | about 6.5 km | Locked | |
| Century Kindle Phase 1 | 8.1 km | Locked | |
| Shriram Solitaire | about 8.5 km | Locked | |
| Godrej Aveline | 9.6 km | Locked |
| Lake Estates This project | This project is the point the others are measured from | 30 Jun 2027 | Not filed | Not verified yet |
|---|---|---|---|---|
| Assetz Miru & Miyo | about 3 km | 31 Mar 2031 | 6% (20 of 350) | Locked |
| Riviera Glade | about 6.5 km | 31 Dec 2030 | 28% (31 of 112) | Locked |
| Century Kindle Phase 1 |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture, at the filed pin | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 8.5 km, Attur, Near Dairy Circle | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 180 m to the south-west, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 75% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 30 Jun 2025 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 30 Jun 2027 | |
| Work began, as filed | 1 Sep 2023 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jun 2026, Jun 2026, Jul 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Chartered accountant, Form 4 | Dated 15 Jul 2026 | |
Land · ₹4.64 Cr 40.3%Development · ₹6.86 Cr 59.7%
| Estimated cost | ₹11.50 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | ₹2.87 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Axis Bank · Rajajinagar Bengaluru | |
|---|---|---|
| Designated account, collected | ₹0 in Q1 2026-27 | |
| Designated account, withdrawn | ₹0 in Q1 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Not verified yet | |
|---|---|---|
| Records searched to | Not verified yet | |
|---|---|---|
| Building plan | Sanctioned 20 Jun 2023 |
|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| Sale deed in favour of | Not verified yet | |
|---|---|---|
| Escrow bank | Axis Bank · Rajajinagar Bengaluru |
|---|

| Sattva City | 9.8 km | Locked |
|---|
| Tnm Lakeview | about 10 km | Locked |
|---|
| Legacy Salvador | about 10.5 km | Locked |
|---|
| 4square Park Sierra | 11.0 km | Locked |
|---|
| Rubby Castle 1 | about 11 km | Locked |
|---|
| Assetz Zen & Sato | about 11 km | Locked |
|---|
| Godrej MSR City | 11.3 km | Locked |
|---|
| 8.1 km |
| 14 Mar 2031 |
| 73% (336 of 458) |
| Locked |
| Shriram Solitaire | about 8.5 km | 15 May 2026 | 100% (269 of 269) | Locked |
|---|
| Godrej Aveline | 9.6 km | 31 Mar 2031 | 91% (769 of 849) | Locked |
|---|
| Sattva City | 9.8 km | 28 Feb 2032 | 17% (425 of 2,491) | Locked |
|---|
| Projects within 4 km, counted | 8 (6 with an approximate location) | |
|---|---|---|
| Flats in them | 2,546 | |
| Booked | 1,408 of 2,546 (55%) | |
| Unsold | 1,138 | |
| Booked a month, pooled | 50 flats | |
| Months to sell, pooled | 23 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Rajanukunte Grama Panchayathi) | |
| Nearest city water main | 6.1 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 8.2 km, Bettahalasuru | |
| Kempegowda Airport | 16.8 |
| MG Road (CBD) | 23.5 |
| Manyata Tech Park | 16.9 |
| ITPL, Whitefield | 29.6 |
| Ecospace, Bellandur ORR | 31.7 |
| Electronic City Ph 1 | 40.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 970 m to the south-west |